Meizhouwan power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Meizhouwan power station (国投云顶湄洲湾电厂) is an operating power station of at least 2786-megawatts (MW) in Dongbu Town, Xiuyu, Putian, Fujian, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Meizhouwan power station | Dongbu Town, Xiuyu, Putian, Fujian, China | 25.1608278, 119.0333354 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Unit R1, Unit R2: 25.1608278, 119.0333354
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: bituminous[2] | 393 | subcritical | 2001 | 2027 (planned)[3] | False |
| Phase I Unit 2 | Operating | coal: bituminous[2] | 393 | subcritical | 2001 | 2027 (planned)[3] | False |
| Phase II Unit 3 | Operating | coal: bituminous[2] | 1000 | ultra-supercritical | 2017 | – | False |
| Phase II Unit 4 | Operating | coal: bituminous[2] | 1000 | ultra-supercritical | 2017 | – | False |
| Phase III Unit 5 | Construction[4] | coal: unknown[2][1] | 660[1] | ultra-supercritical[1] | 2027 (planned)[4] | – | False |
| Phase III Unit 6 | Construction[4] | coal: unknown[2][1] | 660[1] | ultra-supercritical[1] | 2027 (planned)[4] | – | False |
| Unit R1 | Announced[5] | coal: unknown[6][2] | 660[5] | ultra-supercritical[6] | – | – | False |
| Unit R2 | Announced[5] | coal: unknown[6][2] | 660[5] | ultra-supercritical[6] | – | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Phase I Unit 2 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Phase II Unit 3 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Phase II Unit 4 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Phase III Unit 5 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Phase III Unit 6 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Unit R1 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
| Unit R2 | SDIC Yunding Meizhouwan Power Co Ltd [100%][1] | SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%] |
Project-level coal details
- Coal source(s): domestic/imported
- Permit(s): 闽发改网审能源函〔2023〕171号[4]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Financing
- Cost and source of financing: InterGen, Genting Group and others. Total investment = 7 billion yuan[7]
Background
The two existing coal-fired units of Meizhou Wan power station, totaling 786 MW, were brought online in 2001. The plant is owned by SDIC and Genting Group.[8][9]
Description of Expansion
SDIC is currently building two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW.[7] The new units are scheduled to be completed in 2017.[10]
One of the units was commissioned in July 2017.[11] The other unit was commissioned in September 2017.[12]
Phase III Units 5 & 6
In 2024, Phase III project received its environmental impact assessment and proceeded with EPC bidding.[13][14] The EPC contract was signed in early 2025, followed by major equipment tenders and main construction commencement in July 2025.[15][16] Unit 5's construction was ongoing through 2026, with milestones including the completion of the chimney and boiler girder hoisting.[17][18]
Unit 6's construction also progressed in 2025, with the first boiler steel structure hoisting completed in October.[19] In May 2026, the boiler girders for Unit 6 were hoisted.[20]
Replacement Units R1 & R2
In early 2026, a feasibility study was awarded for a project to retire the existing Phase I units and replace them with two new 660MW units.[21]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 https://sthjt.fujian.gov.cn/zwgk/ywxx/hpsp/huanpingshenpi/202412/t20241223_6596654.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://mp.weixin.qq.com/s/kRUHSDsoxJ17ZZmTZkftYQ.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://news.bjx.com.cn/html/20250721/1451926.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 https://news.bjx.com.cn/html/20260128/1481620.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 6.3 https://mp.weixin.qq.com/s/XmIJ3uAzTZld7V7T7bxj0g.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 “湄洲湾电厂二期项目,” 莆田市湄洲湾北岸经济开发区 2013-02-07
- ↑ "Coal-Fired Plants Financed by International Public Investment Institutions Since 1994", Appendix to Foreclosing the Future: Coal, Climate and International Public Finance: Investment in coal-fired power plants hinders the fight against global warming, Environmental Defense, April 2009.
- ↑ "福建太平洋电力有限公司(“福建太平洋电力”、“湄洲湾一期”)," SDIC, accessed Oct 2016
- ↑ "湄洲湾第二发电厂:年底有望“双投产”," 2016年09月11日
- ↑ "国投电力:湄洲湾二期4号机组投产," 证券时报网 2017-07-21
- ↑ "国投集团湄洲湾百万机组实现双投"中电新闻网 2017/9/30
- ↑ "国投湄洲湾第三发电厂2×660MW机组项目节能审查意见". BeiJiXing (BJX) News. 2024-07-15. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国投湄洲湾第三发电厂2×660MW机组项目工程建设EPC总承包项目招标公告". BeiJiXing (BJX) News. 2024-11-19. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "中国能建西南院与国投湄洲湾(莆田)发电有限公司举办国投湄洲湾第三发电厂2×660MW机组项目工程建设EPC总承包项目合同签约仪式". BeiJiXing (BJX) News. 2025-02-06. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国投湄洲湾第三发电厂2×660MW超超临界燃煤机组项目开工仪式圆满完成". BeiJiXing (BJX) News. 2025-07-21. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国投湄洲湾第三发电厂烟囱顺利结顶". WeChat. 2026-05-26. Retrieved 2026-07-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国投湄洲湾第三发电厂#5锅炉大板梁吊装就位". WeChat. 2026-06-12. Retrieved 2026-07-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国投湄洲湾第三发电厂2×660MW机组项目#6机组锅炉钢结构首吊顺利完成". SDIC Meizhouwan Power. 2025-10-11. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国投湄洲湾第三发电厂#6锅炉大板梁吊装完成". WeChat. 2026-05-12. Retrieved 2026-07-22.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福建闽投湄洲湾电厂一期"上大压小"2×660MW工程可行性研究报告评审服务项目采购结果公告". WeChat. 2026-01-22. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)