Meizhouwan power station (国投云顶湄洲湾电厂) is an operating power station of at least 2786-megawatts (MW) in Dongbu Town, Xiuyu, Putian, Fujian, China with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Meizhouwan power station Dongbu Town, Xiuyu, Putian, Fujian, China 25.1608278, 119.0333354 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Unit R1, Unit R2: 25.1608278, 119.0333354

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year Emergency/Backup
Phase I Unit 1 Operating coal: bituminous[2] 393 subcritical 2001 2027 (planned)[3] False
Phase I Unit 2 Operating coal: bituminous[2] 393 subcritical 2001 2027 (planned)[3] False
Phase II Unit 3 Operating coal: bituminous[2] 1000 ultra-supercritical 2017 – False
Phase II Unit 4 Operating coal: bituminous[2] 1000 ultra-supercritical 2017 – False
Phase III Unit 5 Construction[4] coal: unknown[2][1] 660[1] ultra-supercritical[1] 2027 (planned)[4] – False
Phase III Unit 6 Construction[4] coal: unknown[2][1] 660[1] ultra-supercritical[1] 2027 (planned)[4] – False
Unit R1 Announced[5] coal: unknown[6][2] 660[5] ultra-supercritical[6] – – False
Unit R2 Announced[5] coal: unknown[6][2] 660[5] ultra-supercritical[6] – – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Phase I Unit 2 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Phase II Unit 3 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Phase II Unit 4 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Phase III Unit 5 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Phase III Unit 6 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Unit R1 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]
Unit R2 SDIC Yunding Meizhouwan Power Co Ltd [100%][1] SDIC Power Holdings Co Ltd [51.0%]; Genting MZW Pte Ltd [49.0%]

Project-level coal details

  • Coal source(s): domestic/imported
  • Permit(s): 闽发改网审能源函〔2023〕171号[4]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Financing

  • Cost and source of financing: InterGen, Genting Group and others. Total investment = 7 billion yuan[7]

Background

The two existing coal-fired units of Meizhou Wan power station, totaling 786 MW, were brought online in 2001. The plant is owned by SDIC and Genting Group.[8][9]

Description of Expansion

SDIC is currently building two additional coal-fired units at this plant, with a total planned capacity of 2,000 MW.[7] The new units are scheduled to be completed in 2017.[10]

One of the units was commissioned in July 2017.[11] The other unit was commissioned in September 2017.[12]

Phase III Units 5 & 6

In 2024, Phase III project received its environmental impact assessment and proceeded with EPC bidding.[13][14] The EPC contract was signed in early 2025, followed by major equipment tenders and main construction commencement in July 2025.[15][16] Unit 5's construction was ongoing through 2026, with milestones including the completion of the chimney and boiler girder hoisting.[17][18]

Unit 6's construction also progressed in 2025, with the first boiler steel structure hoisting completed in October.[19] In May 2026, the boiler girders for Unit 6 were hoisted.[20]

Replacement Units R1 & R2

In early 2026, a feasibility study was awarded for a project to retire the existing Phase I units and replace them with two new 660MW units.[21]

Articles and Resources

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 https://sthjt.fujian.gov.cn/zwgk/ywxx/hpsp/huanpingshenpi/202412/t20241223_6596654.htm. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://mp.weixin.qq.com/s/kRUHSDsoxJ17ZZmTZkftYQ. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 https://news.bjx.com.cn/html/20250721/1451926.shtml. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 https://news.bjx.com.cn/html/20260128/1481620.shtml. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 6.3 https://mp.weixin.qq.com/s/XmIJ3uAzTZld7V7T7bxj0g. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 “湄洲湾电厂二期项目,” 莆田市湄洲湾北岸经济开发区 2013-02-07
  8. ↑ "Coal-Fired Plants Financed by International Public Investment Institutions Since 1994", Appendix to Foreclosing the Future: Coal, Climate and International Public Finance: Investment in coal-fired power plants hinders the fight against global warming, Environmental Defense, April 2009.
  9. ↑ "福建太平洋电力有限公司(“福建太平洋电力”、“湄洲湾一期”)," SDIC, accessed Oct 2016
  10. ↑ "湄洲湾第二发电厂:年底有望“双投产”," 2016年09月11日
  11. ↑ "国投电力:湄洲湾二期4号机组投产," 证券时报网 2017-07-21
  12. ↑ "国投集团湄洲湾百万机组实现双投"中电新闻网 2017/9/30
  13. ↑ "国投湄洲湾第三发电厂2×660MW机组项目节能审查意见". BeiJiXing (BJX) News. 2024-07-15. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "国投湄洲湾第三发电厂2×660MW机组项目工程建设EPC总承包项目招标公告". BeiJiXing (BJX) News. 2024-11-19. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "中国能建西南院与国投湄洲湾(莆田)发电有限公司举办国投湄洲湾第三发电厂2×660MW机组项目工程建设EPC总承包项目合同签约仪式". BeiJiXing (BJX) News. 2025-02-06. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "国投湄洲湾第三发电厂2×660MW超超临界燃煤机组项目开工仪式圆满完成". BeiJiXing (BJX) News. 2025-07-21. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "国投湄洲湾第三发电厂烟囱顺利结顶". WeChat. 2026-05-26. Retrieved 2026-07-22.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "国投湄洲湾第三发电厂#5锅炉大板梁吊装就位". WeChat. 2026-06-12. Retrieved 2026-07-22.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "国投湄洲湾第三发电厂2×660MW机组项目#6机组锅炉钢结构首吊顺利完成". SDIC Meizhouwan Power. 2025-10-11. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "国投湄洲湾第三发电厂#6锅炉大板梁吊装完成". WeChat. 2026-05-12. Retrieved 2026-07-22.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ "福建闽投湄洲湾电厂一期"上大压小"2×660MW工程可行性研究报告评审服务项目采购结果公告". WeChat. 2026-01-22. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)