Inner Mongolia Changcheng power station (蒙能内蒙古长城发电厂) is an operating power station of at least 2000-megawatts (MW) in Shanghaimiao Town, Otog Front Banner, Ordos, Inner Mongolia, China. It is also known as Mengneng Shanghai Miao power station, Huaneng Shanghaimiao power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Inner Mongolia Changcheng power station Shanghaimiao Town, Otog Front Banner, Ordos, Inner Mongolia, China 38.249688, 106.657876 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 38.249688, 106.657876

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 operating coal - unknown 1000 ultra-supercritical 2023
Unit 2 operating[1] coal - unknown 1000 ultra-supercritical 2023[1]

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Inner Mongolia Changcheng Power Generation Co Ltd [100.0%]
Unit 2 Inner Mongolia Changcheng Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): August 2017

Background on Project

Inner Mongolia Energy Generation & Investment Group and partners are seeking approval for a 2 x 1,000 MW ultra-supercritical power station at Shanghaimiao Town in Otog Front Banner.[2][3][4][5]

Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity

In January 2017 China's National Energy Administration proposed the suspension of over 100 planned and under-construction coal power projects with a total capacity of about 100GW in 13 provinces, including Huaneng Shanghaimiao.[6]

For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.

August 2017: Plant permitted

Inner Mongolia Changcheng power station was approved for construction by Inner Mongolia Autonomous Region Development and Reform Commission in August 2017. It was described as a power transmission project.[7]

2020: Construction begins

In October 2020 it was reported that the plant is under construction.[8]

2023: Operation started

On 21 July 2023, Unit 1 passed 168 hours test run and entered commercial operation.[9][10]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240125131012/https://news.bjx.com.cn/html/20230928/1334751.shtml. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. "春到上海庙," s鄂尔多斯日报, 2015/4/8
  3. "北方联合电力长城电厂2×1000MW机组新建项目环境影响评价第二次公众参与信息公示," Ordos Online, 2015-07-08
  4. "内蒙古蒙能集团上海庙2×1000MW发电机组工程环境影响评价第一次公众参与信息公示," Ordos Online, 2015-05-08
  5. "上海庙经济开发区煤电项目前期工作稳步推进," SEDZ, June 6, 2016
  6. "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, Jan 16, 2017
  7. "北方联合电力长城电厂2×1000MW机组工程项目获内蒙古自治区发改委核准," Ordos.gov, 2017-08-25
  8. "蒙能集团重要项目建设快马加鞭". nmg.sina.com.cn. 2020-10-15. Retrieved 2020-12-17.{{cite web}}: CS1 maint: url-status (link)
  9. 鄂托克前旗能源局 (2023-07-21). "2×1000MW!内蒙古长城发电上海庙煤电项目1号机组正式投运". 北极星火电网. Retrieved 2023-8-18. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. "内蒙古能源集团长城发电公司一号机组成功投产". 电力项目圈. 2023-07-22. Retrieved 2023-8-18. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)