Ayas power station

From Global Energy Monitor
(Redirected from Misis Ayas power station)
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Ayas power station (Ayas Enerji Santrali) is a cancelled power station in Sugözü, Yumurtalık, Adana, Türkiye.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Ayas power station Sugözü, Yumurtalık, Adana, Türkiye 36.82211, 35.86753 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1: 36.82211, 35.86753

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 cancelled coal - bituminous 625.5 supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Ayas Enerji Üretim Veticaret AŞ [100.0%]

Project-level coal details

  • Coal source(s): imported

Background

The Ayas Enerji plant is a proposal of Ayas Enerji — a 50-50 partnership between Ordu Yardımlaşma Kurumu (OYAK, the Turkish armed forces pension fund), and AES Entek (itself a 50-50 partnership between Koç Holding and the U.S.-based AES Corporation). It was originally a two-unit, 1,230-MW proposal, with the first 615-MW unit to be built initially, and the second at some unspecified later date.[1][2][3]

In April 2009, the project received a license for an 800 MW plant from the Energy Market Regulatory Authority (EPDK). Site preparation work was reported as completed, and conducted by EKTON Construction & Logistics.[4]

A 2014 Ayas presentation reported the plant had been downsized to 625 MW.[5] The project's cost is listed as 1.2 billion lira, or US$460 million.[6]

In 2014 AES sold out to Koç.[7]

In March 2015, Ayas Enerji held an environmental permitting public hearing in Sugözü.[8] Activists and community members with Adana Environmental Platform protested at the meeting.[9] The project's license was challenged due to a high concentration of proposed plants in the area.[10]

As of March 2018 the project exists only on the Turkish section of the Koç website.[11]

In December 2018 the 13th Chamber of the Council of State was expected to decide on a lawsuit filed by Eastern Mediterranean Environment Associations (DAÇE) to have the plant's license revoked. The suit argues that the plant should not be licensed or built because of its impact on global heating.[12]

According to the Energy Market Regulatory Authority (EMRA) the plant was under construction and 19% complete as of January 2019.[13] However satellite photography from Planet shows only ground-clearing occurring at the site between January 2019 and June 2019.

In May 2020 the website for Ayas stated that the project was still in the investment stage.[14] In March 2021 EMRA cancelled the plant's license, and it appears to be cancelled.[15]

Financing

The Royal Bank of Scotland is acting as financial adviser for the project.[16]

Fuel source

The plant would burn imported coal, from Russia, the Americas, or South Africa.[17]

Articles and Resources

References

  1. Ayas Enerji Üretim Veticaret A.Ş., OYAK website, accessed Mar. 2014.
  2. OYAK 2012 Annual Report, pp. 17, 60.
  3. AES Joint Venture Signs Partnership Agreement with Turkey's Largest Pension Fund to Develop Power Project in South East Turkey, AES press release, Dec. 20, 2011.
  4. Ayas Energy Production Company, EKTON website, accessed Mar. 2014.
  5. "AYGAZ Investor Presentation," May 2014
  6. Misis Termik Santrali`nde ÇED süreci başladı, Enerji Günlüğü, 12 Feb. 2015.
  7. "AES Corp pulls out of Turkey", Utilities ME, October 14, 2014.
  8. Yumurtalık'a 815 Mwe Gücünde Termik Santral Kurulacak, Hürriyet, 6 Mar. 2015.
  9. Köye 6. Kömür Santrali!, Bugday, 13 Mar. 2015.
  10. "21763-Bölgede santral sayısı 35'i bulacak Doğu Akdeniz," skenderunses, Jan 6, 2015
  11. Entek Elektrik, Koç website, accessed Mar. 2018.
  12. Evidence of climate change case, Hürriyet, Oct. 30, 2018
  13. İNŞAATI DEVAM EDEN TERMİK SANTRAL ENERJİ ÜRETİM TESİSİ SAYISI 42 ADETE İNDİ, Anbarapor, May 9, 2019
  14. Ayas Energy Production and Trade Inc., Ayas, accessed May 2020
  15. https://ekolojibirligi.org/13-termik-santral-ve-hes-projesinin-enerji-uretim-lisansi-sonlandirildi/ 13 Termik Santral Ve HES Projesinin Enerji Üretim Lisansı Iptal Edilip Sonlandırıldı], Ekoloji Birligi, Mar. 16, 2021
  16. "Preview of AYAS Coal-Fired Power Plant (625MW) | Transaction | IJGlobal". ijglobal.com. Retrieved 2020-12-04.
  17. ADANA AYAS ENERJI ELEKTRIK ÜRETIM A.S.: ÇEVRESEL ETKI DEĞERLENDIRMESI BASVURU DOSYASI (Environmental Impact Assessment Application File), Çınar Mühendislik Müsavirlik A.S., 3 Feb. 2015.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.