NC 41-Mellitah Gas Pipeline
From Global Energy Monitor
Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Related categories: |
NC 41-Mellitah Gas Pipeline is an under construction gas pipeline to run from Bay of Tripoli to Mellitah in Nuqat Al-Kham in Libya. [1][2]
Location
The pipeline was proposed to run from Bay of Tripoli to Mellitah in Nuqat Al-Kham in Libya. [1][2]
Project details
- Operator:
- Owner: Libya’s National Oil Corporation (NOC), Eni[1]
- Parent company: Libya’s National Oil Corporation (NOC), Eni[1]
- Capacity:
- Length: 130 km[1]
- Diameter: 30 in[1]
- Status: Construction[1]
- Start year: 2025[1]
- Cost:
- Financing:
- Associated infrastructure:
Background
Articles and resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "Libya Rolls Out Downstream, Gas Capture Plans - Libya Energy & Economic Summit". libyasummit.com. 2023-12-14. Retrieved 2024-08-08.
- ↑ 2.0 2.1 kgi-admin (2023-04-18). "Oil pipeline profile: NC 41–Mellitah Gas gas pipeline, Libya". Offshore Technology. Retrieved 2024-08-08.