Nasice Cement Plant

From Global Energy Monitor
This article is part of the
Global Cement and Concrete Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Nasice Cement Plant is an integrated cement plant operating in Nasice, Slavonia, Croatia.

Location

The map below shows the exact location of the cement plant in Nasice, Slavonia, Croatia[1]:

Loading map...


Coordinates (WGS 84): 45.451590, 18.036414 (exact)[2]

Background

In 2023, Nexe Group completed upgrades to the Nasice cement plant including a solar power plant, a new kiln line, improved alternate fuel substitution, and a carbon capture system. The carbon capture system will be commissioned in 2029 and will transport 700,000 tonnes per year of CO2 by pipeline for storage near Bockovac in Osijek-Baranja County.

Cement Plant Details

Table 1: General Plant Details

Plant type Plant status Start date
integrated[3] Operating[3] unknown

Table 2: Ownership Details

Additional information including parent company references and full ownership trees available at the Global Energy Ownership Tracker.
Parent company Parent company GEM ID Owner name Owner company GEM ID
natural person(s) [85.3%]; small shareholder(s) [14.7%] E100000123261 [85.3%]; E100001015587 [14.7%] Nexe dd [100.0%][4] E100002007461 [100.0%]

Table 3: Capacities

Cement capacity (million metric tonnes per annum) Clinker capacity (million metric tonnes per annum) Unspecified capacity (million metric tonnes per annum)
1[3] >0

Table 4: Cement Production

Primary cement color Primary cement type Production type Green cement technology
grey[5] unknown dry[6] Carbon capture, utilization, and/or storage [7]; Alternative fuels [8]

Articles and Resources

Additional data

To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.

References

  1. https://www.google.com/maps/place/NEXE+Grupa/@49.88342;11.8286552;1421551m/data=!3m1!1e3!4m6!3m5!1s0x475d0dd1ea7ede77:0xd27de70b12bbc5a2!8m2!3d45.452834!4d18.0397325!16s%2Fg%2F123656gq?entry=ttu&g_ep=EgoyMDI0MDgyMS4wIKXMDSoASAFQAw%3D%3D. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/@45.4516597;18.0348127;635m/data=!3m1!1e3?entry=ttu&g_ep=EgoyMDI0MDgyMS4wIKXMDSoASAFQAw%3D%3D. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://www.nexe.hr/en/tvrtke/nexe-d-d/. {{cite web}}: Missing or empty |title= (help)
  4. https://www.nexe.hr/promjena-tvrtke-nasicecement-d-d-u-nexe-d-d/. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20250502193140/https://www.nexe.hr/en/products/cement/. Archived from the original on 02 May 2025. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  6. "Spatial Finance Initiative". 2021.
  7. https://www.globalcement.com/news/item/15474-nexe-appoints-thyssenkrupp-industrial-solutions-for-new-kiln-line-and-carbon-capture-installation. {{cite web}}: Missing or empty |title= (help)
  8. https://www.globalcement.com/news/item/16469-nexe-group-commissions-upgraded-nasice-cement-plant. {{cite web}}: Missing or empty |title= (help)