Paguthan power station is a cancelled power station in Pathugan village, Bharuch, Gujarat, India.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Paguthan power station Pathugan village, Bharuch, Gujarat, India 21.78, 72.979 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 21.78, 72.979

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Emergency/Backup
Unit 1 Cancelled coal: unknown[1] 1000 unknown False
Unit 2 Cancelled coal: unknown[1] 1000 unknown False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Apraava Energy Pvt Ltd [100%] CDPQ Infrastructures Asia II Pte Ltd [50.0%]; CLP GPEC (Mauritius) Holdings Ltd [50.0%]
Unit 2 Apraava Energy Pvt Ltd [100%] CDPQ Infrastructures Asia II Pte Ltd [50.0%]; CLP GPEC (Mauritius) Holdings Ltd [50.0%]

Project-level coal details

  • Coal source(s): imported

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background on gas plant

Paguthan Combined Cycle Power Plant is located in Bharuch district, Gujarat. The gas plant is owned by CLP India Private Limited, a subsidiary of China Light & Power (CLP Group).[2] The plant was originally owned by Gujarat Paguthan Energy Corporation, which was acquired by CLP India in 2002.[3]

The gas has an installed capacity of 655 MW. All units became operational in 1998. It comprises the following units:[4]

  • Three units of gas turbine, each of 138 MW capacity.
  • One unit of steam turbine of 241 MW capacity.

Proposed coal plant

In January 2015 CLP Group said it planned to add about 2000 MW of coal-based power generation capacity to its existing gas-based plant, which was nearing the end of its power purchase agreement. The estimated cost is US$2 billion. It would be fueled by imported coal.[5]

The company applied for a terms of reference (ToR) for the 2,000 MW plant in June 2015.[6] ToR was granted on Feb 17, 2016.[7]

As of June 2020 the project has not received environmental clearance, and plans appear cancelled.

Articles and Resources

References

  1. ↑ 1.0 1.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://www.clpindia.in/operations_gpec.html
  3. ↑ https://www.clpindia.in/history.html
  4. ↑ https://www.clpgroup.com/ouroperations/assetsandservices/powergeneraton/naturalgaspowerplants/Pages/gpecpowerstation.aspx
  5. ↑ "China Light & Power plans 2000 MW coal-fired power plant in Gujarat," The Hindu, Jan 11, 2015
  6. ↑ "(IV) Proposed Terms of Reference for EIA Study," Application for Form 1, June 25, 2015
  7. ↑ Terms of Reference, India MoEF, Feb 2016

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.