Patnow power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Patnow power station is an operating power station of at least 474-megawatts (MW) in Pątnów, Konin, Wielkopolskie, Poland with multiple units, some of which are not currently operating. It is also known as Patnow 9 (Unit II-1).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Patnow power station Pątnów, Konin, Konin, Wielkopolskie, Poland 52.302, 18.237 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit I-3, Unit I-4, Unit I-5, Unit I-6, Unit I-7, Unit I-8: 52.302, 18.237
  • Unit II-1: 51.6250553, 19.3902996

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year Emergency/Backup
Unit I-3 Retired coal: lignite[1] 200 subcritical 1967 2020 False
Unit I-4 Retired coal: lignite[1] 200 subcritical 1967 2020 False
Unit I-5 Retired[2] coal: lignite[1] 200 subcritical 1967 2024[2] False
Unit I-6 Retired coal: lignite[1] 200 subcritical 1967 2019 False
Unit I-7 Retired[2] coal: lignite[1] 222[2] subcritical 1967 2024[2] False
Unit I-8 Retired[2] coal: lignite[1] 222[2] subcritical 1967 2024[2] False
Unit II-1 Operating coal: lignite[1] 474 supercritical 2008 2028 (planned)[3][4][5] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit I-3 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]
Unit I-4 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]
Unit I-5 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]
Unit I-6 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]
Unit I-7 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]
Unit I-8 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]
Unit II-1 Zespół Elektrowni Pątnów Adamów Konin SA [100%] Zespół Elektrowni Pątnów Adamów Konin SA [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Financing

Background

The Patnow Power Station was built in two phases. Patnow I consists of six 200 MW units, units 3-8, which were built in 1967. Units 1-2 were demolished in 2001. In 2008 a new 474 MW supercritical unit known as Patnow II was added. The power station burns lignite coal delivered from nearby mines.[6][7]

In 2015, two units were modernized, increasing their capacity from 200 MW to 222 MW.[8]

One of the 200 MW units is being converted to biomass.[9]

On June 20, 2020, two 200 MW units (Units 3 and 6) at Patnow were closed down.[10] This is believed to be due to tightening European Union emissions regulations.

In October 2020, plant owner Zespół Elektrowni Pątnów Adamów Konin SA (ZE PAK) said it will shut all of its Polish lignite plants by 2030. The remaining units of Patnow 1 coal plant will close by 2024, and Patnow 2 coal plant will close by 2030.[11]

In December 2023, ZE PAK stated that Unit II-1 would be modernized and operated through as late as 2028.[12]

As of December 2024, all units except for Unit II-1 were retired.[8] Unit II-1 would reportedly operate until 2026[13], and was expected to be decommissioned in Q2.[14]

As of May 2026, ZE PAK stated that Unit II-1 was planned to switch from continuous operation to backup operation at the mid-year. They stated that they assumed the plant would operate as backup capacity in 2027 and 2028.[15]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "ZE PAK powoli kończy z węglem. Kolejne bloki odchodzą do przeszłości". Parkiet. Archived from the original on 2025-04-30. Retrieved 2025-01-23.
  3. ↑ (PDF) https://biznes.pap.pl/download/attachment/51559716/DOC.20250514.51559716.20250514_0929_ZEP_EN_RA.pdf. {{cite web}}: Missing or empty |title= (help)
  4. ↑ "Polska elektrownia wyłączyła dwa bloki węglowe". wnp.pl. Archived from the original on 2026-02-04. Retrieved 2025-01-24.
  5. ↑ https://energia.rp.pl/energetyka-zawodowa/art44316231-ze-pak-zwolni-w-2026-r-okolo-700-osob-trwa-transformacja. {{cite web}}: Missing or empty |title= (help)
  6. ↑ "Pow! Patnow goes supercritical," PEI, Jan 9, 2008.
  7. ↑ "Patnow 460 MW Lignite Fired Coal Power Plant," SNC Lavalin, accessed May 2014
  8. ↑ 8.0 8.1 ZE PAK powoli kończy z węglem. Kolejne bloki odchodzą do przeszłości, Parkiet, December 31, 2024
  9. ↑ "Valmet to convert a lignite-fired boiler plant into biomass combustion at Zespół Elektrowni Pątnów-Adamów-Konin SA in Poland". POWER Magazine. 2020-04-29. Retrieved 2020-05-28.
  10. ↑ 'ZE PAK SA blocks out of service' ZE PAK press release, Jul. 1, 2020]
  11. ↑ "Polish utility ZE PAK to close all its lignite plants in line with UN Climate Agreement". Europe Beyond Coal. 2020-10-01. Retrieved 2020-10-01.
  12. ↑ ZE PAK będzie dłużej wydobywał i spalał węgiel, Energianews, December 20, 2023
  13. ↑ Polska elektrownia wyłączyła dwa bloki węglowe, wnp, December 31, 2024
  14. ↑ "ZE PAK: Sale of CCGT Adamów could unlock hidden value" (pdf). biznes.pap.pl. 14 May 2025. Retrieved 22 January 2026.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "ZE PAK. Plany na 2026 rok. Mocne cięcie zatrudnienia - rp.pl". energia.rp.pl. Retrieved 2026-07-17.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.