Australasia Probolinggo FSRU
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Australasia Probolinggo FSRU, also known as East Java FSRU Terminal, is a cancelled (inferred 4 y) LNG import terminal in Indonesia.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Australasia Probolinggo FSRU | East Java, Indonesia[1] | -7.196308, 112.73391 (approximate) |
The map below shows the approximate location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Australasia Probolinggo FSRU | import[1] | cancelled (inferred 4 y) | 3 mtpa[1] | 3.0 mtpa | True | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Australasia Probolinggo FSRU | import[1] | – | – |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Australasia Probolinggo FSRU | import[1] | cancelled (inferred 4 y) | – | – | – | – | 2021 (cancelled) |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Australasia Probolinggo FSRU | import[1] | cancelled (inferred 4 y) | PT Australasia LNG Indonesia [100%][1] | PT Australasia LNG Indonesia [100.0%] | – |
Background
The terminal would have had a capacity of 3 million tonnes per year (mtpa). The terminal could have been potentially expanded by adding more LNG regasification trains and LNG storage to meet future demands in the East Java region.[2]
In 2017 it was reported that the project included the conversion of an LNG carrier into a floating storage regasification unit (FSRU), which would be permanently moored off the shore of East Java.[3]
There have been no development updates in over four years, and the project is presumed to be cancelled as of 2021.
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 http://www.gasprocessingnews.com/news/kbr-awarded-pre-feed-study-for-indonesian-lng-regas-project.aspx.
{{cite web}}: Missing or empty|title=(help) - ↑ KBR awarded pre-FEED study for Indonesian LNG regas project, Gas Processing News, accessed April 16, 2021
- ↑ "Probolinggo liquefied natural gas terminal conversion project, Indonesia," Engineering News, January 27, 2017