Puqi Xianning power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Puqi Xianning power station (华润电力湖北公司蒲圻发电厂) is an operating power station of at least 2660-megawatts (MW) in Chibi City, Chibi, Xianning, Hubei, China with multiple units, some of which are not currently operating. It is also known as Puqi (Wuhan) power station.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Puqi Xianning power station Chibi City, Chibi, Xianning, Hubei, China 29.66523, 113.87296 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 29.66523, 113.87296

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase I Unit 1 operating coal - bituminous 330 subcritical 2004
Phase I Unit 2 operating coal - bituminous 330 subcritical 2004
Phase II Unit 3 operating coal - bituminous 1000 ultra-supercritical 2012
Phase II Unit 4 operating coal - bituminous 1000 ultra-supercritical 2013
Phase III Unit 5 construction coal - bituminous 1000 ultra-supercritical
Phase III Unit 6 construction[1][2] coal - bituminous 1000 ultra-supercritical

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase I Unit 1 China Resources Power Hubei Co Ltd [100.0%]
Phase I Unit 2 China Resources Power Hubei Co Ltd [100.0%]
Phase II Unit 3 China Resources Power Hubei Co Ltd [100.0%]
Phase II Unit 4 China Resources Power Hubei Co Ltd [100.0%]
Phase III Unit 5 China Resources Power Hubei Co Ltd [100.0%]
Phase III Unit 6 China Resources Power Hubei Co Ltd [100.0%]

Project-level coal details

  • Permit(s): April 2010, March 2, 2023[3], May 13, 2022

Background

Puqi Xianning power station is a four-unit coal-fired power plant with a total capacity of 2,660 MW in Hubei Province. The first two units, totaling 660 MW, were completed in 2004. Units 3 & 4, totaling 2,000 MW, were completed in 2012-13. The plant is owned by China Resources.[4]

One 1,000 MW was listed in the province's 14th Five-Year-Plan in early 2022.[5] However, based on February 2022 reporting, two 1,000 MW units were actually under consideration (Phase III).[6]

In February 2022, it was reported that the third phase (2 x 1,000 MW units) of the power project had broken ground and construction had begun.[7] The first unit (of Phase III) received a permit in June 2022.[8][9]

In June 2023, bidding was underway for EPC and equipments for the two new ultra-supercritical units.[10][11][12]

In the same month, it was reported that a concrete pouring ceremony had taken place for Phase III[13] and other announcements of construction commencement were reported.[14][15][16][17]

In July 2023, further reports of the project's biddings announced that Hunan Industrial Equipment Installation Company was the winning bidder for the main installation.[18][19]

Articles and Resources

References

  1. https://web.archive.org/web/20240125130229/https://news.58heating.com/show-6498.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125130300/https://mp.weixin.qq.com/s/b8-zLF5_lmMsOhn3Ni3oCA. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. "省发改委关于华润电力蒲圻三期6号机1×1000MW超超临界燃煤发电机组项目节能审查的意见". 湖北省发展和改革委员会. 2023-03-02. Retrieved 2023-11-2. {{cite web}}: Check date values in: |access-date= (help)
  4. 湖北咸宁:华润(蒲圻)电厂二期4号机组正式移交生产, HBTV, Aug. 14, 2013.
  5. 2个大型项目!湖北大型清洁高效煤电项目建设纳规情况公示, BJX, 2022-01-28
  6. "2×100万千瓦!华润电力蒲圻电厂三期工程破土动工," BJX, 2022-02-09
  7. 总投资约102亿!华润电力蒲圻电厂三期百万工程破土动工 Power IN, 2022-02-10
  8. 1×1000MW!国能长源汉川四期扩建工程7号机组项目第一次环评信息公示, BJX, 2022-04-14
  9. 1000MW!国能长源汉川四期扩建工程7号机组获得核准, BJX, 2022-06-17
  10. 华润电力蒲圻三期2×1000MW机组项目相关的10项中标候选人公示 BJX, 2023-06-01
  11. 华润电力蒲圻三期2×1000MW机组项目相关的7项中标结果 BJX, 2023-06-02
  12. 华润电力蒲圻三期2×1000MW超超临界燃煤发电机组消防车设备中标候选人公示 BJX, 2023-06-15
  13. 【项目】火电|2×1000MW!国电投滨海扩建水资源专题论证过审!/2×1000MW!华润电力蒲圻三期举行主厂房浇筑仪式, MP Weixin, 2023-06-06
  14. 蒲圻三期2×1000兆瓦超超临界燃煤发电机组开工电力项目圈, MP Weixin, 2023-06-23
  15. 湖北咸宁蒲圻百万三期开工,中能建建筑集团承建 Sohu, 2023-06-22
  16. 2×1000MW!华润电力蒲圻百万三期项目正式开工 BJX, 2023-06-25
  17. 湖北蒲圻2×1000兆瓦燃煤发电项目开工建设 MCoal IN, 2023-05-18
  18. 华润电力蒲圻三期2×1000MW工程主体安装C标段工程中标公示 BJX, 2023-07-06
  19. "【招标】火电|2×1000MW!华润蒲圻三期超超临界六大管道系统设备招标". 能源电力新观察. 2023-07-20. Retrieved 2023-8-18. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.