Rizhao LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Rizhao LNG Terminal, also known as 日照LNG接收站, is an LNG import terminal in China with units that are cancelled (inferred 4 y).

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Hanas Terminal Beikuo, Rizhao, Shandong, China[1] 35.114354958833495, 119.4234490425196 (exact)
Jingneng Terminal Beikuo, Rizhao, Shandong, China[1] 35.114354958833495, 119.4234490425196 (exact)
Pacific Oil &Gas Terminal Beikuo, Rizhao, Shandong, China[1] 35.114354958833495, 119.4234490425196 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Hanas Terminal import[2][3] cancelled (inferred 4 y) 6 mtpa[2] 13.0 mtpa False –
Jingneng Terminal import[4] cancelled (inferred 4 y) 5 mtpa[4] 13.0 mtpa False –
Pacific Oil &Gas Terminal import[1] cancelled (inferred 4 y) 2 mtpa[1] 13.0 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Hanas Terminal import[2][3] – US$2,672,000,000
Jingneng Terminal import[4] US$1,072,000,000 (6,700,000,000 RMB)[4] US$2,672,000,000
Pacific Oil &Gas Terminal import[1] US$1,600,000,000 (10,000,000,000 RMB)[5] US$2,672,000,000

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Hanas Terminal import[2][3] cancelled (inferred 4 y) 2014[2] – – – 2018 (cancelled)
Jingneng Terminal import[4] cancelled (inferred 4 y) 2019[4] – – – 2024 (cancelled)[6]
Pacific Oil &Gas Terminal import[1] cancelled (inferred 4 y) 2016[5] – – –[1][1] 2021 (cancelled)

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Hanas Terminal import[2][3] cancelled (inferred 4 y) Ningxia Hanas LNG Co Ltd [100%][7][8] Ningxia Hanas Natural Gas Group Co Ltd [100.0%] –
Jingneng Terminal import[4] cancelled (inferred 4 y) Lanqiao Group; Beijing Energy Group Beijing Energy Group; Lanqiao Group –
Pacific Oil &Gas Terminal import[1] cancelled (inferred 4 y) Pacific Energy [100%][9] Royal Golden Eagle [100.0%] –

Background

Rizhao LNG Terminal (新加坡金鹰集团太平洋油气公司日照岚山 LNG 接收站) is a proposed LNG import terminal in Shandong, China. An agreement to develop Rizhao LNG Terminal between Pacific Oil & Gas Limited, a subsidiary of Singapore's Royal Golden Eagle Group, and Rizhao city government was signed in May 2016.[10]It is planned for 2019 operation. If constructed, it would be the second LNG import terminal involving Pacific Oil & Gas in China, after Rudong LNG Terminal.[11]

On 7 February 2023, the Rizhao Municipal Development and Reform Commission adopted the Rizhao 2023 National Economic and Social Development Plan, which proposed advancing the approval of this project. [12]

On 26 April 2024, the Rizhao Municipal Development and Reform Commission, in implementing the 2024 key projects, again proposed to advance the project.[13]

On 25 August 2025, the Shandong Provincial Energy Bureau inspected the planned port site of the project.[14]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 https://m.sohu.com/n/492140898/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.china5e.com/news/news-882558-1.html. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 http://www.hanas.com/news/%E5%93%88%E7%BA%B3%E6%96%AF%E7%89%A9%E6%B5%81%E5%85%AC%E5%8F%B8%E6%96%B0%E6%B7%BB%E8%BF%90%E5%8A%9B%EF%BC%8C%E5%8A%A9%E6%8E%A8%E9%9B%86%E5%9B%A2%E6%B8%85%E6%B4%81%E8%83%BD%E6%BA%90%E5%8F%91%E5%B1%95/. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 https://www.sohu.com/a/325355367_100273878. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://mt.sohu.com/20160530/n452062208.shtml. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://finance.sina.cn/2020-10-27/detail-iiznezxr8399792.d.html. {{cite web}}: Missing or empty |title= (help)
  7. ↑ http://cn.nx.hanasnaturalgas.com/news/%e8%87%aa%e6%b2%bb%e5%8c%ba%e4%b8%bb%e5%b8%ad%e5%88%98%e6%85%a7%e4%b8%80%e8%a1%8c%e8%b0%83%e7%a0%94%e5%93%88%e7%ba%b3%e6%96%aflng%e5%b7%a5%e5%8e%82/. {{cite web}}: Missing or empty |title= (help)
  8. ↑ http://www.hanaspipeline.com/. {{cite web}}: Missing or empty |title= (help)
  9. ↑ https://www.rgei.com/zh/our-business-zh/pacific-energy. {{cite web}}: Missing or empty |title= (help)
  10. ↑ "200亿的清洁项目落户山东!天又可以蓝一点了--搜狐". mt.sohu.com. 2016-05-30.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ 山东加速布局天然气供应 日照岚山LNG接收站进入项目审批阶段 Gas.in-en.com, 8 May 2017
  12. ↑ "日照市人民政府办公室关于转发市发展改革委日照市2023年国民经济和社会发展计划的通知". 2023-02-07. Retrieved 2026-03-29.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "市发展改革委落实2024年度市委市政府重点工作台账(第一季度)". 2024-04-26. Retrieved 2026-03-29.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "省能源局调研组到我市开展油气领域专题调研". 2025-08-27. Retrieved 2025-03-29.{{cite web}}: CS1 maint: url-status (link)