| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Dananhu power station (国投哈密大南湖电厂, 中煤哈密电厂) is an operating power station of at least 1320-megawatts (MW) in Nanhu Town, Hami, Xinjiang, China with multiple units, some of which are not currently operating.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Dananhu power station | Nanhu Town, Hami, Hami, Xinjiang, China | 42.305944, 93.351929 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 42.305944, 93.351929
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown | 660 | supercritical | yes | 2014 |
| Phase I Unit 2 | Operating | coal: unknown | 660 | supercritical | yes | 2014 |
| Phase II Unit 3 | Announced[1] | coal: unknown[1] | 660[1] | unknown | yes[1] | – |
| Phase II Unit 4 | Announced[1] | coal: unknown[1] | 660[1] | unknown | yes[1] | – |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | China Coal Hami Power Generation Co Ltd [100%] | China National Coal Group [100.0%] |
| Phase I Unit 2 | China Coal Hami Power Generation Co Ltd [100%] | China National Coal Group [100.0%] |
| Phase II Unit 3 | China Coal Hami Power Generation Co Ltd [100%] | China National Coal Group [100.0%] |
| Phase II Unit 4 | China Coal Hami Power Generation Co Ltd [100%] | China National Coal Group [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Project
SDIC Dananhu power station is a 2 x 660MW coal plant in Xinjiang Uyghur Autonomous Region, commissioned in 2014.[2][3][4] It went into operation in 2014.[5]
Ownership
In May 2019, plant sponsor SDIC said it no longer planned to invest in new thermal power.[6] In December 2019, ChinaCoal bought SDIC's share in the coal plant.[7]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://news.bjx.com.cn/html/20260113/1479221.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "国投哈密大南湖电厂一期工程项目获核准", 国家开发投资公司, 2013-10-11
- ↑ "国投哈密发电有限公司公司简介", 国家开发投资公司
- ↑ "走进国电哈密大南湖," Sina Finance, September 10, 2013
- ↑ "北塘热电厂二号机组正式运行," BHNTV, 2014-12-6
- ↑ "China state fund joins global shift away from coal," Business Times, March 22, 2019
- ↑ "中煤集团接手国投电力转让的5家火电厂股权," 北极星电力网新闻中心, 2019/12/30
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
