Sagardighi Thermal Power Station is an operating power station of at least 2260-megawatts (MW) in Manigram, Sagardighi, Murshidabad, West Bengal, India with multiple units, some of which are not currently operating. It is also known as Sagardighi St. III U-1 (Stage III Unit 5).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Sagardighi Thermal Power Station Manigram, Sagardighi, Murshidabad, West Bengal, India 24.3688141, 88.1040001 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Stage II Unit 3, Stage II Unit 4, Stage III Unit 5, Stage III Unit 6, Unit 1, Unit 2: 24.3688141, 88.1040001

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Stage II Unit 3 Operating coal: unknown[1] 500 subcritical 2015 False
Stage II Unit 4 Operating coal: unknown[1] 500 subcritical 2016 False
Stage III Unit 5 Operating[2] coal: unknown[1] 660[3] supercritical 2026[2] False
Stage III Unit 6 Cancelled coal: unknown[1] 660 supercritical – False
Unit 1 Operating coal: unknown[1] 300 subcritical 2007 False
Unit 2 Operating coal: unknown[1] 300 subcritical 2008 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Stage II Unit 3 The West Bengal Power Development Corporation Ltd [100%] The West Bengal Power Development Corporation Ltd [100.0%]
Stage II Unit 4 The West Bengal Power Development Corporation Ltd [100%] The West Bengal Power Development Corporation Ltd [100.0%]
Stage III Unit 5 The West Bengal Power Development Corporation Ltd [100%] The West Bengal Power Development Corporation Ltd [100.0%]
Stage III Unit 6 The West Bengal Power Development Corporation Ltd [100%] The West Bengal Power Development Corporation Ltd [100.0%]
Unit 1 The West Bengal Power Development Corporation Ltd [100%] The West Bengal Power Development Corporation Ltd [100.0%]
Unit 2 The West Bengal Power Development Corporation Ltd [100%] The West Bengal Power Development Corporation Ltd [100.0%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The power station began as two units of 300 MW each, commissioned in 2007 and 2008.[4][5]

Expansion

Units 3-4

West Bengal Power Development Corporation reports the following status items for the proposed units 3 and 4:[6]

  • Go ahead clearance received from Govt. of West Bengal for implementation of 2x500 MW Thermal Power Unit at Sagardighi.
  • Chimney Clearance has already been received from Ministry of Civil and Aviation.
  • Water Clearance has been received from Port Trust. But clearance from Irrigation & Water Department is still pending.
  • Railway Transportation Clearance has already been received.
  • Financial Tie up has already been made with PFC for funding up to 70% of the Project Cost.
  • Coal Linkage is made with Captive Coal Mines Pachawar North and East of Damagaria Coal Mines.
  • In principle clearance from the Hon’ble State Electricity Regulatory Commission is still pending as well as Environmental Clearance is also pending.

In 2012, Units 3 and 4 had a planned commissioning date of 2014.[7]

As of February 2015, units 3 and 4 are planned for completion by FY2017.[8]

Unit 3 was commissioned December 2015 and began commercial operation in July 2016.[9] Unit 4 was commissioned in December 2016.[10]

Units 5-6

The company is also planning a unit 5 and 6 of 500 MW each.[11]

Unit 5 received a terms of reference in January 2015.[12]

In April 2016, the company applied for unit 5 to be 660 MW, to meet the Ministry of Power requirement that the 13th Plan Capacity Additions only be through supercritical units.[13]

Unit 5 as 660 MW received a terms of reference on March 26, 2019,[14] and environmental clearance on March 24, 2020.[15]

Construction on unit 5 began in 2021. Commissioning was planned for 2024.[16][17][18]

Unit 6 had received no permits and appeared to be abandoned.

The May 2023 Broad Status report stated that Unit 5 (or Unit 1 of Stage III) was expected to be commissioned in October 2024.[19] The November 2023 Broad Status report indicated planned commissioning in January 2025.[20]

Reporting in October 2024 indicated that Unit 5 was scheduled to be commissioned by March 2025.[21] In May 2025, the Broad Status report estimated that Unit 5 would be commissioned in July 2025.[22] By September 2025, the expected commercial operation date for Stage III, Unit 5 had been delayed again to December 2025.[23]

In March 2026, Unit 5 began commercial operation.[24]

Financing for Unit 5

In March 2017, a financing agreement for Unit 5 was closed. The Power Finance Corporation agreed to provide a US$405 million loan. West Bengal Power Development Corporation is expected to provide US$179.57 million in equity.[25] [26]

Coal supply

In December 2021, Mongabay published a story titled "In anticipation of India’s largest coal mining project." The story noted the Sagardighi plant:[27]

"Sprawling across 3,400 acres (approximately 13.7 square kilometres), the mining area is made of two coal blocks – the Deocha-Pachami coal block spread over 9.7 square kilometres and the Dewanganj-Harinsinga coal block spread over 2.6 sq. km. The project, which would be implemented in a public-private partnership model, has the potential to draw investment to the tune of USD 3 billion (approximately Rs. 22,500 crore or Rs. 225 billion), according to a state government publication. There will be five end-users of the coal extracts – the thermal plants are Sagardighi Phase II, Sagardighi Phase III, Santaldih, Bakreswar and the pit head of Deocha-Pachami coal block."

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 (PDF) https://cea.nic.in/wp-content/uploads/installed/2026/03/Website-1.pdf. {{cite web}}: Missing or empty |title= (help)
  3. ↑ "Broad Status Report of Under Construction Thermal Power Projects (April 2025)" (PDF). Central Electricity Authority, India Ministry of Power. 2025-04. Archived from the original (PDF) on 2026-03-02. {{cite web}}: Check date values in: |date= (help)
  4. ↑ Environmental Clearance, India MoEF, May 18, 2011.
  5. ↑ West Bengal Power Development Corporation, "About Us: Plant", West Bengal Power Development Corporation website, accessed February 2012.
  6. ↑ "Ongoing Projects: Sagardighi Thermal Power Project Extension," West Bengal Power Development Corp, accessed March 2012
  7. ↑ Monthly Report on Broad Status of Thermal Power Projects in the Country, Central Electricity Authority, September 2012
  8. ↑ Broad Status Report, India Central Electrical Authority, February 2015
  9. ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, July 2016
  10. ↑ "Monthly Report on Broad Status of Thermal Power Projects in the Country," Government of India Ministry of Power, November 2016
  11. ↑ "Future Projects," West Ben­gal Power Devel­op­ment Corpo­ra­tion Limited website, accessed August 2014
  12. ↑ Terms of reference, India MoEF, Jan 15, 2015
  13. ↑ "Proposed 1 X500 MW Coal based Sagardighi Phase-Ill Extension," West Bengal Power Development Corporation, April 6, 2016
  14. ↑ Terms of reference, India MoEF, March 26, 2019
  15. ↑ Form 2, India MoEF, accessed July 2, 2020
  16. ↑ “Broad Status Report,” Thermal Project Monitoring Division, Central Electricity Authority, November 2021
  17. ↑ “Broad Status Report of Under Construction Thermal Power Projects,” Central Electricity Authority, May 2022
  18. ↑ “Broad Status Report of Under Construction Thermal Power Projects,” India Central Electricity Authority, November 2022
  19. ↑ Broad Status Report of Under Construction Thermal Power Projects, Central Electricity Authority, Government of India, May 2023
  20. ↑ "Broad Status Report of Under Construction Thermal Power Projects" (PDF). Central Electricity Authority. November 2023.{{cite web}}: CS1 maint: url-status (link)
  21. ↑ Bengal Cabinet okays 1,600 MW super critical power plant, Times of India, October 1, 2024
  22. ↑ “Broad Status Report of Under Construction Thermal Power Projects (May 2025),” Central Electricity Authority, India Ministry of Power, May 2025
  23. ↑ “Broad Status Report of Under Construction Thermal Power Projects (September 2025),” Central Electricity Authority, September 2025
  24. ↑ “All India Installed Capacity (in MW) of Power Stations (As on 31.03.2026),” India Central Electricity Authority, March 31, 2026
  25. ↑ "Power Finance Corp provides loan to West Bengal coal-fired | News | IJGlobal". ijglobal.com. Retrieved 2020-10-23.
  26. ↑ "Preview of Murshidabad Coal-Fired Power Plant (660MW) | Transaction | IJGlobal". ijglobal.com. Retrieved 2020-10-23.
  27. ↑ "In anticipation of India’s largest coal mining project," Mongabay, December 2, 2021

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.