Salina Cruz LNG Terminal

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Salina Cruz LNG Terminal is a proposed LNG export terminal in Mexico.

Location

The terminal would be located on Mexico's Pacific coast, near Salina Cruz in the state of Oaxaca.

Loading map...

Project Details

  • Owner: CFEnergía, Sempra Infrastructure[1][2]
  • Parent company: CFEnergía, Sempra Energy[1][2]
  • Location: Salina Cruz, Oaxaca, Mexico
  • Coordinates: 16.161733, -95.195759 (approximate)
  • Capacity: 3 mtpa[1][3][4]
  • Status: Proposed
  • Type: Export[5]
  • Start Year: 2024[6][7]

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

The idea of an LNG export terminal in Salina Cruz on Mexico's Pacific coast was initially proposed by Golar. It was intended to deploy a Golar-owned and operated Floating LNG storage and production unit to convert Mexican feed gas to LNG for export to Pacific markets. The proposed unit aimed to produce approximately 2.2 Mtpa and was expected to begin operations in 2Q 2018.[8] As of February 2020 there had been no development updates on the Golar-owned project, and it was no longer listed on the company website as of 2021.

In October 2020, the Mexican government revived plans for a LNG facility in the same area that would process gas brought in from Mexico's Gulf coast via an expansion of the existing Jaltipan-Salina Cruz gas pipeline.[9][10] The pipeline expansion and the new LNG terminal are both components of Mexico's ambitious Transoceanic Corridor project, aimed at linking Mexico's Gulf and Pacific coasts and bringing large-scale economic development to the country's southeastern states.[5] Gas for the project would come from domestic production by Mexico's state oil company Pemex or from Texas via the recently completed Sur de Texas-Tuxpan gas pipeline and the proposed Southeast Gateway Gas Pipeline.[11][12][13] Mexican president Andrés Manuel López Obrador has stated that he wishes to see the project completed by the end of his current term in December 2024.[5][7]

In August 2021, Mexico's CFEnergía launched an official tender soliciting bids for construction of the terminal, whose liquefaction capacity was listed at 430 million cubic feet per day or 3 million tonnes per annum (mtpa).[1][3] The proposed terminal, with an estimated cost of 60 billion pesos (approximately US $ 3 billion), would export natural gas to Asia.[5][14]

In July 2022, CFE and US-based Sempra announced that they were engaged in preliminary and non-binding discussions regarding joint development of the Salina Cruz terminal.[2][15] As of March 2023, Sempra Energy was reportedly still working with the Mexican government to advance the project[16], though there appeared to be minimal interest from other private investors.[17]

Opposition and other challenges

There is significant local opposition to the Salina Cruz LNG terminal project, and some analysts have deemed it unfeasible due to insufficient domestic production, incomplete pipeline infrastructure, and the high cost of importing gas from the United States.[9][18]

Numerous citizens' groups in Mexico, including Greenpeace, Nuestro Futuro, Alianza Mexicana Contra el Fracking, Conexiones Climáticas and Planeteando have called for the government to cancel all pending LNG export terminal projects in the country. The groups argue that LNG terminals create a host of serious negative impacts for local communities, including health effects from toxic chemicals such as benzine and nitrogen oxides, climate change associated with heightened levels of greenhouse gas emissions, devastation of marine life due to dredging, and the associated negative economic impacts on fisheries.[19]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 "CONVOCATORIA PARA CONOCER EL INTERÉS POR PARTE DEL SECTOR PRIVADO EN EL DESARROLLO DE INFRAESTRUCTURA DE LICUEFACCIÓN DE GAS NATURAL (GNL) EN EL PUERTO DE SALINA CRUZ, OAXACA" (PDF). CFEnergía. August 30, 2021.{{cite web}}: CS1 maint: url-status (link)
  2. 2.0 2.1 2.2 "CFE and Sempra Infrastructure Expand Agreements for the Development of Energy Infrastructure in Mexico". Sempra. July 21, 2022.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 "Mexico's CFE Seeking Firm to Build Natural Gas Pipeline, LNG Export Terminal". NGI (Natural Gas Intelligence). August 30, 2021.{{cite web}}: CS1 maint: url-status (link)
  4. "Mexico Likely To Further Expand LNG Export Capacity". Fitch Solutions. October 10, 2022.
  5. 5.0 5.1 5.2 5.3 "Alianza estratégica, modelo en el cual CFE promoverá la construcción del gasoducto interoceánico". PV Magazine. June 13, 2022.{{cite web}}: CS1 maint: url-status (link)
  6. "Corredor de Tehuantepec - Un nuevo corredor comercial en las Américas" (PDF). Gobierno de México. November 2021.{{cite web}}: CS1 maint: url-status (link)
  7. 7.0 7.1 "SENER prepara consulta indígena en Oaxaca por gasoducto". Oil & Gas Magazine. June 22, 2022.{{cite web}}: CS1 maint: url-status (link)
  8. "Golar LNG". www.golarlng.com. Retrieved 2021-05-12.
  9. 9.0 9.1 "La 4T revive el proyecto gasero que Peña Nieto dejó inconcluso en el Istmo; advierten resistencias". El Universal Oaxaca. October 14, 2020.{{cite web}}: CS1 maint: url-status (link)
  10. "Mapa interactivo: Corredor del Istmo de Tehuantepec". PODER (Proyecto sobre Organización, Desarrollo, Educación e Investigación). Retrieved 2021-01-28.{{cite web}}: CS1 maint: url-status (link)
  11. Prud'homme, Eduardo (August 12, 2022). "Gateway Pipeline Shows CFE Willing, Able to Work with Private Sector". NGI (Natural Gas Intelligence).{{cite web}}: CS1 maint: url-status (link)
  12. "CFE and TC Energy Join Forces to Build US$5 billion Pipeline". Mexico Business News. July 6, 2022.{{cite web}}: CS1 maint: url-status (link)
  13. "Gasoducto Texas-Tuxpan conectaría con Dos Bocas". Oil & Gas Magazine. June 21, 2022.{{cite web}}: CS1 maint: url-status (link)
  14. "New gas liquefaction, coking plants in Oaxaca imply 120 bln peso investment- Lopez Obrador". Reuters. June 11, 2022.
  15. "Mexico's CFE, Sempra LNG Signal Potential 'Path Forward' for Vista Pacífico Exports". Natural Gas Intel. July 25, 2022.{{cite web}}: CS1 maint: url-status (link)
  16. "Sempra moves forward on constructing a major liquefied natural gas project in Texas". San Diego Union-Tribune. March 21, 2023.
  17. "Suministro de gas natural al sur del país". México cómovamos. May 30, 2023.
  18. "Salina Cruz LNG Export Project Said Unfeasible Under Current Conditions - Natural Gas Intelligence". Natural Gas Intelligence. 2020-10-14. Retrieved 2021-05-12.
  19. "El alto de EEUU a proyectos de Gas Natural Licuado evidencia que el plan de México para exportarlo es peligroso y debe ser cancelado". Greenpeace México. 2024-01-26.{{cite web}}: CS1 maint: url-status (link)

Related GEM.wiki articles

External resources

External articles