Beihai power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Beihai power station (神华国华广投北海发电厂) is an operating power station of at least 4000-megawatts (MW) in Xinggang Town, Tieshangang, Beihai, Guangxi, China. It is also known as 国能广投北海电厂2×1000MW二期扩建工程 (Phase II Unit3&4).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Beihai power station | Xinggang Town, Tieshangang, Beihai, Guangxi, China | 21.535871, 109.590176 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 21.535871, 109.590176
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: unknown[2] | 1000 | ultra-supercritical | 2022 | False |
| Phase I Unit 2 | Operating | coal: unknown[2] | 1000 | ultra-supercritical | 2022 | False |
| Phase II Unit 3 | Operating[3][4] | coal: unknown[2][1] | 1000[1] | ultra-supercritical[1] | 2025[3] | False |
| Phase II Unit 4 | Operating[5][4] | coal: unknown[2][1] | 1000[1] | ultra-supercritical[1] | 2025[5] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Guoneng Guangtou Beihai Power Generation Co Ltd [100%][1] | China Shenhua Energy Co Ltd [52.0%]; Guangxi Investment Group Co Ltd [39.6%]; Industrial and Commercial Bank of China Ltd [3.5%]; Guangxi Guangtou New Energy Industry Development Fund Partnership LP [3.2%]; unknown [1.6%] |
| Phase I Unit 2 | Guoneng Guangtou Beihai Power Generation Co Ltd [100%][1] | China Shenhua Energy Co Ltd [52.0%]; Guangxi Investment Group Co Ltd [39.6%]; Industrial and Commercial Bank of China Ltd [3.5%]; Guangxi Guangtou New Energy Industry Development Fund Partnership LP [3.2%]; unknown [1.6%] |
| Phase II Unit 3 | Guoneng Guangtou Beihai Power Generation Co Ltd [100%][1] | China Shenhua Energy Co Ltd [52.0%]; Guangxi Investment Group Co Ltd [39.6%]; Industrial and Commercial Bank of China Ltd [3.5%]; Guangxi Guangtou New Energy Industry Development Fund Partnership LP [3.2%]; unknown [1.6%] |
| Phase II Unit 4 | Guoneng Guangtou Beihai Power Generation Co Ltd [100%][1] | China Shenhua Energy Co Ltd [52.0%]; Guangxi Investment Group Co Ltd [39.6%]; Industrial and Commercial Bank of China Ltd [3.5%]; Guangxi Guangtou New Energy Industry Development Fund Partnership LP [3.2%]; unknown [1.6%] |
Project-level coal details
- Coal source(s): domestic/imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background on Phase I
Shenhua Group (now National Energy Investment Group) proposed to build a two-unit coal-fired power plant with a total planned capacity of 2,000 MW in Guangxi Zhuang Autonomous Region. Construction on the plant began in 2015,[6] and it was scheduled to be completed in 2017.[7][8]
Nationwide Restrictions Imposed on Development of Coal-Fired Power Capacity
In January 2017, China's National Energy Administration suspended over 100 planned and under-construction coal power projects, including Beihai. It was unclear when or if the projects would be revived.[9]
For details, see China's 2016 Restrictions on Development of Coal-Fired Power Capacity.
2017: Plant postponed by government
In July 2017, the NEA released the "Guideline of Supply-Side Reform of the Coal Power Bubble". The Guideline included a draft list which slowed down or halted 185 coal-burning units across 21 provinces, totaling 107 GW. 114 coal units (65 GW) were ordered to slow down the construction progress during 2017 to 2020, and were not allowed to connect to the grid in 2017. In addition, 71 coal units (42 GW) were halted indefinitely for regulation violations. The list partly overlapped with the projects listed in the January NEA letter to 13 provinces.[10]
Beihai power station Units 1-2 were among the postponed coal-burning units,[10] and also appeared on an updated list of postponements released in September 2017.[11]
For more information, see China's 2016/2017 Restrictions on Development of Coal-Fired Power Capacity.
2018: Project revived
The project was listed as one of three planned coal-fired power stations in the 2018-2020 Guangxi Major Industrial Plan. It was planned for construction in 2020.[12]
Construction began in May 2020.[13]
Unit 1 began operating in October 2022.[14]
Unit 2 began operating in December 2022.[15][16]
Expansion (Phase II)
On November 24, 2022, an additional two 1,000 MW coal units were permitted.[17]
The construction ceremony was held in December 2022.[18] Biddings for the construction were reported.[19][20][21]
Phase II Unit 3 appeared on the Guangxi key projects list in 2023[22], the EIA report was submitted in March[23], biddings were issued in May–June[24], boiler piling began in July[25], an inauguration ceremony was held in August[26], and the first concrete was poured in October[27].
In 2024, boiler foundation concrete was poured in November 2023[28], seawater desulfurization EPC was tendered in December[29], the second layer of steel frame was erected in March[30], welding of the heating surface began in April[31], the absorber tower was capped in June[32], and the boiler beam was hoisted on June 30[33]. The chimney outer cylinder was capped in November[34].
In early 2025, the DCS system power was received in January[35], the main transformer was installed in February[36], the generator stator and plant power were completed in April[37][38], and the chimney steel liner was installed in June[39]. Unit 3 was connected to the grid in November and passed the 168-hour trial in December 2025[40][41].
For Phase II Unit 4, boiler beam hoisting began on June 30, 2024[42], and turbine foundation concrete was poured in September[43]. In 2025, the boiler hydraulic test was completed in April[44], and the chimney steel liner was installed in August[45]. In December 2026, the unit passed the 168-hour trial run and was put into commercial operation[46].
Ownership
On August 28 2017, China's State-owned Assets Supervision and Administration Commission of the State Council (SASAC) announced that China Guodian Corporation and Shenhua Group will be jointly restructured. Shenhua Group will become China National Energy Investment Group and will absorb China Guodian Corporation. It will be the largest power company in the world by installed capacity, as well as the world's largest coal producer.[47][48] The merger was completed on November 28, 2017.[49]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://news.bjx.com.cn/html/20221129/1272613.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://news.bjx.com.cn/html/20251201/1472341.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 "国能广投北海电厂2×1000MW二期扩建工程正式开工". Weixin Official Accounts Platform. 2023-10-30. Archived from the original on 2024-01-25. Retrieved 2023-10-31.
- ↑ 5.0 5.1 https://news.bjx.com.cn/html/20251229/1476935.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "国华北海电厂一期2台百万机组桩基工程开工," 北海市政府门户网站, 2015-06-04
- ↑ "神华国华广投北海电厂2×1000MW新建工程可行性研究报告审查会在南宁顺利召开",中华人民共和国商务部, 2012-10-26
- ↑ "神华国华电力北海电厂新建项目喜获核准," Polaris-fired power, 2014-12-16
- ↑ "能源局下发13省市新建火电机组停建清单(附文件)," Polaris, January 16, 2017
- ↑ 10.0 10.1 "16部委联合发文防范化解煤电产能过剩风险," Sohu.com, 2017-08-03
- ↑ "2017年分省煤电停建和缓建项目名单," Sohu, 2017-10-12
- ↑ "2020年将开工建设四台百万千瓦级燃煤机组!广西2018-2020年重大项目建设计划表发布," 北极星电力网, 2019/1/8
- ↑ "暂停三年半 国华广投北海电厂(2×1000MW)按下“重启键”," 东电一公司, 2020-05-22
- ↑ "2×1000MW!国家能源集团广西北海公司1号机组投入商业运营," BJX News, 2022-10-08
- ↑ "广西国企分类精准施策 高质量做好能源保供工作," BJX, 2023-01-13
- ↑ "百万机组+1!国能广投北海发电有限公司2号机组正式投运," BJX, 2022-12-27
- ↑ "2×1000MW!国家能源集团广西公司北海二期扩建项目获核准," BJX News, 2022-11-29
- ↑ "国能广投北海发电有限公司电厂二期项目2×1000MW开工," BJX, 2022-12-27
- ↑ "【招标】2×1000MW!国能北海二期工程海水脱硫EPC招标". 能源电力新观察. 2023-07-20. Retrieved 2023-8-18.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "中国能建中标北海电厂二期2×1000兆瓦机组扩建工程A标段". 北极星电力网. 2023-08-16. Retrieved 2023-8-18.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "国能北海电厂二期2×1000MW机组扩建工程相关的7项中标结果公示". 北极星电力网. 2023-08-15. Retrieved 2023-8-18.
{{cite web}}: Check date values in:|access-date=(help)CS1 maint: url-status (link) - ↑ "广西2023年重点项目清单". 北极星电力网. 2023-03-30. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能广投北海电厂二期EIA报告提交". 中国能建. 2023-03-01. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期项目招标". 微信公众平台. 2023-05-30. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号锅炉桩基工程正式开工". 北极星电力网. 2023-07-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国能广投北海电厂二期扩建项目启动仪式举行". 微信公众平台. 2023-09-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期扩建工程浇筑第一方混凝土". 微信公众平台. 2023-10-31. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号锅炉基础大体积混凝土浇筑完成". 北极星电力网. 2023-11-28. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期海水脱硫EPC总承包招标". 北极星电力网. 2024-01-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号锅炉第二层钢架顺利通过验收". 微信公众平台. 2024-03-22. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期三号锅炉受热面开始焊接". 微信公众平台. 2024-05-31. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3、4号吸收塔双塔同步封顶". 北极星电力网. 2024-06-27. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号锅炉首根大板梁吊装就位". 北极星电力网. 2024-07-04. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期烟囱外筒壁封顶". 北极星电力网. 2024-12-02. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3、4号机组DCS系统同步受电一次成功". 微信公众平台. 2025-02-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3、4号机主变压器顺利就位". 微信公众平台. 2025-03-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号机组发电机定子顺利吊装就位". 微信公众平台. 2025-05-01. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号机组厂用电受电一次成功". 微信公众平台. 2025-05-01. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期烟囱3号钢内筒顺利提升到顶". 微信公众平台. 2025-06-23. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号机组首次并网一次成功". 微信公众平台. 2025-11-17. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期3号机组通过168小时试运行". 微信公众平台. 2025-12-03. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期4号机组锅炉大板梁开始吊装". 北极星电力网. 2024-07-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期4号汽轮发电机组基座大体积混凝土浇筑圆满完成". 北极星电力网. 2024-09-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期4号锅炉水压试验一次成功". 微信公众平台. 2025-05-01. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海电厂二期4号烟囱钢内筒双筒顺利提升到顶". 微信公众平台. 2025-10-24. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "北海公司4号机组通过168小时试运行顺利投产". 微信公众平台. 2026-01-05. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Factbox: Shenhua and Guodian - China's latest state marriage". Reuters. 29 August 2017. Retrieved 30 August 2017.
- ↑ "China Is Creating the World's Largest Power Company". Bloomberg News. 28 August 2017. Retrieved 29 August 2017.
- ↑ "China’s Newly-Established National Energy Investment Group Sets World Records in Its Sector, With Assets of Over CNY1.8 Trillion," Yicai Global, 11-28-2017
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.