Shenzhen LNG Peak-shaving Gas Pipeline
From Global Energy Monitor
(Redirected from Shenzhen LNG Peaking Load Acception Station Transport Line)
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor. |
Sub-articles: |
Shenzhen LNG Peaking Load Acception Station Transport Line (深圳LNG调峰接收站配套管道) is an operating natural gas pipeline starting operating in 2020.[1]
Location
The pipeline's route is from Diefu LNG Terminal, Dapeng District in Shenzhen, to Qingxi Town in Dongguan, Guangdong Province, China. It connects three LNG terminals in Shenzhen with West-East Gas Pipeline 2[2]
Project Details
- Operator:
- Owner: West To East Gas Transmission Branch of National Petroleum Pipeline Network Group Co., Ltd.[3]
- Parent Company: China National Petroleum Corporation
- Current capacity: 10.70 bcm/year
- Proposed capacity:
- Length: 64.3 km[4]
- Diameter: 1016 mm[4]
- Status: Operating[4]
- Start Year: 2020[4]
- Cost:
Background
Articles and resources
References
- ↑ 深圳LNG外输管道安全顺利建成 中国石油新闻中心 June 8, 2020
- ↑ 深圳迭福、迭福北LNG接收站互联,跑步进入“全国一张网” China Gas, July 13, 2020
- ↑ 广东省生态环境厅关于中石油深圳液化天然气应急调峰站项目外输管道工程环境影响报告书的批复, 广东省生态环境厅, 2019-01-11
- ↑ 4.0 4.1 4.2 4.3 深圳LNG外输管道投产,实现了深圳等三大LNG与西二线的互联互通, 界面新闻, 2020-07-09