Shenzhen LNG Terminal (Shenzhen Gas)

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Shenzhen LNG Terminal (Shenzhen Gas), also known as 深圳市燃气储备与调峰库 and 深圳华安LNG项目, is an LNG import terminal in China with units that are operating and in construction.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Phase 1 Dapeng Bay, Shenzhen, Guangdong, China[1][2] 22.618619, 114.384841 (exact)
Phase 2 Dapeng Bay, Shenzhen, Guangdong, China[1][2] 22.618619, 114.384841 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Phase 1 import[2] operating[3][4] 0.8 mtpa[2] 2.8 mtpa False –
Phase 2 import[1] construction[5] 2 mtpa[1] 2.8 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Phase 1 import[2] US$256,000,000 (1,600,000,000 RMB)[4] US$848,000,000
Phase 2 import[1] US$592,000,000 (3,700,000,000 RMB)[6] US$848,000,000

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Phase 1 import[2] operating[3][4] – – 2014[7] 2019[3][4] –
Phase 2 import[1] construction[5] – – 2022[5] – –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Phase 1 import[2] operating[3][4] SHEN ZHEN SINO-BENNY LPG Co Ltd [100%][8] Shenzhen Gas Corp Ltd [100.0%] –
Phase 2 import[1] construction[5] SHEN ZHEN SINO-BENNY LPG Co Ltd [100%][8] Shenzhen Gas Corp Ltd [100.0%] –

Background

Shenzhen LNG Terminal (Shenzhen Gas) is an LNG terminal in Guangdong, China. It received first LNG ship by Eni on August 18, 2019, after five years of construction.[9][10]

Second phase of the LNG terminal was proposed in 2021[11] and began construction in December 2022.[12] The total investment was 3.7 billion yuan. Phase 2 would contain two storage tanks of 160,000 cubic meters each and other supporting facilities. The designed receiving capacity would be 2 mtpa.[13]

二期项目位于深圳市大鹏新区葵涌街道下洞油气仓储基地北侧,总投资37亿元,拟建设2座16万立方米LNG储罐及其站内工艺、公用及辅助设施,并配套扩建1座可接卸3~21.7万立方米LNG船泊位和4.7公里的超高压出站管线。项目设计周转能力为200万吨/年,高压最大输出能力79.5万立方米/小时。库区占地面积约10万平方米,海域港池面积约80公顷。[12]

On February 28, 2026, this project is included in the" Shenzhen 2026 Major Project Plan List."[14]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 https://www.sz.gov.cn/cn/xxgk/zfxxgj/bmdt/content/post_10358431.html. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://www.china5e.com/news/news-1068449-1.html. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://www.thepaper.cn/newsDetail_forward_8518906. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 https://news.southcn.com/node_54a44f01a2/acc3070a4a.shtml. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 http://gzw.sz.gov.cn/gkmlpt/content/10/10358/post_10358423.html. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://sz.oeeee.com/html/202212/29/1322097.html. {{cite web}}: Missing or empty |title= (help)
  7. ↑ https://shenzhen.sina.com.cn/news/zh/2019-08-19/detail-ihytcern1917017.shtml. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 https://www.qcc.com/weblogin?back=%2Ffirm%2Fdf7ab2cd6083270cfe4a476204790e0b.html. {{cite web}}: Missing or empty |title= (help)
  9. ↑ "深圳市天然气储备与调峰库工程试投产-新闻-能源资讯-中国能源网". www.china5e.com. 2019-08-19. Retrieved 2021-04-09.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "深圳天然气储备与调峰站投产在即-中国石油新闻中心-中国石油新闻中心". news.cnpc.com.cn. 2019-08-21. Retrieved 2021-04-09.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "深圳燃气全力保障春节供气稳定". 信息来源:深圳特区报 qh.sz.gov.cn. 2021-02-09. Retrieved 2021-04-09.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ 12.0 12.1 "深圳市天然气储备与调峰库二期扩建工程开工建设--部门动态 信息来源:深圳市国资委". www.sz.gov.cn (in 中文(中国大陆)). 2022-12-27.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "深圳天然气储备与调峰库二期开工,选址大鹏葵涌--南方都市报APP • 深圳大件事 原创". m.mp.oeeee.com. 2022-12-28. {{cite web}}: line feed character in |title= at position 41 (help)CS1 maint: url-status (link)
  14. ↑ "深圳市2026年重大项目计划清单". 2026-02-28. Retrieved 2026-03-24.{{cite web}}: CS1 maint: url-status (link)