Shanghai Shidongkou power station

From Global Energy Monitor
(Redirected from Shidongkou power station)

Shanghai Shidongkou power station (华能上海石洞口发电厂) consists of two power stations: Shidongkou-1 and Shidongkou-2 in Shanghai, China.

Location

The undated satellite photo below shows the plant in Shenqiao Town, Baoshan.

Loading map...

Background

Shidongkou-1 is a 4 x 325 MW plant commissioned from 1988 to 1990. Shidongkou-2 is a 2 x 600 MW and 2 x 660 MW plant commissioned from 1992 to 2009. They are majority-owned by China Huaneng.[1]

CCS

Part of one Shidongkou-2 600 MW reactor has carbon capture and storage capabilities to capture 0.1 Million tonnes a year (approximately 4% of a single unit's output).[2]

Replacement

Shidongkou-1 Units 1-4 are planned to be replaced with two new 650 MW units. The units were permitted for construction in December 2019 and are planned to be commissioned in 2022. The new units are sponsored by China Huaneng and Shenergy Group.[3]

Construction began in December 2020.[4]

Plant Details of Shidongkou-1 and 2

Sponsor:

  • Shidongkou-1: China Huaneng
  • Shidongkou-2: China Huaneng, Shenergy Group

Location: Shenqiao Town, Baoshan, Shanghai, China
Coordinates: 31.4650719, 121.4048433 (exact)
Status: Operating
Nameplate capacity: 1,300 MW (Shidongkou-1), 2,520 MW (Shidongkou-2)
Type: Subcritical (Shidongkou-1), Supercritical (Shidongkou-2, Units 1-2), Ultra-supercritical (Shidongkou-2, Units 3-4)
Start year: 1988-2009
Coal Type: Bituminous
Coal Source:
Source of financing:

Project Details of Shidongkou-1 replacement

Sponsor: China Huaneng, Shenergy Group Location: Shenqiao Town, Baoshan, Shanghai, China
Coordinates: 31.4650719, 121.4048433 (exact)
Status: Construction
Nameplate capacity: 1,300 MW (Units 1 & 2: 650 MW)
Type: Ultra-supercritical
Start year: 2022
Coal Type: Bituminous
Coal Source:
Source of financing:

Articles and resources

References

  1. "Coal-Fired Plants in Shanghai," Industcards, accessed November 2016
  2. "Shidongkou Fact Sheet: Carbon Dioxide Capture and Storage Project," MIT CCS site, accessed Oct 2016
  3. "华能上海石洞口第一电厂2台65万千瓦等容量煤电替代项目," 上海市发改委信息公开, 2019-08-30
  4. "2×650MW!全国首个获得核准批复的等容量替代煤电项目开工 - 北极星火力发电网". news.bjx.com.cn. 2020-12-10. Retrieved 2020-12-14.