Gürmin Enerji Amasya power station

From Global Energy Monitor
(Redirected from Soma Merzifon power station)
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Gürmin Enerji Amasya power station (Gürmin Enerji Amasya Termik Santrali) is a cancelled power station in Merzifon/Kayadüzü, Amasya, Türkiye.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Gürmin Enerji Amasya power station Merzifon/Kayadüzü, Amasya, Türkiye 40.889, 35.597 (approximate)

The map below shows the approximate location of the power station.

Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 1 cancelled coal - lignite 300 circulating fluidized bed

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 Soma Termik Santral Elektrik Uretim AŞ [100.0%]

Project-level coal details

  • Coal source(s): domestic

Background

In April 2013, Soma Holding received a permit to build a coal mine and 270-405 MW mine-to-mouth coal-fired power plant in Amasya province. The company planned to further assess the mine's reserves, and decide based on that whether to build a plant of two or three 135-MW units.[1][2] In May 2013, Soma Holding began initial production at the new Amasya Merzifon coal mine.[3]

Soma Holding's license application is for a 300 MW plant.

In February 2014, Soma Holding held the first of a series of public hearings. Locals and environmentalists expressed opposition to the proposed plant and its effects on local agriculture.[4] On 13 May 2014, an explosion at a Soma Holding coal mine in Soma caused an underground coal seam fire, which burned until 15 May.[5][6] The disaster killed 301 people, and is the worst mine disaster in Turkey's history.[7][8]

After the disaster opposition to the power plant increased, and the EIA process was suspended on 25 August 2016. In December 2017 the Ministry of Environment and Urbanization decided to terminate the EIA process of the project, as the revision report was not submitted for 13 months after the suspension date and the company did not provide any information.[9]

Articles and Resources

References

  1. Soma Holding Yeni Çeltek`e 405 MW`lik santral kuracak, Enerji Günlüğü, Apr. 29, 2013.
  2. Kömür Madenciliği: Merzifon Bölgesi, Soma Holding website, accessed May 2014.
  3. Alp Gürkan, Merzifon’da kömür üretimine başlıyor, Enerji Günlüğü, May 3, 2013.
  4. Kayadüzü halkı termiğe karşı halk toplantısında buluştu, Muhalefet, Feb. 2, 2014.
  5. "Turkish mine disaster: Unions call protest strike". BBC News. Retrieved 15 May 2014.
  6. Constanze Letsch. "Turkey: miners and mourners scorn government that 'laughs at our pain'". the Guardian. Retrieved 19 May 2015.
  7. "Turkey mine disaster: firm claims 'unprecedented' fire". TurkishPress.com. 15 May 2014. Retrieved 15 May 2014.
  8. "Four people arrested over Turkey mine disaster". TurkishPress.com. 18 May 2014. Retrieved 18 May 2014.
  9. "Amasya'da termik santral kâbusu son buldu," Birgün Gazetesi, Dec 27, 2017

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.