Subic New Pv Solar Power Plant Project
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Subic New Pv Solar Power Plant Project is an operating solar photovoltaic (PV) farm in Bataan Province, Philippines.
Project Details
Table 1: Phase-level project details for Subic New Pv Solar Power Plant Project
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|---|
1 | Operating[1] | 2019[2] | 100 MWp/dc[3] | PV[1] | Jobin-SQM Inc [100%][3] |
2 | Construction[4] | 2025 (planned)[5] | 86.2 MWp/dc[4] | PV[6] | Jobin-SQM Inc[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Subic New Pv Solar Power Plant Project
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Bataan Province, Philippines[7] | 14.8089, 120.3640 (exact)[7] |
2 | Morong, Bataan Province, Philippines[6] | 14.8089, 120.3640 (approximate)[6] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://web.archive.org/web/20240308203935/https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf. Archived from the original (PDF) on 2024-03-08.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf https://mb.com.ph/2019/01/06/100mw-subic-solar-plant-connects-to-luzon-grid/, https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_solar_2021-05-31.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 3.0 3.1 https://web.archive.org/web/20220816002205/https://mb.com.ph/2019/01/06/100mw-subic-solar-plant-connects-to-luzon-grid/. Archived from the original on 16 August 2022.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon_Committed_30_apr_2024.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_2.pdf.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 (PDF) https://web.archive.org/web/20240125191519/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_indicative_2022-mar-31-updated-05172022.pdf?withshield=1. Archived from the original (PDF) on 2024-01-25.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 https://www.google.com/maps/place/Subic+Solar+Farm/@14.8087972,120.3617191,727m/data=!3m2!1e3!4b1!4m5!3m4!1s0x33966e3f26ffeadf:0xf736190744b7d11!8m2!3d14.8087972!4d120.3639132.
{{cite web}}
: Missing or empty|title=
(help)