Summit FSRU is an operating LNG import terminal in Bangladesh.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Summit FSRU Moheshkhali Island, Bay of Bengal, Cox's Bazar, Chittagong, Bangladesh[1][2] 21.562987, 91.821147 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Summit FSRU import[3] operating[3] 3.8 mtpa[4] 3.8 mtpa True –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Summit FSRU import[3] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Summit FSRU import[3] operating[3] 2017[5] – 2017 2019[6][3] –[3]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Summit FSRU import[3] operating[3] Summit LNG Terminal Co Ltd[7][8] Summit Power International Ltd Summit LNG Terminal[7][8]

Table 6: Vessel ownership

Name Facility type Status Vessel Vessel owners
Summit FSRU import[3] operating[3] Summit LNG[3] Excelerate Energy[9]

Background

In January 2017, Summit Group signed an initial contract with Petrobangla to set up a liquefied natural gas terminal on Moheshkhali Island in Cox's Bazar at a cost of about US $500 million. It would have capacity of 3.5 mtpa. Summit said it would develop the floating facilities within 18 months of signing the final contract.[10][11]

In January 2019, Summit announced that it expected the FSRU to begin operations in March 2019.[12] The FSRU was commissioned in April 2019.[13]

Summit's FSRU ceased operations for routine maintenance in January 2024 and resumed operation in April 2024[14], maintaining the same capacity.[15]

In January 2024, Summit Group has signed a preliminary pact to supply 1.5 mtpa of LNG to state-run Petrobangla for 15 years, starting from October 2026.[16] In June 2024, the supply contract was finalized.[17]

In early June 2024, the FSRU was damaged by Cyclone Remal. The FSRU will be sent to Singapore or the Middle East for repairs which should last up to three weeks.[18] During this time production at the terminal will be temporarily shut down.[19][20]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.google.com/maps/place/21%C2%B033'46.8%22N+91%C2%B049'16.1%22E/@21.5629871,91.8185662,1194m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d21.5629871!4d91.8211465?entry=ttu&g_ep=EgoyMDI1MDgxMy4wIKXMDSoASAFQAw%3D%3D. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://www.vesselfinder.com/?imo=9322255. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 (PDF) https://cdn.prod.website-files.com/67bdb9fc993751711c5f54fd/685278fda1e68e3b4324e2cf_0432365c1c5b8fb129ae8055cca8cb9b_%23GIIGNL%20-%20Livre%202025-20250610-Simple.pdf. {{cite web}}: Missing or empty |title= (help)
  4. ↑ https://www.tbsnews.net/bangladesh/energy/summits-floating-lng-terminal-set-resume-gas-supply-early-april-818186. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://www.thedailystar.net/business/summit-signs-deal-build-500m-lng-terminal-1340404. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://www.rivieramm.com/news-content-hub/news-content-hub/bangladeshs-innovative-fsru-lng-import-terminal-55200. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 https://summitpowerinternational.com/summit-lng-terminal. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 https://summitpowerinternational.com/about-us. {{cite web}}: Missing or empty |title= (help)
  9. ↑ https://finance.yahoo.com/quote/EE/profile/. {{cite web}}: Missing or empty |title= (help)
  10. ↑ Summit LNG Terminal The Daily Star, Jan. 5, 2017.
  11. ↑ "Govt to set up two land-based LNG terminals" The Daily Star, June 15, 2017.
  12. ↑ Bangladesh's second LNG terminal to start in March; supply faces hiccups, Reuters, Jan. 15, 2019
  13. ↑ Bangladesh’s Second LNG Terminal Commissioned Excelerate Energy, May 1, 2019.
  14. ↑ "Summit FSRU resumes production". Daily Observer. Apr 16, 2024. Retrieved June 3, 2024.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "Summit's floating LNG terminal set to resume gas supply in early April". The Business Standard. Mar 29, 2024. Retrieved June 3, 2024.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "Bangladesh's Summit to supply 1.5 mln T LNG to Petrobangla from Oct 2026". Reuters. Jan 16, 2024. Retrieved June 4, 2024.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "15-year LNG supply deal with Summit". The Financial Express. June 5, 2024. Retrieved June 4, 2024.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "Bangladesh's Summit LNG to send damaged FSRU to Singapore or Middle East for repairs". LNGPrime. Jun 3, 2024. Retrieved Jun 14, 2024.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "Bangladesh's Summit LNG says FSRU operations paused due to cyclone damage". Zawya.com. June 1, 2024. Retrieved June 4, 2024.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "Cyclone damages Excelerate's FSRU in Bangladesh". LNGPrime. Jun 3, 2024. Retrieved Jun 14, 2024.{{cite web}}: CS1 maint: url-status (link)