Ocean Cay LNG Terminal is a cancelled (confirmed) LNG import terminal in Bahamas.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Ocean Cay LNG Terminal Ocean Cay, Bimini, Bahamas[1] 25.41667, -79.21667 (approximate)

The map below shows the approximate location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Ocean Cay LNG Terminal import[1][2][3][4] cancelled (confirmed)[5] 6.42 mtpa[1][2] 6.42 mtpa False –

Table 3: Cost

Name Facility type Cost Total known terminal costs
Ocean Cay LNG Terminal import[1][2][3][4] – –

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Ocean Cay LNG Terminal import[1][2][3][4] cancelled (confirmed)[5] – – – – –[5]

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Ocean Cay LNG Terminal import[1][2][3][4] cancelled (confirmed)[5] AES Corp [100%][1] AES Corp [100.0%] AES[1]

Background

Ocean Cay LNG Terminal was a proposed LNG terminal in the Bahamas.[6] The facility would have been used to meet rising demand for natural gas in Florida through the planned 94-mile Ocean Cay Pipeline that would have connected the terminal to the Exclusive Economic Zone boundary between the Bahamas and the United States.[7]

The facility was planned to include two 160,000 m3 LNG storage tanks and be capable of accommodating LNG carriers up to 140,000 m3 in size.[7] The terminal would also include a liquified petroleum gas (LPG) terminal with a 40,000 m3 LPG storage tanks and be capable of accommodating LPG carriers up to 80,000 m3. The facility was planned to include three 15-megawatt natural gas-fired generators and a desalination plant to supply power and water, respectively, for facility operations.[7]

The LNG terminal's Environmental Impact Assessment was filed in September 2002 and was approved in October 2003.[7] Initially, AES anticipated receiving final project approval in 2008, commencing construction in 2009, and commissioning the terminal in the first quarter of 2012.[7] However, opposition to the LNG terminal from local environmental groups resulted in delays in the approval process.[7]

In August 2009, AES announced it would lease the project site to a Bahamas-based company.[7]

Citizen Opposition

Opposition to the LNG project grew after approval of the environmental impact statement. In 2005, environmental advocacy group ReEarth led a national petition against the LNG project.[8] Citizen and environmental advocates cited concerns about the potential marine pollution from chemical run-off, coral reef and sea bed damage from pipelines, and inadequate regulatory oversight.[8]

According to United States Embassy cables leaked by Wikileaks, growing citizen opposition to the LNG terminal led the Bahamian government to delay approving of the project, eventually leading it be scrapped.[9] In one cable, a U.S. embassy official expressed frustration with delays at the planned LNG terminal, stating "Government ministers have been promising a decision 'in a few weeks' for nearly two years. Even for the consensus-driven society of The Bahamas, the LNG debate has been long, protracted, and increasingly bitter."[9]

Multiple cables show that project developer AES Corporation grew increasingly frustrated with delays in getting final approval for the project, first under Prime Minister Perry G. Christie and then under his successor Prime Minister Hubert Ingraham.[9]

The Bahamian government's primary LNG proponent, Minister of Trade and Industry Leslie Miller, alleged in a radio interview that environmental organization Re-Earth was successful at gaining media attention because its leader Sam Duncombe was white.[9]

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.offshore-technology.com/projects/oceancaylngterminala/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 (PDF) https://giignl.org/system/files/q-flexq-max_acceptability_database_-_march_.pdf. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 https://www.bahamasb2b.com/news/wmview.php?ArtID=5034. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 https://www.thenassauguardian.com/index.php?option=com_content&id=11181&Itemid. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 http://www.hydrocarbons-technology.com/projects/oceancaylngterminala/. {{cite web}}: Missing or empty |title= (help)
  6. ↑ Q-Flex/Q-Max Acceptability Database (regasification terminal overview), GIIGNL, accessed April 2017
  7. ↑ 7.0 7.1 7.2 7.3 7.4 7.5 7.6 Ocean Cay LNG Terminal and Pipeline, Bahamas, Offshore Technology (formerly Hydrocarbons Technology), accessed September 2017