Titas Gas Field (Bangladesh)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Titas Gas Field is an operating gas field in Bangladesh.

Project Details

Main Data

Table 1: Field-level project details for Titas Gas Field

1Final Investment Decision
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type
Titas operating[1] Bangladesh Gas Fields Company Ltd. (BGFCL)[2] Bangladesh Oil, Gas and Mineral Corp [100%][3] 1962[4][2] 1968[2] conventional[1]

Production and Reserves

Table 2: Reserves of Titas Gas Field

million m³ = million cubic meters
Fuel description Reserves classification Quantity Units Data year Source
gas original recoverable reserves 214642.86 million m³ 2020 [2]
gas remaining recoverable reserves 180294.34 million m³ 2020 [5]
gas Remaining recoverable reserves 77305.41 million m³ 2020 [2]

Table 3: Production from Titas Gas Field

million m³/y = million cubic meters per year
million m³ = million cubic meters
Category Fuel description Quantity Units Data year Source
cumulative production gas 137337.45 million m³ 2020 [2]
production gas 4330.78 million m³/y 2020 [5]
production design capacity gas 4888.93 million m³/y 2020 [5]

Location

Table 4: Field-level location details for Titas Gas Field

Location Onshore/Offshore Coordinates (WGS 84)
onshore, Bangladesh[3] onshore[6] 23.9952, 91.1188 (exact)[3]

The map below shows the exact location of the field:

Loading map...

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://web.archive.org/web/20230601053035/https://www.offshore-technology.com/marketdata/oil-gas-field-profile-titas-conventional-gas-field-bangladesh/. Archived from the original on 01 June 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 https://web.archive.org/web/20210417012239/https://thefinancialexpress.com.bd/trade/titas-gas-fields-output-sapping-fast-1584074339. Archived from the original on 17 April 2021. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://downloads.climatetrace.org/sector_packages/fossil_fuel_operations.zip. {{cite web}}: Missing or empty |title= (help)
  4. https://web.archive.org/web/20220709182658/https://mpemr.gov.bd/power/details/65. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 (PDF) http://www.petrobangla.org.bd/sites/default/files/files/petrobangla.portal.gov.bd/annual_reports/b01f8121_46b5_4cd0_96be_bc5b43cb2010/2022-03-27-10-27-5bf851d9f53edf0db83f223675765243.pdf. {{cite web}}: Missing or empty |title= (help)
  6. https://www.naturalearthdata.com/downloads/10m-physical-vectors/10m-land/. {{cite web}}: Missing or empty |title= (help)