Hai Linh LNG Terminal is a liquefied natural gas (LNG) import terminal shelved in Vietnam.

Location

The terminal is proposed to be located in for Phu Long Island off Vung Tau Bà Rịa–Vũng Tàu.

Loading map...

Project details

  • Operator:
  • Owner: Hai Linh Co Ltd[1]
  • Parent company: Hai Linh Co Ltd[1]
  • Location: Bà Rịa–Vũng Tàu, Vietnam
  • Coordinates: 10.383333,107.116667 (approximate)
  • Capacity: 1.5 mtpa,[2] 3 mtpa
  • Status: Construction[3]
  • Type: Import[1]
  • Start year: 2021[4]

Note: mtpa = million tonnes per year; bcfd = billion cubic feet per day

Background

Hai Linh LNG Terminal was a proposed LNG terminal in Bà Rịa–Vũng Tàu, Vietnam. It was originally planned for operation in 2012.[5] The project was considered shelved until 2019 when it was reinitiated with help from the U.S. Trade and Development Agency, which finalized a grant agreement with Vietnam Electricity (EVN) to produce a feasibility study to assess the site selection and optimal design for the $1 billion liquefied natural gas (LNG) terminal and gas-to-power project. USTDA’s feasibility study will set the initial parameters for the growth of LNG in the nation while also opening new opportunities for U.S. firms to supply gas infrastructure. This project supports the Trump Administration’s Indo-Pacific vision and its AsiaEDGE initiative – Enhancing Development and Growth through Energy – in which USTDA and its interagency partners are promoting sustainable and secure energy markets throughout the Indo-Pacific region. The grant also supports USTDA’s Gas Infrastructure Exports Initiative, which is advancing gas infrastructure in partner countries by connecting project sponsors to cutting-edge U.S. technologies, equipment and long-term development.[6]

In September 2020 it was reported that construction of the terminal had been completed.[4] Hai Linh Company planned to commissioned the project in Q2 2021.[4]

As of December 2021, the terminal had yet to undergo testing and commissioning.[3]

As of July 2023, the terminal has not started operating and is presumed to be shelved.[7][8]

Articles and resources

References

  1. 1.0 1.1 1.2 Eric Yep, Vietnam's first LNG terminal Hai Linh to conduct test run late 2020 S&P Global, June 20, 2020
  2. "Latest Reports and Analysis". www.fgenergy.com. Retrieved 2022-07-26.
  3. 3.0 3.1 "The Future of LNG in Vietnam After COP26". Retrieved 2022-07-26.
  4. 4.0 4.1 4.2 Global regasification under construction is expected to hit a 10-year high, LNG Industry, Sep. 3, 2020
  5. Vietnam LNG Terminal, A Barrel Full, accessed April 2017
  6. USTDA Supports Historic LNG Development in Vietnam USTDA, accessed May 2019
  7. theinvestor.vn. "Investment opportunities in LNG-to-power projects in Vietnam". Retrieved 2023-07-14.
  8. Refinitiv (2022). "Refinitiv Commodities Research: Natural Gas & LNG" (PDF). refinitiv.com.{{cite web}}: CS1 maint: url-status (link)