Vindhyachal power station is an operating power station of at least 4760-megawatts (MW) in Waidhan, Singrauli, Madhya Pradesh, India.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Vindhyachal power station Waidhan, Singrauli, Singrauli, Madhya Pradesh, India 24.0983, 82.6719 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Phase 1 Unit 1, Phase 1 Unit 2, Phase 1 Unit 3, Phase 1 Unit 4, Phase 1 Unit 5, Phase 1 Unit 6, Phase 2 Unit 1, Phase 2 Unit 2, Phase 3 Unit 1, Phase 3 Unit 2, Phase IV unit 11, Phase IV units 12, Phase V Unit 13: 24.0983, 82.6719

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Phase 1 Unit 1 operating coal - bituminous 210 subcritical 1987
Phase 1 Unit 2 operating coal - bituminous 210 subcritical 1988
Phase 1 Unit 3 operating coal - bituminous 210 subcritical 1989
Phase 1 Unit 4 operating coal - bituminous 210 subcritical 1989
Phase 1 Unit 5 operating coal - bituminous 210 subcritical 1990
Phase 1 Unit 6 operating coal - bituminous 210 subcritical 1991
Phase 2 Unit 1 operating coal - bituminous 500 subcritical 1999
Phase 2 Unit 2 operating coal - bituminous 500 subcritical 2000
Phase 3 Unit 1 operating coal - bituminous 500 subcritical 2006
Phase 3 Unit 2 operating coal - bituminous 500 subcritical 2007
Phase IV unit 11 operating coal - bituminous 500 subcritical 2012
Phase IV units 12 operating coal - bituminous 500 subcritical 2013
Phase V Unit 13 operating coal - bituminous 500 subcritical 2015

Table 3: Unit-level ownership and operator details

Unit name Owner
Phase 1 Unit 1 NTPC Ltd [100.0%]
Phase 1 Unit 2 NTPC Ltd [100.0%]
Phase 1 Unit 3 NTPC Ltd [100.0%]
Phase 1 Unit 4 NTPC Ltd [100.0%]
Phase 1 Unit 5 NTPC Ltd [100.0%]
Phase 1 Unit 6 NTPC Ltd [100.0%]
Phase 2 Unit 1 NTPC Ltd [100.0%]
Phase 2 Unit 2 NTPC Ltd [100.0%]
Phase 3 Unit 1 NTPC Ltd [100.0%]
Phase 3 Unit 2 NTPC Ltd [100.0%]
Phase IV unit 11 NTPC Ltd [100.0%]
Phase IV units 12 NTPC Ltd [100.0%]
Phase V Unit 13 NTPC Ltd [100.0%]

Project-level coal details

  • Coal source(s): Pakri Barwadih Coal Block
  • Permit(s): February 5, 2009 – Environmental Clearance, May 2, 2012 – Environmental Clearance

Financing

Source of financing:

Background

The station comprises 13 units, built in five stages between 1997 and 2015.[1][2][3]

Stage I

  • Unit 1 - 210 MW - 1987
  • Unit 2 - 210 MW - 1988
  • Unit 3 - 210 MW - 1989
  • Unit 4 - 210 MW - 1989
  • Unit 5 - 210 MW - 1990
  • Unit 6 - 210 MW - 1991

Stage II

  • Unit 7 - 500 MW - 1999
  • Unit 8 - 500 MW - 2000

Stage III

  • Unit 9 - 500 MW - 2006
  • Unit 10 - 500 MW - 2007

Stage IV[4]

  • Unit 11 - 500 MW - 2012
  • Unit 12 - 500 MW - 2013

Stage V

  • Unit 13 - 500 MW[5] - had a planned start date of 2016,[6] and was commissioned in August 2015.[3]

Articles and Resources

References

  1. National Thermal Power Corporation, "Coal Based Power Stations: Vindhyachal,", National Thermal Power Corporation website, accessed June 2010.
  2. National Thermal Power Corporation, "Future Capacity Additions", National Thermal Power Corporation website, accessed June 2010.
  3. 3.0 3.1 "BHEL commissions 500 MW thermal unit at Vindhyachal STPS," The Economic Times, 7 Aug 2015
  4. "Monthly Report on Broad Status of Thermal Power Projects in the Country" Government of India Ministry of Power, August 2013.
  5. "Vindhyachal STPP Stage-V Updated: January 2012," Infraline Energy, Jan. 2, 2010.
  6. "NTPC Investor presentation," August 1, 2013.

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.