Windstar wind farm (Ghana)

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Ada wind farm

Windstar wind farm (Ghana) is a wind farm in pre-construction in Ada Foah, Ada East District, Ghana.

Project Details

Table 1: Phase-level project details for Windstar wind farm (Ghana)

Status Nameplate capacity Type Owner Operator
Pre-construction[1] 50 MW[1] Onshore[2] EleQtra; Engie[3] EleQtra; Engie[3]

Location

Table 2: Phase-level location details for Windstar wind farm (Ghana)

Location Coordinates (WGS 84)
Ada Foah, Ada East District, Ghana[4] 5.8085, 0.6001 (approximate)[4]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.africa-energy.com/article/ghana-windstar-hit-financial-close-q2-2022. {{cite web}}: Missing or empty |title= (help)
  2. https://eleqtra.com/projects/windstar/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://theelectricityhub.com/windstar-wind-farm-to-reach-financial-close-in-next-year/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.africa-energy.com/database/windstar-ada-wind. {{cite web}}: Missing or empty |title= (help)