Wossingen Cement Plant

From Global Energy Monitor
(Redirected from Wossingen cement plant)
This article is part of the
Global Cement and Concrete Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

Wossingen Cement Plant (Wossingen Zementwerk) is an integrated cement plant operating in Walzbachtal, Baden-Württemberg, Germany.

Location

The map below shows the exact location of the cement plant in Walzbachtal, Baden-Württemberg, Germany[1]:

Loading map...


Coordinates (WGS 84): 49.016834, 8.614441 (exact)[2]

Background

The Wossingen cement plant was taken over by Lafarge Germany in 1963. The plant was subsequently modernized in 1970 and, in 2009, the dual kiln line was replaced by a single kiln line with increased efficiency. In 2015 the plant was taken over by CRH group and rebranded to Opterra.

Cement Plant Details

Table 1: General Plant Details

Plant type Plant status Start date
integrated[1] Operating[1] 1950[1]

Table 2: Ownership Details

Additional information including parent company references and full ownership trees available at the Global Energy Ownership Tracker.
Parent company Parent company GEM ID Owner name Owner company GEM ID
CRH PLC [100.0%] E100000131458 [100.0%] Opterra Wössingen GmbH [100.0%][1] E100002007370 [100.0%]

Table 3: Capacities

Cement capacity (million metric tonnes per annum) Clinker capacity (million metric tonnes per annum) Unspecified capacity (million metric tonnes per annum)
0.8[3] 1.3[3]

Table 4: Cement Production

Primary cement color Primary cement type Production type Green cement technology
grey[4] blended[4] dry[5] Alternative fuels [5]

Articles and Resources

Additional data

To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20250215001339/https://opterra-crh.com/ueber-uns. Archived from the original on 15 February 2025. {{cite web}}: Missing or empty |title= (help)
  2. https://www.google.com/maps/place/49%C2%B001'00.6%22N+8%C2%B036'52.0%22E/@49.016838;8.6118665;999m/data=!3m2!1e3!4b1!4m4!3m3!8m2!3d49.0168345!4d8.6144414?entry=ttu. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20250225205513/https://www.cemnet.com/Articles/story/150450/elevating-service-life.html. Archived from the original on 25 February 2025. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://opterra-crh.com/produkte. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://www.zkg.de/en/artikel/zkg_2011-01_Lafarge_plant_Woessingen_optimally_equipped_for_new_products_and-1045552.html. {{cite web}}: Missing or empty |title= (help)