Datang Xiahuayuan power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Datang Xiahuayuan power station (大唐国际下花园发电厂) is a power station in Xiahuayuan, Zhangjiakou, Hebei, China with multiple units of varying statuses, none of which are currently operating. It is also known as 大唐下花园电厂2×660MW热电联产扩建项目 (Cogen Unit 1 & 2).
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Datang Xiahuayuan power station | Xiahuayuan, Zhangjiakou, Hebei, China | 40.489128, 115.2663332 (exact)[1] |
Unit-level coordinates (WGS 84):
- Cogen Unit 1, Cogen Unit 2, Unit 10, Unit 11, Unit 12, Unit 13, Unit 14: 40.489128, 115.2663332
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| Cogen Unit 1 | Permitted[1] | coal: unknown[2][3] | 660[1] | ultra-supercritical[1] | yes[3] | – | – | False |
| Cogen Unit 2 | Permitted[1] | coal: unknown[2][3] | 660[1] | ultra-supercritical[1] | yes[1] | – | – | False |
| Unit 10 | Retired | coal: subbituminous[2] | 100 | subcritical | yes | 1982 | 2007 | False |
| Unit 11 | Retired | coal: subbituminous[2] | 100 | subcritical | yes | 1983 | 2007 | False |
| Unit 12 | Retired[4] | coal: subbituminous[2] | 210 | subcritical | yes | 1988 | 2024[4] | False |
| Unit 13 | Cancelled | coal: unknown[5][2] | 50[5] | unknown | yes[5] | – | – | False |
| Unit 14 | Cancelled | coal: unknown[5][2] | 50[5] | unknown | yes[5] | – | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Cogen Unit 1 | Datang International Power Generation Co Ltd [100%][3] | Datang International Power Generation Co Ltd [100.0%] |
| Cogen Unit 2 | Datang International Power Generation Co Ltd [100%][3] | Datang International Power Generation Co Ltd [100.0%] |
| Unit 10 | Datang International Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
| Unit 11 | Datang International Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
| Unit 12 | Datang International Power Generation Co Ltd [100%] | Datang International Power Generation Co Ltd [100.0%] |
| Unit 13 | Zhangjiakou Ruiyang Energy Co Ltd [100%][5] | Service Center of Yudaishan Industrial Park, Xiahuayuan District, Zhangjiakou City [100.0%] |
| Unit 14 | Zhangjiakou Ruiyang Energy Co Ltd [100%][5] | Service Center of Yudaishan Industrial Park, Xiahuayuan District, Zhangjiakou City [100.0%] |
Project-level coal details
- Coal source(s): domestic
Background
The project was approved by the provincial development and reform commission in October 2025[6]. Tenders for major equipment and preliminary design review were issued in early 2026[7][8], with major equipment contract awards following[9].
Additional tenders for construction supervision and site preparation were announced in June and July 2026[10][11]. The boiler equipment contract was signed in July 2026[12], and the construction supervision contract was awarded in July 2026[13].
Unit 12 retired in 2024 as per Hebei's outdated capacity elimination list[14]. Units 13 & 14 had no news and were cancelled in July 2026.
In March 2024, EIA services were tendered. In April 2024, the project was approved by the provincial DRC. In May 2024, survey and design bidding was announced. In June 2024, the survey and design contract was awarded. In October 2024, the second EIA public notice was published. In 2025, the project was listed on Zhangjiakou's key projects list. In October 2025, the project received approval. In February 2026, major equipment bidding commenced. In March 2026, preliminary design review services were tendered. In April 2026, the design review contract was awarded, and major equipment contracts were awarded. In May 2026, planning and design services were tendered. In June 2026, supervision and site preparation bidding commenced. In July 2026, the boiler equipment contract was signed, and supervision contracts were awarded[15].
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://news.bjx.com.cn/html/20240313/1365781.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 https://news.bjx.com.cn/html/20251016/1465146.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://news.bjx.com.cn/html/20250324/1433666.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://news.bjx.com.cn/html/20210616/1158512.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "大唐下花园电厂2×660MW热电联产扩建项目正式获得核准批复". WeChat. 2025-10-14. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐下花园电厂2X660MW热电联产扩建项目三大主机招标". WeChat. 2026-02-11. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐国际发电股份有限公司下花园热电分公司2X660MW热电联产扩建项目初步设计审查服务招标". BJX. 2026-03-03. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐下花园电厂2×660MW热电联产扩建项目三大主机中标公示". BJX. 2026-04-08. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐国际发电股份有限公司下花园热电分公司2×660MW热电联产扩建项目施工监理及质量评价服务招标公告". WeChat. 2026-06-03. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐国际发电股份有限公司下花园热电分公司2X660MW热电联产扩建项目五通一平施工总承包招标公告". WeChat. 2026-06-23. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "哈电锅炉与大唐国际发电股份有限公司下花园热电分公司签订了大唐下花园电厂2×660MW热电联产扩建项目锅炉设备合同". WeChat. 2026-07-01. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "西北电建监理公司中标大唐下花园电厂2X660MW热电联产扩建项目施工监理及质量评价服务". WeChat. 2026-07-07. Retrieved 2026-07-17.
{{cite web}}: CS1 maint: url-status (link) - ↑ "2024年河北省火电行业淘汰落后产能目标任务完成情况的公告". 北极星电力网. 2025-03-24. Retrieved 2025-03-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "大唐国际发电股份有限公司下花园热电分公2×660MW热电联产扩建项目五通一平施工总承包中标候选人公示". 北极星电力网. 2026-07-27. Retrieved 2026-07-27.
{{cite web}}: CS1 maint: url-status (link)