Xinjiang Jiashi Tarim Oilfield solar farm
From Global Energy Monitor
(Redirected from Xinjiang Jiashi County 600 MW solar farm)
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Xinjiang Jiashi Tarim Oilfield solar farm (塔里木油田伽师60万千瓦光伏发电项目) is an operating solar photovoltaic (PV) farm in Jiashi, Kashgar Prefecture, Xinjiang, China.
Project Details
Table 1: Phase-level project details for Xinjiang Jiashi Tarim Oilfield solar farm
Status | Commissioning year | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
Operating[1] | 2024[1] | 600 MW[1] | PV[1] | PetroChina Tarim Oilfield Co (中国石油塔里木油田公司)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Xinjiang Jiashi Tarim Oilfield solar farm
Location | Coordinates (WGS 84) |
---|---|
Jiashi, Kashgar Prefecture, Xinjiang, China[1] | 39.7890, 77.0150 (approximate)[1] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References