Tangshan LNG Terminal (Xintian)
| Part of the Global Gas Infrastructure Tracker, a Global Energy Monitor project. |
Tangshan LNG Terminal (Xintian), also known as 新天唐山曹妃甸LNG接收站, is an LNG import terminal in China with units that are proposed, operating, and in construction.
Location
Table 1: Location details
| Name | Location | Coordinates (WGS 84) |
|---|---|---|
| Phase 1 | Caofeidian Industrial Zone, Tangshan, Hebei, China[1][2][3] | 38.938745, 118.541145 (exact) |
| Phase 2 | Caofeidian Industrial Zone, Tangshan, Hebei, China[1][2][3] | 38.938745, 118.541145 (exact) |
| Phase 3 | Caofeidian Industrial Zone, Tangshan, Hebei, China[1][2][3] | 38.938745, 118.541145 (exact) |
The map below shows the exact location of the terminal:
Project Details
Table 2: Infrastructure details
| Name | Facility type | Status | Capacity | Total terminal capacity | Offshore | Associated infrastructure |
|---|---|---|---|---|---|---|
| Phase 1 | import[3] | operating[4] | 5 mtpa | 12.0 mtpa | False | – |
| Phase 2 | import[1] | construction[1] | 5 mtpa | 12.0 mtpa | False | – |
| Phase 3 | import[5] | proposed[2] | 2 mtpa | 12.0 mtpa | False | – |
Table 3: Cost
| Name | Facility type | Cost | Total known terminal costs |
|---|---|---|---|
| Phase 1 | import[3] | –[6] | US$4,062,400,000 |
| Phase 2 | import[1] | –[6] | US$4,062,400,000 |
| Phase 3 | import[5] | –[6] | US$4,062,400,000 |
Financing
No financing data available.
Table 4: Project timeline
| Name | Facility type | Status | Proposal year | FID year | Construction year | Operating year | Inactive year |
|---|---|---|---|---|---|---|---|
| Phase 1 | import[3] | operating[4] | 2019[2] | – | 2020[7] | 2023[4] | – |
| Phase 2 | import[1] | construction[1] | – | – | 2021[1] | –[8][9][3][8][9][3] | – |
| Phase 3 | import[5] | proposed[2] | 2019[2] | – | – | –[3][3] | – |
Ownership
Table 5: Ownership
| Name | Facility type | Status | Owners | Parent companies | Operator |
|---|---|---|---|---|---|
| Phase 1 | import[3] | operating[4] | Caofeidian Xintian LNG Co Ltd [100%][10] | Caofeidian Xintian LNG Co Ltd [100.0%] | – |
| Phase 2 | import[1] | construction[1] | Caofeidian Xintian LNG Co Ltd [100%][10] | Caofeidian Xintian LNG Co Ltd [100.0%] | – |
| Phase 3 | import[5] | proposed[2] | Caofeidian Xintian LNG Co Ltd [100%][10] | Caofeidian Xintian LNG Co Ltd [100.0%] | – |
Background
In September 2018 Caofeidian Xintian Liquefaction Natural Gas Company announced plans to build the project in three phases, with completion of Phase I expected in October 2020.[11][12]
The EIA report of the project was approved by MEE in May 2019.[13] It was permitted by NDRC in October 2019, along with a 176-km transporting gas pipeline, and by July 28, 2020, the construction of the first phase of the LNG terminal has begun.[14]
Xintian Green Energy Company intends to issue shares in a non-public offering and raise funds not exceeding 5.11 billion yuan ($785.6 million). More than half of the raised money will be used to support the first and second phases of the LNG terminal project.[15]
According to its EIA report, the project includes 20 storage tanks with 200,000 cubic meters each. The annual circulating capacity will reach 17 million tonnes when all completed. But other news reports show the total capacity is 12 mtpa. [16] Phase I will build one jetty and 4 storage tanks. Phase II will complete another jetty and 8 storage tanks. Extra 8 storage tanks will be added in Phase III.[13]
Phase II reportedly began construction in July 2021.[17]
By January 2023, the construction of phase I and phase II is ongoing.[18]
In August 2023, S&P Global reported that Phase 1 started operations in June 2023.[19][20] Phase II is still under construction. [16]
From the satellite image, 12 storage tanks are visible for two phases. The third phase is also proposed.[21]
The first stage of phase 2 went operating in September 2024, which includes 4 storage tanks (#1, #2, #5, #6)[22][23].
Phase 3 was planned to operate in 2030[24].
On 25 Jul 2025, a news release from the Tangshan Municipal Government indicated that Phase 3 had entered the construction stage.[25]
On 12 Mar 2026, the 2025 Caofeidian District Government Work Report indicated that Phases 2 and 3 were still under construction, with no operations yet commenced. [26]
Articles and Resources
Additional data
To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 https://www.gov.cn/xinwen/2021-07/10/content_5624102.htm.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 http://www.mee.gov.cn/xxgk2018/xxgk/xxgk11/201905/t20190523_703882.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 https://finance.sina.cn/2023-06-26/detail-imyyqpzs4209573.d.html?from=wap.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 4.2 4.3 https://gas.in-en.com/html/gas-3674465.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 5.2 5.3 https://gas.in-en.com/html/gas-3681248.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 6.0 6.1 6.2 https://www.chinaports.com/mobile/news/detail/2553.
{{cite web}}: Missing or empty|title=(help) - ↑ https://tangshan.huanbohainews.com.cn/2020-05/16/content_103217.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 8.0 8.1 https://finance.sina.com.cn/money/future/roll/2024-09-24/doc-incqhchp4528287.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 9.0 9.1 http://www.hbjjrb.com/system/2024/09/30/101386617.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 10.0 10.1 10.2 https://www.qcc.com/firm/754e7615b5e77be4f89b8b1d239b6c5e.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 环渤海地区最大LNG项目落户唐山曹妃甸 总投资达320亿元, Xinhua.net, Jul. 11, 2019
- ↑ "曹妃甸将成为全国LNG接卸能力最大的港口". www.cbmf.org. 2019-11-08. Retrieved 2021-03-31.
{{cite web}}: CS1 maint: url-status (link) - ↑ 13.0 13.1 关于唐山LNG项目环境影响报告书的批复, 生态环境部, May 20, 2019
- ↑ 新天绿能:唐山LNG接收站项目目前第一阶段工程已开工建设 10jqka.com.cn, 07/08/2020
- ↑ 新天绿能募资建设唐山LNG接收站项目 Sohu.com, 12-25-2020
- ↑ 16.0 16.1 "河北曹妃甸新天LNG接收站项目二阶段工程建设稳步推进". h.xinhuaxmt.com. 2023-08-19.
{{cite web}}: CS1 maint: url-status (link) - ↑ "河北曹妃甸新天LNG项目二期工程开工建设 来源: 新华社". http://www.gov.cn/ 中国政府网. 2021-07-10.
{{cite web}}: External link in(help); line feed character in|website=|title=at position 21 (help)CS1 maint: url-status (link) - ↑ "河北曹妃甸新天LNG项目接收站工程建设正酣_图片新闻_中国政府网". www.gov.cn. 2023-01-04.
{{cite web}}: CS1 maint: url-status (link) - ↑ "https://www.spglobal.com/commodityinsights/en/market-insights/latest-news/lng/080823-chinas-zhejiang-energy-receives-first-lng-cargo-at-new-wenzhou-terminal".
{{cite web}}: External link in(help)CS1 maint: url-status (link)|title= - ↑ sina_mobile (2023-06-26). "京津冀腹地大型LNG项目投产 新天绿能天然气业务再上新台阶". finance.sina.cn.
{{cite web}}: CS1 maint: url-status (link) - ↑ "京津冀腹地大型LNG项目投产 新天绿能天然气业务再上新台阶". finance.sina.cn. 2023-06-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "保供减碳底"气"足!河北建投唐山LNG项目迎重要进展_河北经济网". www.hbjjrb.com. 2024-09-30. Retrieved 2025-06-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ "唐山LNG项目接收站二阶段一期(1#、2#、5#、6#储罐)工程顺利投产|LNG_新浪财经_新浪网". finance.sina.com.cn. 2024-09-24. Retrieved 2025-06-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ "京津冀腹地大型LNG项目投产 新天绿能天然气业务再上新台阶_手机新浪网". finance.sina.cn. 2023-06-26. Retrieved 2025-06-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ "唐山曹妃甸新天LNG项目建设稳步推进". 2025-07-25. Retrieved 2026-04-06.
{{cite web}}: CS1 maint: url-status (link) - ↑ "2025年曹妃甸区政府工作报告". 2026-03-12. Retrieved 2026-04-06.
{{cite web}}: CS1 maint: url-status (link)