Guoxin Yangzhou power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Guoxin Yangzhou power station (江苏国信扬州发电厂, 国信扬电三期2×100万千瓦扩建项目) is an operating power station of at least 2460-megawatts (MW) in Yangzhou city, Hanjiang, Yangzhou, Jiangsu, China with multiple units, some of which are not currently operating. It is also known as 扬州第二发电厂.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Guoxin Yangzhou power station | Yangzhou city, Hanjiang, Yangzhou, Jiangsu, China | 32.267778, 119.419444 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6: 32.267778, 119.419444
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| Phase I Unit 1 | Operating | coal: bituminous[2] | 630 | subcritical | – | 1998 | False |
| Phase I Unit 2 | Operating | coal: bituminous[2] | 630 | subcritical | – | 1998 | False |
| Phase II Unit 3 | Operating | coal: bituminous[2] | 600 | supercritical | yes | 2006 | False |
| Phase II Unit 4 | Operating | coal: bituminous[2] | 600 | supercritical | yes | 2007 | False |
| Phase III Unit 5 | Construction[3] | coal: unknown[1][2] | 1000[1] | ultra-supercritical[1] | – | – | False |
| Phase III Unit 6 | Construction[3] | coal: unknown[1][2] | 1000[1] | ultra-supercritical[1] | – | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Jiangsu Guoxin Yangzhou Power Generation Co Ltd [100%][1] | Jiangsu Guoxin Corp Ltd [90.0%]; Taizhou Urban Construction Investment Group Co Ltd [5.0%]; Yangzhou Urban and Rural Construction State-owned Assets Holding (Group) Co Ltd [5.0%] |
| Phase I Unit 2 | Jiangsu Guoxin Yangzhou Power Generation Co Ltd [100%][1] | Jiangsu Guoxin Corp Ltd [90.0%]; Taizhou Urban Construction Investment Group Co Ltd [5.0%]; Yangzhou Urban and Rural Construction State-owned Assets Holding (Group) Co Ltd [5.0%] |
| Phase II Unit 3 | Jiangsu Guoxin Yangzhou Power Generation Co Ltd [100%][1] | Jiangsu Guoxin Corp Ltd [90.0%]; Taizhou Urban Construction Investment Group Co Ltd [5.0%]; Yangzhou Urban and Rural Construction State-owned Assets Holding (Group) Co Ltd [5.0%] |
| Phase II Unit 4 | Jiangsu Guoxin Yangzhou Power Generation Co Ltd [100%][1] | Jiangsu Guoxin Corp Ltd [90.0%]; Taizhou Urban Construction Investment Group Co Ltd [5.0%]; Yangzhou Urban and Rural Construction State-owned Assets Holding (Group) Co Ltd [5.0%] |
| Phase III Unit 5 | Jiangsu Guoxin Yangzhou Power Generation Co Ltd [100%][1] | Jiangsu Guoxin Corp Ltd [90.0%]; Taizhou Urban Construction Investment Group Co Ltd [5.0%]; Yangzhou Urban and Rural Construction State-owned Assets Holding (Group) Co Ltd [5.0%] |
| Phase III Unit 6 | Jiangsu Guoxin Yangzhou Power Generation Co Ltd [100%][1] | Jiangsu Guoxin Corp Ltd [90.0%]; Taizhou Urban Construction Investment Group Co Ltd [5.0%]; Yangzhou Urban and Rural Construction State-owned Assets Holding (Group) Co Ltd [5.0%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): 苏发改能源发〔2025〕594号[1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
Guoxin Yangzhou power station is a four-unit coal-fired power plant with a total capacity of 2,460 MW in Jiangsu Province. The first two units were built in 1998; the second two in 2006 and 2007.[4][5]
Description of Expansion
A third phase of 2 x 1000 MW has been proposed.[6]
However, with no developments since October 2014, the project appears to be shelved.
This 2×1000MW expansion project (Phase III Units 5 & 6) received project approval in June 2025[7] and began construction in December 2025[8].
Significant construction milestones included the natural draft cooling tower foundation pour in March 2026[9] and the #5 boiler beam installation in May 2026[10].
Unit 6 construction progressed with the turbine generator foundation pour in December 2025[11], boiler welding start in May 2026[12], and boiler beam installation in June 2026[13].
Plant Details for Existing Units 1-4
- Sponsor: Jiangsu Guoxin Investment Group
- Location: Bali, Hanjiang District, Yangzhou Prefecture, Jiangsu Province, China
- Coordinates: 32.2677778, 119.4194444 (exact
- Status: Operating
- Gross capacity: 2,640 MW (Units 1 & 2: 630 MW; Units 3 & 4: 600 MW)
- Type: Subcritical (Units 1 & 2); Ultra-supercritical (Units 3 & 4)
- In service: 1998 (Units 1 & 2); 2006-07 (Units 3 & 4)
- Coal type:
- Coal source:
- Source of financing:
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 https://news.bjx.com.cn/html/20250619/1447046.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 https://www.mytaizhou.net/folder1/folder2/folder7/2025-12-13/807444.html.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 https://news.bjx.com.cn/html/20251208/1473492.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "Coal-Fired Plants in China - Jiangsu," Power Plants Around the World, accessed September 2015
- ↑ "Coal-Fired Plants Financed by International Public Investment Institutions Since 1994", Appendix to Foreclosing the Future: Coal, Climate and International Public Finance: Investment in coal-fired power plants hinders the fight against global warming, Environmental Defense, April 2009.
- ↑ "江苏省2014年度火电项目优选评议结果公示(名单)," Polaris power grid News, 2014/10/22
- ↑ "省发展改革委关于同意国信扬电三期2×100万千瓦扩建项目核准的批复". 北极星电力网. 2025-06-19. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信扬电三期2×100万千瓦扩建项目正式开工建设". WeChat. 2025-12-06. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "5号自然通风冷却塔工程环形基础顺利完成浇筑". WeChat. 2026-03-13. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信扬电三期2×100万千瓦扩建项目5号锅炉首件大板梁精准吊装就位". WeChat. 2026-05-23. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信扬电三期2×100万千瓦扩建项目6号汽轮发电机底板基础混凝土浇筑工作圆满完成". WeChat. 2025-12-09. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信扬电三期2×100万千瓦扩建项目6号锅炉受热面首只焊口开始焊接". WeChat. 2026-05-28. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国信扬电三期2×100万千瓦扩建项目6号锅炉首根G3大板梁开始吊装". WeChat. 2026-06-09. Retrieved 2026-07-28.
{{cite web}}: CS1 maint: url-status (link)