Zhenxiong CFB Waste Coal power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Zhenxiong CFB Waste Coal power station (华润昭通镇雄煤电项目) is a permitted power station in Boji, Zhenxiong, Zhaotong, Yunnan, China. It is also known as 昭通市镇雄县超临界CFB煤矸石低热值煤炭综合利用项目, 镇雄2×35万千瓦超临界CFB燃煤发电机组.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Zhenxiong CFB Waste Coal power station | Boji, Zhenxiong, Zhaotong, Yunnan, China | 27.423577, 104.963976 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Permitted[2] | coal: waste coal[2] | 350[1] | supercritical[1] | 2026 (planned)[1] | False |
| Unit 2 | Permitted[2] | coal: waste coal[2] | 350[1] | supercritical[1] | 2026 (planned)[1] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | China Resources Power Investment Co Ltd [100%][1] | China Resources Power Holdings Co Ltd [100.0%] |
| Unit 2 | China Resources Power Investment Co Ltd [100%][1] | China Resources Power Holdings Co Ltd [100.0%] |
Project-level coal details
- Permit(s): 云发改能源〔2024〕253号[2]
Background
Unit 1 was approved in April 2024[3] and listed on Yunnan's key projects list[4]. Survey and design tenders were issued in November 2024[5]. In 2025, main machinery tenders were issued in April[6], and main machinery contracts were awarded later that month[7]. Piling and desulfurization EPC tenders were issued in August[8][9]. In January 2026, the main building A section contract was awarded[10]. In July 2026, a tender for the main installation A section was issued[11].
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://news.bjx.com.cn/html/20250820/1456774.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 "2×350MW!云南镇雄低热值煤炭综合利用项目获核准批复-北极星火力发电网". news.bjx.com.cn. 2024-04-07. Archived from the original on 2024-04-16. Retrieved 2024-04-08.
- ↑ "云南镇雄低热值煤炭综合利用项目核准批复". 北极星电力网. 2024-04-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "云南2024年重点项目名单". 北极星电力网. 2024-04-03. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润电力镇雄2×350MW项目勘察设计招标". 北极星电力网. 2024-11-14. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润镇雄低热值煤炭综合利用项目三大主机招标". 北极星电力网. 2025-04-02. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润镇雄2×350MW项目三大主机中标公示". 北极星电力网. 2025-04-27. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "云南镇雄低热值煤炭综合利用项目桩基工程招标". 北极星电力网. 2025-08-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "华润镇雄项目脱硫EPC招标". 微信公众平台. 2025-08-20. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "浙江省二建中标华润镇雄项目主体建筑A标段". 微信公众平台. 2026-01-15. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link) - ↑ "镇雄低热值煤炭综合利用项目主体安装A标段招标". 北极星电力网. 2026-07-07. Retrieved 2026-07-29.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.