Zhenxiong CFB Waste Coal power station

From Global Energy Monitor
Part of the
Global Coal Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related coal trackers:

Zhenxiong CFB Waste Coal power station (华润昭通镇雄煤电项目) is a permitted power station in Boji, Zhenxiong, Zhaotong, Yunnan, China. It is also known as 昭通市镇雄县超临界CFB煤矸石低热值煤炭综合利用项目, 镇雄2×35万千瓦超临界CFB燃煤发电机组.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhenxiong CFB Waste Coal power station Boji, Zhenxiong, Zhaotong, Yunnan, China 27.423577, 104.963976 (approximate)[1]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Permitted[2] coal: waste coal[2] 350[1] supercritical[1] 2026 (planned)[1] False
Unit 2 Permitted[2] coal: waste coal[2] 350[1] supercritical[1] 2026 (planned)[1] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 China Resources Power Investment Co Ltd [100%][1] China Resources Power Holdings Co Ltd [100.0%]
Unit 2 China Resources Power Investment Co Ltd [100%][1] China Resources Power Holdings Co Ltd [100.0%]

Project-level coal details

  • Permit(s): 云发改能源〔2024〕253号[2]

Background

Unit 1 was approved in April 2024[3] and listed on Yunnan's key projects list[4]. Survey and design tenders were issued in November 2024[5]. In 2025, main machinery tenders were issued in April[6], and main machinery contracts were awarded later that month[7]. Piling and desulfurization EPC tenders were issued in August[8][9]. In January 2026, the main building A section contract was awarded[10]. In July 2026, a tender for the main installation A section was issued[11].

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://news.bjx.com.cn/html/20250820/1456774.shtml. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 "2×350MW!云南镇雄低热值煤炭综合利用项目获核准批复-北极星火力发电网". news.bjx.com.cn. 2024-04-07. Archived from the original on 2024-04-16. Retrieved 2024-04-08.
  3. ↑ "云南镇雄低热值煤炭综合利用项目核准批复". 北极星电力网. 2024-04-07. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  4. ↑ "云南2024年重点项目名单". 北极星电力网. 2024-04-03. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  5. ↑ "华润电力镇雄2×350MW项目勘察设计招标". 北极星电力网. 2024-11-14. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  6. ↑ "华润镇雄低热值煤炭综合利用项目三大主机招标". 北极星电力网. 2025-04-02. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "华润镇雄2×350MW项目三大主机中标公示". 北极星电力网. 2025-04-27. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "云南镇雄低热值煤炭综合利用项目桩基工程招标". 北极星电力网. 2025-08-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "华润镇雄项目脱硫EPC招标". 微信公众平台. 2025-08-20. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "浙江省二建中标华润镇雄项目主体建筑A标段". 微信公众平台. 2026-01-15. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "镇雄低热值煤炭综合利用项目主体安装A标段招标". 北极星电力网. 2026-07-07. Retrieved 2026-07-29.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.