Jinyuan Zhijin power station (国家电投贵州金元织金上大压小异地改建项目) is an operating power station of at least 1320-megawatts (MW) in Zhucang Town, Zhijin, Bijie, Guizhou, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Jinyuan Zhijin power station Zhucang Town, Zhijin, Bijie, Guizhou, China 26.555828, 105.630634 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2: 26.555828, 105.630634

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 1 Operating[2] coal: unknown[3][4] 660[3] ultra-supercritical[3] 2025[2] False
Unit 2 Operating[5] coal: unknown[3][4] 660[3] ultra-supercritical[3] 2025[5] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 1 Guizhou Jinyuan Zhijin Pingyuan Clean Energy Power Generation Co Ltd [100%][3] State Power Investment Corp Ltd [45.6%]; Zhongyi Holdings Ltd [21.0%]; Guizhou Panjiang Investment Holding (Group) Co Ltd [8.6%]; Guiyang Guanshan Lake Zhongyi Energy Management Co Ltd [8.1%]; Guizhou Qiansheng State-Owned Assets Management Co Ltd [7.5%]; Cpi Guizhou Jinyuan Group Co Ltd [4.5%]; Zhongyi Jincaiqian Hong Kong Energy Holdings [3.2%]; unknown [1.4%]
Unit 2 Guizhou Jinyuan Zhijin Pingyuan Clean Energy Power Generation Co Ltd [100%][3] State Power Investment Corp Ltd [45.6%]; Zhongyi Holdings Ltd [21.0%]; Guizhou Panjiang Investment Holding (Group) Co Ltd [8.6%]; Guiyang Guanshan Lake Zhongyi Energy Management Co Ltd [8.1%]; Guizhou Qiansheng State-Owned Assets Management Co Ltd [7.5%]; Cpi Guizhou Jinyuan Group Co Ltd [4.5%]; Zhongyi Jincaiqian Hong Kong Energy Holdings [3.2%]; unknown [1.4%]

Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

First concrete poured on August 23, 2023, marking the official construction start of the SPIC Guizhou Jinyuan Zhijin 2×660MW 'large-to-small' relocation modification project[6]. Major milestones followed quickly, including boiler steel framework installations in late 2023, chimney foundation pours in January 2024, and turbine base concrete casting in June 2024[7][8]. The 240-meter chimney structure and cooling towers were successfully topped out by late 2024, leading to successful boiler hydraulic pressure tests for Unit 1 in December 2024 and Unit 2 in March 2025[9][10].

Following subsequent steam blows, trial whole-set runs, and grid connection tests through early 2025, Unit 1 successfully completed its mandatory 168-hour full-load operational trial run on August 5, 2025[11], and Unit 2 completed its 168-hour full-load run on August 26, 2025, bringing both units into active commercial operation[12].

Articles and Resources

References

  1. ↑ https://mp.weixin.qq.com/s/LUS6oEtjS_umvjw4y06HQg. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://web.archive.org/web/20260416010621/https://news.bjx.com.cn/html/20250806/1454627.shtml. Archived from the original on 2026-04-16. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://news.bjx.com.cn/html/20230824/1327753.shtml. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://news.bjx.com.cn/html/20250827/1458048.shtml. {{cite web}}: Missing or empty |title= (help)
  6. ↑ "2×660MW!国家电投贵州金元织金"上大压小"异地改建项目开工". 北极星电力网. 2023-08-24. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  7. ↑ "国家电投贵州金元织金"上大压小"异地改建项目1号机组锅炉第一根钢架开始吊装". 北极星电力网. 2023-11-09. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  8. ↑ "贵州金元织金"上大压小"2×660MW异地改建项目汽机基座浇筑完成". 微信公众平台. 2024-06-16. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  9. ↑ "贵州金元织金"上大压小"异地改建项目1号冷却塔顺利封顶". 北极星电力网. 2024-11-26. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  10. ↑ "贵州金元织金"上大压小"异地改建项目1号锅炉水压试验一次成功". 北极星电力网. 2024-12-31. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  11. ↑ "国家电投集团贵州金元织金1号火电机组顺利通过168小时满负荷试运行". 北极星电力网. 2025-08-06. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ "贵州金元织金"上大压小"异地改建项目2号机组正式投入商业运行". 新华丝路. 2025-08-26. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)