Zhijin power station is a power station under construction in Zhucang Town, Zhijin, Bijie, Guizhou, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Zhijin power station Zhucang Town, Zhijin, Bijie, Guizhou, China 26.43581, 105.522786 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 2, Unit 1: 26.43581, 105.522786

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
Unit 2 construction coal - unknown 660 ultra-supercritical 2025
Unit 1 construction coal - unknown 660 ultra-supercritical 2024

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 2 Guizhou Jinyuan Zhijin Clean and Efficient Energy Power Generation Co Ltd [100.0%]
Unit 1 Guizhou Jinyuan Zhijin Clean and Efficient Energy Power Generation Co Ltd [100.0%]

Project-level coal details

  • Permit(s): September 2021, November 18, 2020

Background on Project

The 2 x 660 MW coal plant project was one of seven new coal plants listed in Guizhou Province's 14th Energy Development (2021-2025). In all, 25 new coal power projects were planned as of 2021.[1] The proposal was presumed to be a capacity replacement project for Xishui power station.

Unit 1 was permitted in October 2020.[2]

By October 2022, a feasibility study for the units was also completed.[3]

According to the Guizhou Province Coal Power Projects Three-Year Action Plan (2023-2025), construction of the power station started in October 2022.[4] However, the first pot of concrete was only poured into the main structure on 23 August 2023.[5][6][7]

China Energy Engineering Corporation was contracted to take up the project construction.[8][9] The plan stated that Unit 1 of the project was expected to be complete by 2024, and Unit 2 by 2025.[4]

Articles and Resources

References

  1. "贵州省“十四五”规划:平衡水电火电利益关系," 北极星电力网新闻中心, 2021/3/4
  2. "省能源局关于省十三届人大四次会议 第477号建议的答复," 贵州省能源局门户网站, 2021年07月19日
  3. "贵州金元织金“上大压小”异地改建项目(2×660MW)可研报告评审收口会圆满收官," BJX, 2022-10-12
  4. 4.0 4.1 "省能源局关于公开征求《贵州省煤电项目建设三年攻坚行动方案(2023-2025年)》意见的函," Guizhou Energy Administration, 2023-06-02
  5. 贵州金元, 李仲翰 许兵 (2023-08-24). "2×660MW!国家电投贵州金元织金"上大压小"异地改建项目开工". 北极星火电网. Retrieved 2023-8-29. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  6. "贵州首个"煤电联营"项目主体工程正式全面开工". 中能传媒发电报道. 2023-08-24. Retrieved 2023-8-29. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  7. "国家电投2×660MW煤电联营项目开工建设". 电力项目圈. 2023-08-25. Retrieved 2023-8-29. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  8. 华勋超 张媛, 安徽电建二公司 (2023-08-01). "中国能建安徽电建二公司中标贵州织金"上大压小"2×660兆瓦机组工程". 中国能源建设股份有限公司网站. Retrieved 2023-8-29. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  9. "中国能建中标贵州织金"上大压小"2×660兆瓦机组工程". 北极星电力网. 2023-08-01. Retrieved 2023-8-29. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)