Jinyuan Zhijin power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Jinyuan Zhijin power station (国家电投贵州金元织金上大压小异地改建项目) is an operating power station of at least 1320-megawatts (MW) in Zhucang Town, Zhijin, Bijie, Guizhou, China.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Jinyuan Zhijin power station | Zhucang Town, Zhijin, Bijie, Guizhou, China | 26.555828, 105.630634 (exact)[1] |
Unit-level coordinates (WGS 84):
- Unit 1, Unit 2: 26.555828, 105.630634
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Emergency/Backup |
|---|---|---|---|---|---|---|
| Unit 1 | Operating[2] | coal: unknown[3][4] | 660[3] | ultra-supercritical[3] | 2025[2] | False |
| Unit 2 | Operating[5] | coal: unknown[3][4] | 660[3] | ultra-supercritical[3] | 2025[5] | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Guizhou Jinyuan Zhijin Pingyuan Clean Energy Power Generation Co Ltd [100%][3] | State Power Investment Corp Ltd [45.6%]; Zhongyi Holdings Ltd [21.0%]; Guizhou Panjiang Investment Holding (Group) Co Ltd [8.6%]; Guiyang Guanshan Lake Zhongyi Energy Management Co Ltd [8.1%]; Guizhou Qiansheng State-Owned Assets Management Co Ltd [7.5%]; Cpi Guizhou Jinyuan Group Co Ltd [4.5%]; Zhongyi Jincaiqian Hong Kong Energy Holdings [3.2%]; unknown [1.4%] |
| Unit 2 | Guizhou Jinyuan Zhijin Pingyuan Clean Energy Power Generation Co Ltd [100%][3] | State Power Investment Corp Ltd [45.6%]; Zhongyi Holdings Ltd [21.0%]; Guizhou Panjiang Investment Holding (Group) Co Ltd [8.6%]; Guiyang Guanshan Lake Zhongyi Energy Management Co Ltd [8.1%]; Guizhou Qiansheng State-Owned Assets Management Co Ltd [7.5%]; Cpi Guizhou Jinyuan Group Co Ltd [4.5%]; Zhongyi Jincaiqian Hong Kong Energy Holdings [3.2%]; unknown [1.4%] |
Project-level coal details
- Coal source(s): domestic
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
First concrete poured on August 23, 2023, marking the official construction start of the SPIC Guizhou Jinyuan Zhijin 2×660MW 'large-to-small' relocation modification project[6]. Major milestones followed quickly, including boiler steel framework installations in late 2023, chimney foundation pours in January 2024, and turbine base concrete casting in June 2024[7][8]. The 240-meter chimney structure and cooling towers were successfully topped out by late 2024, leading to successful boiler hydraulic pressure tests for Unit 1 in December 2024 and Unit 2 in March 2025[9][10].
Following subsequent steam blows, trial whole-set runs, and grid connection tests through early 2025, Unit 1 successfully completed its mandatory 168-hour full-load operational trial run on August 5, 2025[11], and Unit 2 completed its 168-hour full-load run on August 26, 2025, bringing both units into active commercial operation[12].
Articles and Resources
References
- ↑ https://mp.weixin.qq.com/s/LUS6oEtjS_umvjw4y06HQg.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://web.archive.org/web/20260416010621/https://news.bjx.com.cn/html/20250806/1454627.shtml. Archived from the original on 2026-04-16.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 https://news.bjx.com.cn/html/20230824/1327753.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 5.0 5.1 https://news.bjx.com.cn/html/20250827/1458048.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "2×660MW!国家电投贵州金元织金"上大压小"异地改建项目开工". 北极星电力网. 2023-08-24. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国家电投贵州金元织金"上大压小"异地改建项目1号机组锅炉第一根钢架开始吊装". 北极星电力网. 2023-11-09. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "贵州金元织金"上大压小"2×660MW异地改建项目汽机基座浇筑完成". 微信公众平台. 2024-06-16. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "贵州金元织金"上大压小"异地改建项目1号冷却塔顺利封顶". 北极星电力网. 2024-11-26. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "贵州金元织金"上大压小"异地改建项目1号锅炉水压试验一次成功". 北极星电力网. 2024-12-31. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "国家电投集团贵州金元织金1号火电机组顺利通过168小时满负荷试运行". 北极星电力网. 2025-08-06. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "贵州金元织金"上大压小"异地改建项目2号机组正式投入商业运行". 新华丝路. 2025-08-26. Retrieved 2026-05-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.