Zhijin power station is a power station under construction in Zhucang Town, Zhijin, Bijie, Guizhou, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Zhijin power station | Zhucang Town, Zhijin, Bijie, Guizhou, China | 26.43581, 105.522786 (exact) |
The map below shows the exact location of the power station.
Unit-level coordinates (WGS 84):
- Unit 2, Unit 1: 26.43581, 105.522786
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Unit 2 | construction | coal - unknown | 660 | ultra-supercritical | 2025 | – |
Unit 1 | construction | coal - unknown | 660 | ultra-supercritical | 2024 | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Unit 2 | Guizhou Jinyuan Zhijin Clean and Efficient Energy Power Generation Co Ltd [100.0%] |
Unit 1 | Guizhou Jinyuan Zhijin Clean and Efficient Energy Power Generation Co Ltd [100.0%] |
Project-level coal details
- Permit(s): September 2021, November 18, 2020
Background on Project
The 2 x 660 MW coal plant project was one of seven new coal plants listed in Guizhou Province's 14th Energy Development (2021-2025). In all, 25 new coal power projects were planned as of 2021.[1] The proposal was presumed to be a capacity replacement project for Xishui power station.
Unit 1 was permitted in October 2020.[2]
By October 2022, a feasibility study for the units was also completed.[3]
According to the Guizhou Province Coal Power Projects Three-Year Action Plan (2023-2025), construction of the power station started in October 2022.[4] However, the first pot of concrete was only poured into the main structure on 23 August 2023.[5][6][7]
China Energy Engineering Corporation was contracted to take up the project construction.[8][9] The plan stated that Unit 1 of the project was expected to be complete by 2024, and Unit 2 by 2025.[4]
Articles and Resources
References
- ↑ "贵州省“十四五”规划:平衡水电火电利益关系," 北极星电力网新闻中心, 2021/3/4
- ↑ "省能源局关于省十三届人大四次会议 第477号建议的答复," 贵州省能源局门户网站, 2021年07月19日
- ↑ "贵州金元织金“上大压小”异地改建项目(2×660MW)可研报告评审收口会圆满收官," BJX, 2022-10-12
- ↑ 4.0 4.1 "省能源局关于公开征求《贵州省煤电项目建设三年攻坚行动方案(2023-2025年)》意见的函," Guizhou Energy Administration, 2023-06-02
- ↑ 贵州金元, 李仲翰 许兵 (2023-08-24). "2×660MW!国家电投贵州金元织金"上大压小"异地改建项目开工". 北极星火电网. Retrieved 2023-8-29.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "贵州首个"煤电联营"项目主体工程正式全面开工". 中能传媒发电报道. 2023-08-24. Retrieved 2023-8-29.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "国家电投2×660MW煤电联营项目开工建设". 电力项目圈. 2023-08-25. Retrieved 2023-8-29.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ 华勋超 张媛, 安徽电建二公司 (2023-08-01). "中国能建安徽电建二公司中标贵州织金"上大压小"2×660兆瓦机组工程". 中国能源建设股份有限公司网站. Retrieved 2023-8-29.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "中国能建中标贵州织金"上大压小"2×660兆瓦机组工程". 北极星电力网. 2023-08-01. Retrieved 2023-8-29.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.