Jilin Xinda Iron and Steel Co Ltd (吉林鑫达钢铁有限公司) is a steel plant in Hengdaohe, Dongfeng, Liaoyuan, Jilin, China that operates basic oxygen furnace (BOF) and blast furnace (BF) technology.
Location
The map below shows the exact location of the plant in Hengdaohe, Dongfeng, Liaoyuan, Jilin, China:
Location:
Coordinates (WGS 84 ): 42.3249, 125.246892 (exact)
Background
According to the announcement of the capacity replacement plan in September 2022, the company planned to build a 100-ton basic oxygen furnace to replace two 60-ton basic oxygen furnaces.[ 1]
According to the announcement of the capacity replacement plan in November 2022, the company planned to build a 1350m3 blast furnace to replace a 480m3 blast furnace.[ 2]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
Hengjin Huitong Asset Management (Beijing) Co Ltd [60.0%]; natural person(s) [18.7%]; Jilin Tianpeng Industrial Co Ltd [17.2%]; unknown [4.1%]
unknown [60.0%]; not applicable [18.7%]; unknown [17.2%]; not applicable [4.1%]
E100000123534 [60.0%]; E100000123261 [18.7%]; E100000123535 [17.2%]; E100000132388 [4.1%]
JiLin Province Xinda Steel Co Ltd [100%][ 5]
unknown
E100000123181 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Nominal crude steel capacity (total)
announced
2300[ 7] [ 8]
2300[ 7] [ 8]
operating pre-retirement
3300[ 7] [ 8]
3300[ 7] [ 8]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel
Sinter
Coke
Pellets
NF
NF
NF
NF
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
BOF production
Other/unknown steel production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
BF production
Other/unknown iron production
2019
unknown
unknown
2020
unknown
unknown
2021
unknown
unknown
2022
unknown
unknown
2023
unknown
unknown
2024
unknown
unknown
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Announced date
Start date
Current size
Current capacity (ttpa)
Decarbonization technology
Most recent relining
BF #3
operating[ 12]
–
2013[ 12]
1080.0[ 12]
900[ 11]
–
–
unknown BF (1)
operating[ 13]
–
–
450.0 m3[ 13]
952[ 10]
unknown
–
unknown BF (2)
operating[ 13]
–
–
1260.0 m3[ 13]
1160[ 9]
unknown
2023-06[ 9]
unknown BF (3)
announced[ 9]
2022-11-10[ 9]
–
1350.0 m3[ 9]
1220[ 9]
unknown
–
unknown BF (4)
operating pre-retirement[ 13]
–
–
480.0 m3[ 13]
588[ 9]
unknown
2022-06-27[ 14]
Table 10: Basic Oxygen Furnace Details
Unit name
Status
Announced date
Current capacity (ttpa)
Current size
BOF 1
operating pre-retirement[ 7]
–
1100[ 7]
65.0 tonnes[ 13]
BOF 2
operating pre-retirement[ 8]
–
1100[ 8]
65.0 tonnes[ 13]
BOF 3
operating pre-retirement[ 8]
–
1100[ 8]
65.0 tonnes[ 13]
unknown BOF (1)
announced[ 7]
2022-09-26[ 7]
1150[ 7]
100.0 tonnes[ 7]
unknown BOF (2)
announced[ 8]
2023-03-24[ 8]
1150[ 8]
100.0 tonnes[ 8]