Shandong Guangfu Group Co Ltd (山东广富集团有限公司, 山东广富钢铁有限公司), also known as Shandong Guangfu Iron and Steel Co., Ltd., is a steel plant in Qingyang, Zouping, Binzhou, Shandong, China that operates electric arc furnace (EAF), basic oxygen furnace (BOF), and blast furnace (BF) technology.
Location
The map below shows the exact location of the plant in Qingyang, Zouping, Binzhou, Shandong, China:
Location: Qinglongshan Industrial park
Coordinates (WGS 84 ): 36.863145, 117.616918 (exact)
Background
According to the steel capacity transfer plan of the Shandong Province People's Government, Shandong Guangfu Group Co., Ltd. and another steel plant located in Zouping, Shandong Province (Shandong Chuanyang Group Co., Ltd. ) withdrawed a total of over 10 million tons of iron and steel production capacity by 2022. The two plants dismantled eight blast furnaces, five basic oxygen furnaces and two electric furnaces, equaling 5.69 million tons of ironmaking capacity and 6.66 million tons of steelmaking capacity. [ 1]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker , a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
Start date
Idled date
Retired date
Power source
1983[ 2]
2022[ 3]
2022[ 4]
Coal Power Plant Unit[ 5]
Table 2: Ownership and Parent Company Information
Parent company
Parent company PermID
Parent GEM entity ID
Owner
Owner company PermID
Owner GEM entity ID
natural person(s) [89.3%]; Shandong Chaote High End Equipment Technology Co Ltd [10.7%]
not applicable [89.3%]; unknown [10.7%]
E100000123261 [89.3%]; E100000123774 [10.7%]
Shandong Guangfu Group Co Ltd [100%][ 6]
unknown
E100000122786 [100%]
Table 3: Process and Products
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Basic oxygen furnace steelmaking capacity
Electric arc furnace steelmaking capacity
Nominal crude steel capacity (total)
retired
2850[ 7] [ 3]
1110[ 3]
3960[ 7] [ 3]
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
1 Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Capacity operating status1
Blast furnace capacity
Nominal iron capacity (total)
retired
3500[ 3]
3500[ 3]
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
Ferronickel
Sinter
Coke
Pellets
NF
NF
1900[ 2]
NF
Table 7: Actual Plant-level Crude Steel Production by Year (thousand tonnes per annum)
Year
BOF production
EAF production
Other/unknown steel production
2019
unknown
unknown
unknown
2020
unknown
unknown
unknown
2021
unknown
unknown
unknown
2022
unknown
unknown
unknown
Table 8: Actual Plant-level Crude Iron Production by Year (thousand tonnes per annum)
Year
BF production
DRI production
Other/unknown iron production
2019
unknown
unknown
unknown
2020
unknown
unknown
unknown
2021
unknown
unknown
unknown
2022
unknown
–
unknown
Unit Details
Table 9: Blast Furnace Details
Unit name
Status
Retired date
Current size
Current capacity (ttpa)
Decarbonization technology
unknown BF (1)
retired[ 8]
2022[ 3]
450.0 m3[ 9]
550[ 3]
unknown
unknown BF (2)
retired[ 8]
2022[ 3]
450.0 m3[ 9]
550[ 3]
unknown
unknown BF (3)
retired[ 8]
2022[ 3]
750.0 m3[ 9]
800[ 3]
unknown
unknown BF (4)
retired[ 8]
2022[ 3]
750.0 m3[ 9]
800[ 3]
unknown
unknown BF (5)
retired[ 8]
2022[ 3]
750.0 m3[ 9]
800[ 3]
unknown
Table 10: Electric Arc Furnace Details
Unit name
Status
Retired date
Current capacity (ttpa)
Current size (tonnes)
unknown EAF (1)
retired[ 8]
2022[ 3]
360[ 3]
100.0[ 9]
unknown EAF (2)
retired[ 8]
2022[ 3]
750[ 3]
150.0[ 9]
Table 11: Electric Arc Furnace Feedstock Details
Unit name
Scrap-based
% scrap
% DRI
% HBI
% sponge iron (unknown if DRI or HBI)
% basic/merchant pig iron
% granulated pig iron
% pig iron (unknown if basic/merchant or granulated)
% other iron
unknown EAF (1)
yes[ 10]
>0[ 10]
unknown
unknown
unknown
>0[ 11]
unknown
unknown
unknown
unknown EAF (2)
yes[ 10]
>0[ 10]
unknown
unknown
unknown
>0[ 11]
unknown
unknown
unknown
Table 12: Basic Oxygen Furnace Details
Unit name
Status
Retired date
Current capacity (ttpa)
Current size
unknown BOF (1)
retired[ 8]
2022[ 3]
850[ 3] [ 7]
60.0 tonnes[ 9]
unknown BOF (2)
retired[ 8]
2022[ 3]
1000[ 3] [ 7]
80.0 tonnes[ 9]
unknown BOF (3)
retired[ 8]
2022[ 3]
1000[ 3] [ 7]
80.0 tonnes[ 9]
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
Resources