Changzhou Eastern Special Steel Co., Ltd. (常州东方特钢有限公司), also known as Jiangsu Jinkai Steel Co., Ltd., is a 3600 thousand tonnes per annum (TTPA) blast furnace (BF), basic oxygen furnace (BOF) and electric arc furnace (EAF) steel plant operating in Changzhou, Jiangsu, China.
Location
The map below shows the location of the steel plant in Changzhou, Jiangsu, China.
- Location: No. 5 Dongfang Road, Huangli Town, Wujin District, Changzhou City, Jiangsu Province[1]
- Coordinates (WGS 84): 31.602554, 119.724256 (exact)
Background
As the company failed to pass the preliminary review by Jiangsu Province due to voluntary abandonment of the regulatory announcement, and has now been included in the list of steel companies to be revoked.[2]
According to the capacity replacement plan in December 2019, the company plans to build a 1820m3 blast furnace and two 100-tonne basic oxygen furnaces (BOF).[3]The Environment Impact Assessment report of the project was approved in November 2022.[4]
Plant Details
Table 1: General Plant Details
Plant status | Start date | Workforce size |
---|---|---|
operating[1] | 2010[5] | 2814[1] |
Table 2: Ownership and Parent Company Information
Parent company | Parent company PermID | Owner | Owner company PermID |
---|---|---|---|
Changzhou Dongrun Special Steel Co., Ltd. [90%]; Other [10%][1] | GEM0000303 [90%]; GEM0000000 [10%] | Changzhou Eastern Special Steel Co., Ltd.[1] | GEM0000025 |
Table 3: Process and Products
Steel product category | Steel products | ISO 50001 | Main production equipment | Detailed production equipment |
---|---|---|---|---|
finished rolled[6][5] | bar, continuous casting rounds, T-shaped guide rail steel, H-shaped steel[6][5] | 2020[7] | blast furnace (BF), basic oxygen furnace (BOF) and electric arc furnace (EAF)[5] | 2 BOF (2x80-tonne); 2 EAF (2x50-tonne)[8] |
Table 4: Crude Steel Production Capacities (thousand tonnes per annum):
Basic oxygen furnace steelmaking capacity | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
---|---|---|
>0 TTPA | >0 TTPA | 3600 TTPA[5] |
Table 5: Crude Iron Production Capacities (thousand tonnes per annum):
Blast furnace capacity | Nominal iron capacity (total) |
---|---|
2600 TTPA[5] | 2600 TTPA |
Blast Furnace Details
Table 6: Blast Furnace Details:
Unit name | Status | Current size | Current capacity |
---|---|---|---|
unknown | operating[8] | 550 m³[8] | 867 TTPA[5] |
unknown | operating[8] | 550 m³[8] | 867 TTPA[5] |
unknown | operating[8] | 550 m³[8] | 867 TTPA[5] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker and Global Blast Furnace Tracker on the Global Energy Monitor website.
- ↑ 1.0 1.1 1.2 1.3 1.4 https://www.qcc.com/firm/12bb8671b6189fe3be58819928b20610.html.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 全国规范钢铁企业拟增至263家(附全名单及其装备), 北极星大气网, Retrieved on: Jul. 16, 2020
- ↑ 关于常州东方特钢有限公司产能置换方案的公告,江苏省工业和信息化厅,December 25, 2019
- ↑ "江苏省生态环境厅 建设项目(核与辐射除外)环评 省生态环境厅关于常州东方特钢有限公司炼铁、炼钢减量置换升级改造项目环境影响报告书的批复". sthjt.jiangsu.gov.cn. 2022-11-25. Retrieved 2023-01-03.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 https://web.archive.org/web/20220113211259/http://www.czdftg.com/jieshao/qiyejianjie/. Archived from the original on 2022-01-13.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 https://web.archive.org/web/20220126183455/http://www.czdftg.com/chanpinfuwu/zx/. Archived from the original on 2022-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20220319200042/http://www.czdftg.com/zizhi/2017/606.html. Archived from the original on 2022-03-19.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 8.0 8.1 8.2 8.3 8.4 8.5 8.6 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;https://www.primetals.com/cn/%E6%96%B0%E9%97%BB%E6%8A%A5%E9%81%93/%E6%96%B0%E9%97%BB/primetals-technologies-completes-first-ultra-low-emission-technology-project-for-bof-off-gas-at-changzhou-eastran.
{{cite web}}
: Missing or empty|title=
(help)