Location

The map below shows the exact location of the plant in Xinyu, Jiangxi, China:

Loading map...
  • Location: Yejin Road, Yushui District, Xinyu City, Jiangxi Province
  • Coordinates (WGS 84): 27.786859, 114.921595 (exact)

Background

The plant's parent company, Jiangxi Foreign Trade Asset Operation Co., Ltd., is 100% owned by Jiangxi Province State-owned Assets Supervision and Administration Commission.

According to the announcement of the capacity replacement plan, the company plans to build a 130-ton electric arc furnace, which is expected to be put into operation in 2024.[1]According to the capacity replacement plan announced on February 10, 2023, the company plans to build two blast furnaces of 2610 cubic meters, which are expected to be put into operation in December 2025.[2]

Plant Details

Table 1: General Plant Details

Phase Plant status Announced date Construction date Start date Pre-retirement announcement date Workforce size
Main plant Operating[3] 1958[4] 25578[3]
Closure Operating pre-retirement[5] 2021-11-26[5]
Expansion Construction[6] 2021-11-26[5] 2022-05-18[7]
Closure Operating pre-retirement[8] 2023-02-10[8]
Expansion Announced[8] 2023-02-10[8] 2023-09[8] 2025[8]

Table 2: Ownership and Parent Company Information

Phase Parent company Parent company GEM ID Owner Owner company PermID Owner company GEM ID
Main plant Xinyu Iron & Steel Corporation Ltd [100%] E100001000472 [51%]; E100000125595 [44.1%]; E100000125779 [4.9%] Xinyu Iron and Steel Group Co., Ltd.[3] 5000069709 E100000123215

Table 3: Process and Products

Phase Steel product category Steel products Steel sector end users ISO 14001 Main production equipment Detailed production equipment
Main plant finished rolled[9] cold and hot rolled thin plates, medium plates, thick plates, and extra thick plates[9] building and infrastructure; energy; transport[4] 2022[10] BF, BOF[11] 5 BOF (3x100-tonne, 2x210-tonne); 2 EAF (2x50 tonne EAF); sinter plant(360m2)[12]
Closure finished rolled[9] cold and hot rolled thin plates, medium plates, thick plates, and extra thick plates[9] building and infrastructure; energy; transport[4] EAF[5] 2 EAF (2x50-tonne)[5]
Expansion finished rolled[9] cold and hot rolled thin plates, medium plates, thick plates, and extra thick plates[9] building and infrastructure; energy; transport[4] EAF[5] 1 EAF (1x130-tonne)[5]
Closure finished rolled[9] cold and hot rolled thin plates, medium plates, thick plates, and extra thick plates[9] building and infrastructure; energy; transport[4] BF[8] [8]
Expansion finished rolled[9] cold and hot rolled thin plates, medium plates, thick plates, and extra thick plates[9] building and infrastructure; energy; transport[4] BF[8] [8]

Table 4: Crude Steel Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Basic oxygen furnace steelmaking capacity Electric arc furnace steelmaking capacity Nominal crude steel capacity (total)
Main plant operating 10001 TTPA[13][13][13][13][13] 10001 TTPA[13][13][13][13][13]
Closure operating pre-retirement 1000 TTPA[5][5] 1000 TTPA[5][5]
Expansion construction 1000 TTPA[5] 1000 TTPA[5]
Closure operating pre-retirement
Expansion announced

Table 5: Crude Iron Production Capacities (thousand tonnes per annum)

*Please see our Frequently Asked Questions page for an explanation of the different capacity operating statuses.
Phase Capacity operating status* Blast furnace capacity Nominal iron capacity (total)
Main plant operating 4200 TTPA[14][14] 4200 TTPA[14][14]
Closure operating pre-retirement
Expansion construction
Closure operating pre-retirement 4800 TTPA[8][8][8][8] 4800 TTPA[8][8][8][8]
Expansion announced 4364 TTPA[8][8] 4364 TTPA[8][8]

Table 6: Actual Crude Steel Production by Year (thousand tonnes per annum)

Year BOF Production Total (all routes)
2020 9886 TTPA[15] 9886 TTPA[15]
2021 [16] [16]
2022

Table 7: Actual Crude Iron Production by Year (thousand tonnes per annum)

Year BF Production Total (all routes)
2020 9117 TTPA[15] 9117 TTPA[15]
2021 [16] [17]
2022

Blast Furnace Details

Table 8: Blast Furnace Details

Unit name Status Announced date Construction date Start date Retired date Current size Current capacity (ttpa) Decarbonization technology Most recent relining
10 operating[18] unknown unknown 2009-11-09 00:00:00[19] 2500 m³[12] 2100[14] unknown unknown
6 operating pre-retirement[8] unknown unknown 2005-11-25 00:00:00[20] 2025[8] 1235 m³[8] 1144[8] unknown unknown
7 operating pre-retirement[8] unknown unknown 2004-08-31 00:00:00[20] 2025[8] 1253 m³[8] 1153[8] unknown unknown
8 operating pre-retirement[8] unknown unknown 2003-05-02 00:00:00[20] 2025[8] 1311 m³[8] 1197[8] unknown unknown
9 operating[21] unknown unknown 2009-02-16 00:00:00[22] 2500 m³[12] 2100[14] unknown 2022-01-15[23]
unknown announced[8] 2023-02-10[8] unknown 2025-12-01 00:00:00[24] 2610 m³[8] 2182[8] unknown unknown
unknown announced[8] 2023-02-10[8] unknown 2025-12-01 00:00:00[24] 2610 m³[8] 2182[8] unknown unknown
unknown operating pre-retirement[8] unknown unknown unknown 2025[8] 1468 m³[8] 1306[8] unknown unknown

Articles and Resources

Additional data

To access additional data, including an interactive map of steel power plants, a downloadable dataset, and summary data, please visit the Global Steel Plant Tracker on the Global Energy Monitor website.

References

  1. 新余钢铁集团有限公司电弧炉节能环保升级改造项目产能置换方案,江西省工业和信息化厅,December 22, 2021
  2. 新余钢铁集团铁前系统超低排放改造项目产能置换方案公示, 江西省工业和信息化厅, 2023-2-10
  3. 3.0 3.1 3.2 https://www.qcc.com/firm/6c59b9344c0660fe1bfeb970efc54cdd.html. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 4.5 https://web.archive.org/web/20220126160007/https://www.xinsteel.com.cn/portal/about_us/about_us_brief.jsp?me_tag. Archived from the original on 26 January 2022. {{cite web}}: Missing or empty |title= (help)
  5. 5.00 5.01 5.02 5.03 5.04 5.05 5.06 5.07 5.08 5.09 5.10 5.11 5.12 https://factory.mysteel.com/21/1126/11/246794795D0DB2A0.html. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20240122222754/https://mp.weixin.qq.com/s?__biz=MzU5MTMwNTM5Mw==&mid=2247513288&idx=8&sn=1d58b340b8516b494fa9e001cea75eec&chksm=fe33fb16c944720070cb192364dd1a3953e2c4ea076146c9c9833ebabf4cd0320d3d13615bb5&scene=27. Archived from the original on 22 January 2024. {{cite web}}: Missing or empty |title= (help)
  7. https://finance.sina.com.cn/money/future/indu/2022-05-19/doc-imcwipik0696494.shtml. {{cite web}}: Missing or empty |title= (help)
  8. 8.00 8.01 8.02 8.03 8.04 8.05 8.06 8.07 8.08 8.09 8.10 8.11 8.12 8.13 8.14 8.15 8.16 8.17 8.18 8.19 8.20 8.21 8.22 8.23 8.24 8.25 8.26 8.27 8.28 8.29 8.30 8.31 8.32 8.33 8.34 8.35 8.36 8.37 8.38 8.39 8.40 8.41 8.42 8.43 8.44 8.45 https://web.archive.org/web/20240119025449/https://m.mysteel.com/23/0213/14/9271779E15AD6F7F_abc.html. Archived from the original on 19 January 2024. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 9.8 9.9 https://web.archive.org/web/20220127101251/https://www.thepaper.cn/newsDetail_forward_4200123. Archived from the original on 27 January 2022. {{cite web}}: Missing or empty |title= (help)
  10. http://cx.cnca.cn/CertECloud/result/skipResultList?certNumber=&orgName=%E6%96%B0%E4%BD%99%E9%92%A2%E9%93%81%E9%9B%86%E5%9B%A2%E6%9C%89%E9%99%90%E5%85%AC%E5%8F%B8&fromIndex=true. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20220207192044/https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml. Archived from the original on 07 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. 12.0 12.1 12.2 https://finance.sina.com.cn/money/future/indu/2020-03-02/doc-iimxxstf5776330.shtml;http://www.cslpc.org/News/Details/4/10523. {{cite web}}: Missing or empty |title= (help)
  13. 13.0 13.1 13.2 13.3 13.4 13.5 13.6 13.7 13.8 13.9 http://www.cslpc.org/News/Details/4/10523. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 14.2 14.3 14.4 14.5 https://www.zhangqiaokeyan.com/academic-journal-cn_ironmaking_thesis/0201295951620.html. {{cite web}}: Missing or empty |title= (help)
  15. 15.0 15.1 15.2 15.3 https://www.chyxx.com/shuju/202103/939673.html. {{cite web}}: Missing or empty |title= (help)
  16. 16.0 16.1 16.2 https://www.chyxx.com/shuju/202107/965050.html. {{cite web}}: Missing or empty |title= (help)
  17. https://www.chyxx.com/shuju/202107/965050.htmll. {{cite web}}: Missing or empty |title= (help)
  18. http://www.csteelnews.com/qypd/gl/202301/t20230116_70715.html. {{cite web}}: Missing or empty |title= (help)
  19. https://www.doc88.com/p-94059719734954.html. {{cite web}}: Missing or empty |title= (help)
  20. 20.0 20.1 20.2 https://www.doc88.com/p-11746971267.html. {{cite web}}: Missing or empty |title= (help)
  21. http://xinyu.gov.cn/xinyu/xyyw/2021-08/30/content_c2f028d1bfde405586c2b97752826875.shtml. {{cite web}}: Missing or empty |title= (help)
  22. https://www.doc88.com/p-9032396608908.html. {{cite web}}: Missing or empty |title= (help)
  23. https://baijiahao.baidu.com/s?id=1718114030248464217&wfr=spider&for=pc. {{cite web}}: Missing or empty |title= (help)
  24. 24.0 24.1 https://www.steelorbis.com/steel-news/latest-news/xinyu-steel-plans-to-newly-build-two-2610-cubic-meters-bfs-1282951.htm. {{cite web}}: Missing or empty |title= (help)

Resources