2W Permian Solar Project Hybrid

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Eunice Permian solar farm

2W Permian Solar Project Hybrid is an operating solar farm in Andrews, Andrews County, Texas, United States.


Project Details

Table 1: Phase-level project details for 2W Permian Solar Project Hybrid

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2021[2] 420 MWac[2] PV[2] Ørsted A/S[1] Ørsted A/S[1]

Read more about solar capacity ratings.


Location

Table 2: Phase-level location details for 2W Permian Solar Project Hybrid

Location Coordinates (WGS 84)
Andrews, Andrews County, Texas, United States[3] 32.1164, -102.5283 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 "Ørsted Completes Permian Energy Center". Orsted. Archived from the original on November 8, 2021. Retrieved February 14, 2022.
  2. 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  3. "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.