ABC Hybrid SECI III wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

ABC Hybrid SECI III wind farm is a wind farm in pre-construction in Neemba, Jaisalmer, Rajasthan, India.

Project Details

Table 1: Phase-level project details for ABC Hybrid SECI III wind farm

Status Nameplate capacity Type Owner
Pre-construction[1] 190 MW[1] Onshore[2] ABC Renewable Energy[1][3]

Location

Table 2: Phase-level location details for ABC Hybrid SECI III wind farm

Location Coordinates (WGS 84)
Neemba, Jaisalmer, Rajasthan, India[4] 13.7899, 75.7457 (approximate)[1][3]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://www.seci.co.in/upload/Bidder/637505570251415734.pdf. {{cite web}}: Missing or empty |title= (help)
  2. (PDF) https://www.seci.co.in/Upload/Tender/SECI000016-2457337-RfS_ISTSWind-SolarHybridPowerDevelopers_1200MWT-III_finalupload.pdf. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.eqmagpro.com/abc-renewable-energy-signs-ppa-for-380-mw-solar-wind-hybrid-power-project-with-seci/. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://cea.nic.in/wp-content/uploads/rpm_division/2023/05/Report_on_Under_Construction_Renewable_Energy_Projects_March_2023.pdf. {{cite web}}: Missing or empty |title= (help)