Abasto II power station (Central térmica Abasto II) is a cancelled power station in Abasto, Buenos Aires, Argentina.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Abasto II power station | Abasto, Buenos Aires, Argentina | -34.980208, -58.143314 (approximate)[1][2] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Emergency/Backup |
|---|---|---|---|---|---|
| 1 | Cancelled - inferred 4 y[2][3][4][5][6][7][1][8][9] | fossil gas: natural gas[10] | 208[1][11] | gas turbine[1][12] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | MSU Energy SA [100%][1][11] | MSU Energy Holding Ltd [75.3%]; unknown [24.7%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The Abasto II power station was one of 29 new power plant projects totalling 3340 MW approved as part of Argentina's TERCONF program in November 2023 under the government of Alberto Fernández.[13][14] However, on July 8, 2024 the entire TerCONF block of projects was shelved, when Argentina's Secretary of Energy issued resolution 151 / 2024 under the new government of President Javier Milei.[15][16] As of July 2026, two years had passed without further news, and the project was presumed to be cancelled.
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://servicios.infoleg.gob.ar/infolegInternet/anexos/390000-394999/393946/res961-1.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://www.dataclave.com.ar/en-general/vecinos-denuncian-que-una-planta-termoelectrica-en-brandsen-pone-en-peligro-la-salud-y-el-agua_a67e9cb46d6039223b5833e1c.
{{cite web}}: Missing or empty|title=(help) - ↑ https://eleditorplatense.com/la-region/brandsen-la-empresa-que-busca-instalar-una-termoelectrica-ruta-2-tuvo-que-cerrar-una-planta-pilar-n5357291.
{{cite web}}: Missing or empty|title=(help) - ↑ "Termoeléctricas: rechazaron el proyecto de cambio de uso del suelo y no se instalarán en Brandsen". 0221. 2025-04-22. Archived from the original on 2025-10-16.
- ↑ "Sobre el final de su gestión, Royón adjudicó la construcción de nuevas centrales térmicas por 3.340 MW". EconoJournal. 2023-11-29. Archived from the original on 2024-05-16. Retrieved 2024-05-14.
- ↑ https://mase.lmneuquen.com/energia/cammesa-ya-piensa-el-proximo-verano-y-arma-un-plan-evitar-cortes-n1177406.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.argentina.gob.ar/normativa/nacional/resoluci%C3%B3n-151-2024-401341/texto.
{{cite web}}: Missing or empty|title=(help) - ↑ "TerConf: darán de baja una licitación millonaria adjudicada en el gobierno anterior para ampliar la generación eléctrica del país". EconoJournal. 2024-07-08. Archived from the original on 2025-01-31. Retrieved 2024-10-08.
- ↑ https://www.eldestapeweb.com/energia/energia/ghioni-sobre-el-modelo-vaca-muerta-exportar-y-energia-barata-para-la-industria--2025460517.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://www.argentina.gob.ar/sites/default/files/infoleg/res851-1-392081.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 "Memoria / Informe Contable 2023" (PDF). Compañía de Transporte de Energía Eléctrica en Alta Tensión Transener S.A. 2024-03-04. Archived from the original (PDF) on 2024-05-17.
- ↑ "Sumarán más de 3.300 MW de producción eléctrica". Desarrollo Energético. 2023-11-29. Archived from the original on 2024-05-16. Retrieved 2024-05-14.
- ↑ "Sobre el final de su gestión, Royón adjudicó la construcción de nuevas centrales térmicas por 3.340 MW". Econojournal. 2023-11-29. Retrieved 2026-08-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Anexo I: Proyectos Adjudicados en el Renglón 1 según Subreglones" (PDF). República Argentina - Poder Ejecutivo Nacional. 2023-11-10.
{{cite web}}: CS1 maint: url-status (link) - ↑ "TerConf: darán de baja una licitación millonaria adjudicada en el gobierno anterior para ampliar la generación eléctrica del país". Econojournal. 2024-07-08. Retrieved 2026-08-26.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Resolución 151/2024". Secretaría de Energía. 2024-07-08.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.