Abasto I power station (Central térmica Abasto I) is a cancelled power station in Abasto, Buenos Aires, Argentina.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Abasto I power station Abasto, Buenos Aires, Argentina -34.967513, -58.149968 (approximate)[1][2]
Loading map...

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Emergency/Backup
1 Cancelled - inferred 4 y[2][3][4][5][6][7][1][8][9] fossil gas: natural gas[10] 242[1][11] gas turbine[1][12] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 SCC Power PLC [100%][1][11] Scc Power Parent Ltd [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

The Abasto I power station was one of 29 new power plant projects totalling 3340 MW approved as part of Argentina's TERCONF program in November 2023 under the government of Alberto Fernández.[13][14] However, on July 8, 2024 the entire TerCONF block of projects was shelved, when Argentina's Secretary of Energy issued resolution 151 / 2024 under the new government of President Javier Milei.[15][16] As of July 2026, two years had passed without further news, and the project was presumed to be cancelled.

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 (PDF) https://servicios.infoleg.gob.ar/infolegInternet/anexos/390000-394999/393946/res961-1.pdf. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://www.dataclave.com.ar/en-general/vecinos-denuncian-que-una-planta-termoelectrica-en-brandsen-pone-en-peligro-la-salud-y-el-agua_a67e9cb46d6039223b5833e1c. {{cite web}}: Missing or empty |title= (help)
  3. ↑ https://eleditorplatense.com/la-region/brandsen-la-empresa-que-busca-instalar-una-termoelectrica-ruta-2-tuvo-que-cerrar-una-planta-pilar-n5357291. {{cite web}}: Missing or empty |title= (help)
  4. ↑ "Termoeléctricas: rechazaron el proyecto de cambio de uso del suelo y no se instalarán en Brandsen". 0221. 2025-04-22. Archived from the original on 2025-10-16.
  5. ↑ https://mase.lmneuquen.com/energia/cammesa-ya-piensa-el-proximo-verano-y-arma-un-plan-evitar-cortes-n1177406. {{cite web}}: Missing or empty |title= (help)
  6. ↑ "Sobre el final de su gestión, Royón adjudicó la construcción de nuevas centrales térmicas por 3.340 MW". EconoJournal. 2023-11-29. Archived from the original on 2024-05-16. Retrieved 2024-05-14.
  7. ↑ https://www.argentina.gob.ar/normativa/nacional/resoluci%C3%B3n-151-2024-401341/texto. {{cite web}}: Missing or empty |title= (help)
  8. ↑ "TerConf: darán de baja una licitación millonaria adjudicada en el gobierno anterior para ampliar la generación eléctrica del país". EconoJournal. 2024-07-08. Archived from the original on 2025-01-31. Retrieved 2024-10-08.
  9. ↑ https://www.eldestapeweb.com/energia/energia/ghioni-sobre-el-modelo-vaca-muerta-exportar-y-energia-barata-para-la-industria--2025460517. {{cite web}}: Missing or empty |title= (help)
  10. ↑ (PDF) https://www.argentina.gob.ar/sites/default/files/infoleg/res851-1-392081.pdf. {{cite web}}: Missing or empty |title= (help)
  11. ↑ 11.0 11.1 "Memoria / Informe Contable 2023" (PDF). Compañía de Transporte de Energía Eléctrica en Alta Tensión Transener S.A. 2024-03-04. Archived from the original (PDF) on 2024-05-17.
  12. ↑ "Sumarán más de 3.300 MW de producción eléctrica". Desarrollo Energético. 2023-11-29. Archived from the original on 2024-05-16. Retrieved 2024-05-14.
  13. ↑ "Sobre el final de su gestión, Royón adjudicó la construcción de nuevas centrales térmicas por 3.340 MW". Econojournal. 2023-11-29. Retrieved 2026-08-26.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "Anexo I: Proyectos Adjudicados en el Renglón 1 según Subreglones" (PDF). República Argentina - Poder Ejecutivo Nacional. 2023-11-10.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "TerConf: darán de baja una licitación millonaria adjudicada en el gobierno anterior para ampliar la generación eléctrica del país". Econojournal. 2024-07-08. Retrieved 2026-08-26.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "Resolución 151/2024". Secretaría de Energía. 2024-07-08.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.