Abra De Ilog Wind Power Project

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Abra De Ilog Wind Power Project is a wind farm in pre-construction in Occidental Mindoro Province, Philippines.


Project Details

Table 1: Phase-level project details for Abra De Ilog Wind Power Project

Phase name Status Nameplate capacity Mount type Operator
1 Pre-construction[1][2] 40 MW[1][2] Onshore Alterenergy Abra De Ilog Wind CORP[3][1][2]


Location

Table 2: Phase-level location details for Abra De Ilog Wind Power Project

Phase name Location Coordinates (WGS 84)
1 Occidental Mindoro Province, Philippines[1][2] 13.3636, 120.7576 (exact)[1][2]

The map below shows the exact location of the wind farm phase:

Loading map...


Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.alternergy.com/abra-de-ilog-wind. Archived from the original on June 24, 2022. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 (PDF) https://www.doe.gov.ph/sites/default/files/pdf/renewable_energy/awarded_wind_2021-03-31.pdf?withshield=1. Archived (PDF) from the original on April 05, 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  3. "eiais.emb.gov.ph/internal/Secured/Uploads/ECC/e2abc715-45ad-47f3-9aa9-a8412ffa10dc.pdf" (PDF). Archived from the original (PDF) on August 16, 2021. Retrieved August 26, 2021.