Achlada solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Achlada solar farm (Αχλαδα 1) is a solar photovoltaic (PV) farm in pre-construction in Meliti Municipal Unit, Florina Regional Unit, Epirus and Western Macedonia, Greece.
Project Details
Table 1: Phase-level project details for Achlada solar farm
| Status | Nameplate capacity | Technology | Owner |
|---|---|---|---|
| Pre-construction[1] | 33 MWp/dc[1] | PV[1] | Menton Energy [100%] (Αμυνταιο Φ.Β Παρκο Πεντε Μονοπροσωπη Α.Ε.)[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Achlada solar farm
| Location | Coordinates (WGS 84) |
|---|---|
| Meliti Municipal Unit, Florina Regional Unit, Florina Regional Unit, Epirus and Western Macedonia, Greece[1] | 40.8811, 21.6306 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 2024-01-26.
{{cite web}}: Missing or empty|title=(help) - ↑ https://renews.biz/83404/rwe-ppc-reach-fid-on-175mw-of-greek-solar/ https://geo.rae.gr/, https://renews.biz/83404/rwe-ppc-reach-fid-on-175mw-of-greek-solar/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
