Achladochori solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Achladochori solar farm (Αχλαδοχωρι) is a solar photovoltaic (PV) farm in pre-construction in Serres Regional Unit, Macedonia and Thrace, Greece.
Project Details
Table 1: Phase-level project details for Achladochori solar farm
| Phase name | Status | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|
| 1 | Pre-construction[1] | 45.1 MWp/dc[1] | PV[1] | Ilios Serron SA [100%] (Ηλιος Σερρων Μονοπροσωπη Ανωνυμη Εταιρεια)[1] |
| 2 | Pre-construction[1] | 60 MWp/dc[1] | PV[1] | Ilios Serron SA [100%] (Ηλιος Σερρων Μονοπροσωπη Ανωνυμη Εταιρεια)[1] |
| 3 | Pre-construction[1] | 45.1 MWp/dc[1] | PV[1] | Ilios Serron SA [100%] (Ηλιος Σερρων Μονοπροσωπη Ανωνυμη Εταιρεια)[1] |
| 4 | Pre-construction[1] | 84 MWp/dc[1] | PV[1] | Ilios Serron SA [100%] (Ηλιος Σερρων Μονοπροσωπη Ανωνυμη Εταιρεια)[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Achladochori solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Serres Regional Unit, Serres Regional Unit, Macedonia and Thrace, Greece[1] | 41.3549, 23.5234 (exact)[1] |
| 2 | Serres Regional Unit, Serres Regional Unit, Macedonia and Thrace, Greece[1] | 41.3115, 23.4454 (exact)[1] |
| 3 | Serres Regional Unit, Serres Regional Unit, Macedonia and Thrace, Greece[1] | 41.3170, 23.4584 (exact)[1] |
| 4 | Dimotiki Enotita Agkistroy, Serres Regional Unit, Serres Regional Unit, Macedonia and Thrace, Greece[1] | 41.3404, 23.5094 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
