Adani Chapar power station is a power station in the pre-permit stage in Chapar, Dhubri, Assam, India.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Adani Chapar power station | Chapar, Dhubri, Assam, India | 26.2314806, 90.3041611 (approximate)[1] |
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
|---|---|---|---|---|
| Unit 1 | Pre-construction[2] | coal: unknown[1] | 800[1] | ultra-supercritical[1] |
| Unit 2 | Pre-construction[2] | coal: unknown[1] | 800[1] | ultra-supercritical[1] |
| Unit 3 | Pre-construction[2] | coal: unknown[1] | 800[1] | ultra-supercritical[1] |
| Unit 4 | Pre-construction[2] | coal: unknown[1] | 800[1] | ultra-supercritical[1] |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Unit 1 | Adani Power Ltd [100%][3] | Adani Power Ltd [100.0%] |
| Unit 2 | Adani Power Ltd [100%][3] | Adani Power Ltd [100.0%] |
| Unit 3 | Adani Power Ltd [100%][3] | Adani Power Ltd [100.0%] |
| Unit 4 | Adani Power Ltd [100%][3] | Adani Power Ltd [100.0%] |
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
As of November 2025, Adani Power Limited (APL) was reportedly proposing to build a 3,200 MW coal-fired power station in Assam state. APL was expected to invest US$5.2 billion in the project.[4]
In early December 2025, Adani Power sought fresh Terms of Reference (ToR) for the proposed 4 x 800 MW ultra-supercritical coal power station in Chapar, in the Dhubri district of Assam.[5] In late December 2025, the Ministry of Environment, Forest and Climate Change Expert Appraisal Committee (EAC) recommended the grant of ToR for the proposed project.[6]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 https://parivesh.nic.in/newupgrade/#/report/ec?proposalId=863308578&legacyApplicationId=0.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 (PDF) https://parivesh.nic.in/utildoc/1213242088_1767372079816.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://www.argusmedia.com/en/news-and-insights/latest-market-news/2754714-india-s-adani-to-set-up-3.2gw-coal-fired-capacity.
{{cite web}}: Missing or empty|title=(help) - ↑ “India’s Adani to set up 3.2GW coal-fired capacity,” Argus Media, November 16, 2025
- ↑ Common Application Form, Fresh ToR - “Proposed 3200 MW Coal Based Ultra Super Critical Thermal Power Project at Villages Charuabakhra, Chirakuta I & II, Santoshpur, Revenue Circle Chapar, District Dhubri, Assam by Adani Power Limited,” Adani Power Ltd. via Parivesh Portal, December 9, 2025
- ↑ “Minutes of …35th Meeting of the Expert Appraisal Committee (EAC) (Thermal Power Projects) to be held on 24th December, 2025,” Ministry of Environment, Forest and Climate Change, January 2, 2026
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.