Aden power station
From Global Energy Monitor
Part of the Global Gas Plant Tracker, a Global Energy Monitor project. |
Related categories: |
Aden power station (محطة الرئيس ، محطة كهرباء عدن الجديدة) is a 132-megawatt (MW) operating gas-fired power station in Aden, Aden, Yemen.
Project Details
Table 1: Unit-level details for Aden power station
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP[1] | Start year | Retired year |
---|---|---|---|---|---|---|---|
1-1 | operating[2][3] | gas[2] | 132 MW | gas turbine[2][4] | not found | 2021[5] | – |
1-2 | construction[2][3][6] | gas[2][4] | 132 MW | gas turbine[2][4] | not found | 2022 (planned)[5] | – |
2 | announced[7][6] | gas[7][4] | 236 MW | gas turbine[7][4] | not found | not found | – |
Table 2: Unit-level ownership details for Aden power station
Unit name | Operator | Owner | Parent |
---|---|---|---|
1-1 | – | Masila Petroleum Exploration and Production Co.[100.0%][8] | Masila Petroleum Exploration and Production Co.[100.0%][8] |
1-2 | – | Masila Petroleum Exploration and Production Co.[100.0%][8] | Masila Petroleum Exploration and Production Co.[100.0%][8] |
2 | – | Masila Petroleum Exploration and Production Co.[100.0%][8] | Masila Petroleum Exploration and Production Co.[100.0%][8] |
Plant-level captive use details for Aden power station power station
Location
Table 3: Plant-level location details for Aden power station
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Aden power station | Aden, Aden, Yemen | 12.8247, 44.9190 (exact)[10] |
The map below shows the exact location of the power station.
Articles and Resources
Additional data
To access additional data, including an interactive map of gas-fired power plants, a downloadable dataset, and summary data, please visit the Global Gas Plant Tracker on the Global Energy Monitor website.
References
- ↑ CHP = Combined Heat and Power
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 "www.pesco-int.com/assets/PESCO_Presentation.pdf" (PDF). Archived (PDF) from the original on January 19, 2022. Retrieved January 21, 2022.
- ↑ 3.0 3.1 "www.theigc.org/wp-content/uploads/2021/11/Improving-electricity-services-in-Yemen_Final-report.pdf" (PDF). Archived (PDF) from the original on November 25, 2021. Retrieved January 21, 2022.
- ↑ 4.0 4.1 4.2 4.3 4.4 "moee-ye.com/site-ar/%d8%a7%d9%84%d9%85%d8%b4%d8%a7%d8%b1%d9%8a%d8%b9/". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ 5.0 5.1 "نجاح التشغيل التجريبي لكهرباء الرئيس بالعاصمة عدن". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
{{cite web}}
: zero width space character in|title=
at position 1 (help) - ↑ 6.0 6.1 http://albaud4.net/news/15126.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 "The President's power station.. good news dispels the darkness of Aden ". Archived from the original on July 9, 2022. Retrieved July 11, 2022.
- ↑ 8.0 8.1 8.2 8.3 8.4 8.5 "PetroMasila and GE sign pact for 2 power projects in Aden and Hadramout". en.adenpress.news. Retrieved January 20, 2022.
{{cite web}}
: CS1 maint: url-status (link) - ↑ 9.0 9.1 Cite error: Invalid
<ref>
tag; no text was provided for refs namedref_7
- ↑ https://www.google.com/maps/place/PETROMASILA+ADEN+Power+Plant-PESCO/@12.824856,44.9166025,17z/data=!3m1!4b1!4m5!3m4!1s0x161e1b3dae7e6233:0x93e130556b91a1c7!8m2!3d12.824856!4d44.9187912?hl=en.
{{cite web}}
: Missing or empty|title=
(help)