Aes Solar 3
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Parque Solar Girasoles - AES Solar 3
Aes Solar 3 (AES Solar 3) is a solar photovoltaic (PV) farm in pre-construction in Armero, Tolima, Colombia.
Project Details
Table 1: Phase-level project details for Aes Solar 3
| Status | Commissioning year | Nameplate capacity | Technology |
|---|---|---|---|
| Pre-construction[1] | 2026 (planned)[2] | 100 MWac[2] | PV[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Aes Solar 3
| Location | Coordinates (WGS 84) |
|---|---|
| Armero, Tolima, Colombia[2] | 4.9624, -74.9050 (approximate)[2] |
The map below shows the approximate location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ (PDF) https://www.mininterior.gov.co/wp-content/uploads/2024/12/resolucion-procedencia-de-consulta-previa-st-1328-de-2024.pdf https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx, https://www.mininterior.gov.co/wp-content/uploads/2024/12/resolucion-procedencia-de-consulta-previa-st-1328-de-2024.pdf.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 2.0 2.1 2.2 2.3 2.4 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
