Aes Solar 3

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Parque Solar Girasoles - AES Solar 3

Aes Solar 3 (AES Solar 3) is a solar photovoltaic (PV) farm in pre-construction in Armero, Tolima, Colombia.

Project Details

Table 1: Phase-level project details for Aes Solar 3

Status Commissioning year Nameplate capacity Technology
Pre-construction[1] 2026 (planned)[2] 100 MWac[2] PV[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Aes Solar 3

Location Coordinates (WGS 84)
Armero, Tolima, Colombia[2] 4.9624, -74.9050 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ (PDF) https://www.mininterior.gov.co/wp-content/uploads/2024/12/resolucion-procedencia-de-consulta-previa-st-1328-de-2024.pdf https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx, https://www.mininterior.gov.co/wp-content/uploads/2024/12/resolucion-procedencia-de-consulta-previa-st-1328-de-2024.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.