Agroi (Akuo Energy) solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Agroi (Akuo Energy) solar farm (Αγροι 2, Αγροι 1) is a solar photovoltaic (PV) farm in pre-construction in Kozani Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece.
Project Details
Table 1: Phase-level project details for Agroi (Akuo Energy) solar farm
Phase name | Status | Nameplate capacity | Technology | Owner |
---|---|---|---|---|
1 | Pre-construction[1] | 50 MWp/dc[1] | PV[1] | Kozani Energy Solar[1] |
2 | Pre-construction[1] | 30 MWp/dc[1] | PV[1] | Kozani Energy Solar[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Agroi (Akuo Energy) solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Kozani Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece[1] | 40.4221, 21.9209 (exact)[1] |
2 | Kozani Regional Unit, Western Macedonia, Epirus and Western Macedonia, Greece[1] | 40.4183, 21.9378 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References