Agua Caliente Solar Project

From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project.

Agua Caliente Solar Project is an operating solar farm in Yuma County, Arizona, United States.


Project Details

The solar farm has four phase that is at least 20 MW. (Read more about solar capacity ratings.)

Table 1: Phase-level project details for Agua Caliente Solar Project

Phase name Status Commissioning year Nameplate capacity Owner
1 Operating[1] 2012[1] 91 MWac[1] Clearway Energy [51%]; Berkshire Hathaway Energy [49%][2]
2 Operating[1] 2012[1] 136 MWac[1] Clearway Energy [51%]; Berkshire Hathaway Energy [49%][2]
3 Operating[1] 2014[1] 121 MWac[1] Clearway Energy [51%]; Berkshire Hathaway Energy [49%][2]
4 Shelved[1] 290 MWac[1] Clearway Energy [51%]; Berkshire Hathaway Energy [49%][2]

Location

Table 2: Phase-level location details for Agua Caliente Solar Project

Phase name Location Coordinates (WGS 84)
1 Yuma County, Arizona, United States[1] 32.9774, -113.495 (exact)[1]
2 Yuma County, Arizona, United States[1] 32.9774, -113.495 (exact)[1]
3 Yuma County, Arizona, United States[1] 32.9774, -113.495 (exact)[1]
4 Yuma County, Arizona, United States[1] 32.9774, -113.495 (exact)[1]

The map below shows the exact locations of the solar farm phases:

Loading map...


Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Retrieved May 21, 2021.
  2. 2.0 2.1 2.2 2.3 "Global M&A By The Numbers: Q3 2021". Sp Global. Archived from the original on November 7, 2021. Retrieved January 18, 2022.