Aguascalientes Sur Photovoltaic Solar Power Plant

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Parque Solar Aguascalientes Sur I (Phase 1)

Aguascalientes Sur Photovoltaic Solar Power Plant (Parque Solar Aguascalientes Sur) is an operating solar photovoltaic (PV) farm in Aguascalientes, Mexico.

Project Details

Table 1: Phase-level project details for Aguascalientes Sur Photovoltaic Solar Power Plant

Phase name Status Commissioning year Nameplate capacity Technology Owner
1 Operating[1] 2019[2] 29.7 MWac[1] PV[1] OPDE Group [100%][2]
2 Shelved (inferred January 2025) – 193.5 MW[3] PV[3] Solar de la Sierra SAPI de CV [100%][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Aguascalientes Sur Photovoltaic Solar Power Plant

Phase Name Location Coordinates (WGS 84)
1 Aguascalientes, Mexico[1] 21.7617, -102.2156 (exact)[1]
2 Aguascalientes, Aguascalientes, Mexico[5] 21.8806, -102.2965 (approximate)[5]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240201171619/https://asolmex.org/centrales-solares/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 https://web.archive.org/web/20240206164045/https://expansion.mx/empresas/2019/09/26/opdenery-construira-dos-plantas-solares-en-mexico-con-una-inversion-de-86-mdd. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 "Tabla de Permisos 2021" (PDF). CRE (Comisión Reguladora de Energía). Archived from the original (PDF) on 2024-01-25.
  4. ↑ https://igavim.org/Documentos%20Generados/Documentos%20Generales/2022%20PermisosCREhasta2021.pdf, http://geocomunes.org/Visualizadores/SistemaElectricoMexico/, https://www.pv-magazine-mexico.com/2018/11/20/nuevo-proyecto-para-un-estado-pujante/ https://apps1.semarnat.gob.mx:8443/dgiraDocs/documentos/ags/estudios/2018/01AG2018E0040.pdf, https://igavim.org/Documentos%20Generados/Documentos%20Generales/2022%20PermisosCREhasta2021.pdf, http://geocomunes.org/Visualizadores/SistemaElectricoMexico/, https://www.pv-magazine-mexico.com/2018/11/20/nuevo-proyecto-para-un-estado-pujante/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. ↑ 5.0 5.1 https://energia.conacyt.mx/planeas/electricidad/capacidad-generacion https://apps1.semarnat.gob.mx:8443/dgiraDocs/documentos/ags/estudios/2018/01AG2018E0040.pdf, https://energia.conacyt.mx/planeas/electricidad/capacidad-generacion. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)