Aguascalientes Sur Photovoltaic Solar Power Plant (Parque Solar Aguascalientes Sur) is an operating solar photovoltaic (PV) farm in Aguascalientes, Mexico.
Project Details
Table 1: Phase-level project details for Aguascalientes Sur Photovoltaic Solar Power Plant
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner |
|---|---|---|---|---|---|
| 1 | Operating[1] | 2019[2] | 29.7 MWac[1] | PV[1] | OPDE Group [100%][2] |
| 2 | Shelved (inferred January 2025) | – | 193.5 MW[3] | PV[3] | Solar de la Sierra SAPI de CV [100%][4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Aguascalientes Sur Photovoltaic Solar Power Plant
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Aguascalientes, Mexico[1] | 21.7617, -102.2156 (exact)[1] |
| 2 | Aguascalientes, Aguascalientes, Mexico[5] | 21.8806, -102.2965 (approximate)[5] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240201171619/https://asolmex.org/centrales-solares/. Archived from the original on 2024-02-01.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://web.archive.org/web/20240206164045/https://expansion.mx/empresas/2019/09/26/opdenery-construira-dos-plantas-solares-en-mexico-con-una-inversion-de-86-mdd. Archived from the original on 2024-02-06.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 "Tabla de Permisos 2021" (PDF). CRE (Comisión Reguladora de Energía). Archived from the original (PDF) on 2024-01-25.
- ↑ https://igavim.org/Documentos%20Generados/Documentos%20Generales/2022%20PermisosCREhasta2021.pdf, http://geocomunes.org/Visualizadores/SistemaElectricoMexico/, https://www.pv-magazine-mexico.com/2018/11/20/nuevo-proyecto-para-un-estado-pujante/ https://apps1.semarnat.gob.mx:8443/dgiraDocs/documentos/ags/estudios/2018/01AG2018E0040.pdf, https://igavim.org/Documentos%20Generados/Documentos%20Generales/2022%20PermisosCREhasta2021.pdf, http://geocomunes.org/Visualizadores/SistemaElectricoMexico/, https://www.pv-magazine-mexico.com/2018/11/20/nuevo-proyecto-para-un-estado-pujante/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 5.0 5.1 https://energia.conacyt.mx/planeas/electricidad/capacidad-generacion https://apps1.semarnat.gob.mx:8443/dgiraDocs/documentos/ags/estudios/2018/01AG2018E0040.pdf, https://energia.conacyt.mx/planeas/electricidad/capacidad-generacion.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)