Aguayo wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Aguayo wind farm is a wind farm in pre-construction in Campoo de Enmedio, Cantabria, Spain.
Project Details
Table 1: Phase-level project details for Aguayo wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Operator |
---|---|---|---|---|---|
1 | Pre-construction[1] | – | 50 MW[1] | Onshore[1] | Generadora Eléctrica Verde III SL[2] |
2 | Construction[3] | 2023 (planned)[3] | 50 MW[2] | Onshore[2] | Generadora Eléctrica Verde III SL[4] |
3 | Construction[5] | 2023 (planned)[5] | 50 MW[4] | Onshore[4] | Generadora Eléctrica Verde III SL[1] |
4 | Pre-construction[6] | – | 50 MW[6] | Onshore[6] | Generadora Eléctrica Verde III SL[6] |
5 | Pre-construction[7] | – | 50 MW[7] | Onshore[7] | Generadora Eléctrica Verde III SL[7] |
Location
Table 2: Phase-level location details for Aguayo wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Campoo de Enmedio, Cantabria, Spain[2] | 42.9669, -4.0301 (approximate)[1] |
2 | Campoo de Enmedio, Cantabria, Spain[4] | 43.0026, -4.1077 (approximate)[2] |
3 | Las Rozas de Valdearroyo, Cantabria, Spain[1] | 43.0026, -4.1077 (approximate)[4] |
4 | Luena, Cantabria, Spain[6] | 43.1118, -3.907 (approximate)[6] |
5 | Santiurde de Toranzo, Cantabria, Spain[7] | 43.2372, -3.9395 (approximate)[7] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/14983032.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/16292496.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 https://www.power-technology.com/marketdata/aguayo-2-wind-farm-spain/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/16293680.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://www.power-technology.com/marketdata/aguayo-3-wind-farm-spain/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 6.0 6.1 6.2 6.3 6.4 6.5 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/14983222.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 7.0 7.1 7.2 7.3 7.4 7.5 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/14983280.
{{cite web}}
: Missing or empty|title=
(help)