Aguayo wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Aguayo wind farm is a wind farm under construction in Campoo de Enmedio, Cantabria, Spain.


Project Details

Table 1: Phase-level project details for Aguayo wind farm

Phase name Status Commissioning year Nameplate capacity Mount type Operator
1 Pre-construction[1] 50[1] Onshore Generadora Eléctrica Verde III SL[2]
2 Construction[3] 2023 (planned)[3] 50[2] Onshore Generadora Eléctrica Verde III SL[4]
3 Construction[5] 2023 (planned)[5] 50[4] Onshore Generadora Eléctrica Verde III SL[1]
4 Pre-construction[6] 50[6] Onshore Generadora Eléctrica Verde III SL[6]
5 Pre-construction[7] 50[7] Onshore Generadora Eléctrica Verde III SL[7]


Location

Table 2: Phase-level location details for Aguayo wind farm

Phase name Location Coordinates (WGS 84)
1 Campoo de Enmedio, Cantabria, Spain[2] 42.9669, -4.0301 (approximate)[1]
2 Campoo de Enmedio, Cantabria, Spain[4] 43.0026, -4.1077 (approximate)[2]
3 Las Rozas de Valdearroyo, Cantabria, Spain[1] 43.0026, -4.1077 (approximate)[4]
4 Luena, Cantabria, Spain[6] 43.1118, -3.9070 (approximate)[6]
5 Santiurde de Toranzo, Cantabria, Spain[7] 43.2372, -3.9395 (approximate)[7]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Background

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 "Detalle". Gobierno de Cantabria. Archived from the original on September 10, 2021. Retrieved November 29, 2021.
  2. 2.0 2.1 2.2 2.3 "Detalle - Dirección General De Industria, Comercio Y Consumo". Gobierno de Cantabria. Archived from the original on September 6, 2021. Retrieved November 29, 2021.
  3. 3.0 3.1 https://www.power-technology.com/marketdata/aguayo-2-wind-farm-spain/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 "Detalle - Dirección General De Industria, Comercio Y Consumo". Gobierno de Cantabria. Archived from the original on September 6, 2021. Retrieved November 29, 2021.
  5. 5.0 5.1 https://www.power-technology.com/marketdata/aguayo-3-wind-farm-spain/. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 "Información Pública Expediente Eol-32/2020 - Parque Eólico Aguayo 4". Gobierno De Cantabria. Archived from the original on September 9, 2021. Retrieved November 30, 2021.
  7. 7.0 7.1 7.2 7.3 7.4 "Detalle - Dirección General De Industria, Comercio Y Consumo". Gobierno de Cantabria. Archived from the original on September 10, 2021. Retrieved November 29, 2021.