Aguayo wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Aguayo wind farm is a wind farm in pre-construction in Campoo de Enmedio, Cantabria, Spain.

Project Details

Table 1: Phase-level project details for Aguayo wind farm

Phase name Status Commissioning year Nameplate capacity Type Operator
1 Pre-construction[1] 50 MW[1] Onshore[1] Generadora Eléctrica Verde III SL[2]
2 Construction[3] 2023 (planned)[3] 50 MW[2] Onshore[2] Generadora Eléctrica Verde III SL[4]
3 Construction[5] 2023 (planned)[5] 50 MW[4] Onshore[4] Generadora Eléctrica Verde III SL[1]
4 Pre-construction[6] 50 MW[6] Onshore[6] Generadora Eléctrica Verde III SL[6]
5 Pre-construction[7] 50 MW[7] Onshore[7] Generadora Eléctrica Verde III SL[7]

Location

Table 2: Phase-level location details for Aguayo wind farm

Phase Name Location Coordinates (WGS 84)
1 Campoo de Enmedio, Cantabria, Spain[2] 42.9669, -4.0301 (approximate)[1]
2 Campoo de Enmedio, Cantabria, Spain[4] 43.0026, -4.1077 (approximate)[2]
3 Las Rozas de Valdearroyo, Cantabria, Spain[1] 43.0026, -4.1077 (approximate)[4]
4 Luena, Cantabria, Spain[6] 43.1118, -3.907 (approximate)[6]
5 Santiurde de Toranzo, Cantabria, Spain[7] 43.2372, -3.9395 (approximate)[7]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/14983032. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/16292496. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.power-technology.com/marketdata/aguayo-2-wind-farm-spain/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/16293680. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://www.power-technology.com/marketdata/aguayo-3-wind-farm-spain/. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 6.4 6.5 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/14983222. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 7.4 7.5 https://dgicc.cantabria.es/detalle/-/journal_content/56_INSTANCE_DETALLE/16626/14983280. {{cite web}}: Missing or empty |title= (help)